PropMap.ai

Compare projects

Up to 3 projects side by side, as filed with TG-RERA. Each name opens the full record and its sources. PropMap.ai does not pick a winner.

FactSahasra Phase 2Urban Springs
Joshita Infra Housing LLPPuram Gopi Krishna
RERA number P02100009377RERA number P02100005989
Registered nowRegistration ended
RemoveRemove
Findings from the TG-RERA record
FindingsConstructionRegistrationCompletion

Sahasra Phase 2

  • ConstructionOf the 5 facilities this layout's filing lists, the builder filed 0% done for street lighting and 55% for roads and footpaths, the highest, in a record last updated 21/10/2026. The completion date filed is 03/06/2027, 186 days away. PropMap.ai cannot tell whether the figures are out of date or the work is at that stage. Ask for: the latest dated progress certificate.

Urban Springs

  • RegistrationThe registration was valid until 14/06/2025, a date that has passed. TG-RERA listed no extension certificate when PropMap.ai read this project on 14/11/2026. Ask for: the extension order, or the occupancy certificate if the project is finished.
  • CompletionThe completion date the builder first filed, 14/06/2025, has passed, and the project status on TG-RERA still reads "New Project" (read 14/11/2026). Ask for: the occupancy certificate, or the revised completion date.
Completion
Completion date in force, as filed03/06/2027, as first filed14/06/2025, as first filedDate has passed
Valid until03/06/2027, extended (first certificate to 03/02/2027)14/06/2025
Extensions filedAt least 1, the latest valid until 03/06/2027Not read yet
Months added by extensions4 months (03/02/2027 to 03/06/2027)Not read yet
Inventory
Homes, total as filed326 plots221 plots
Homes booked, as filed126 plots183 plots
Booked share, as filed126 of 326 plots, 39%183 of 221 plots, 83%
Not booked, as filed200 plots38 plots
Unit choice
Configurations, as filedPlotsPlots
Size per configuration, as filedPlots: 142 to 976 sq ydPlots: 152 to 824 sq yd
Density
Land, total as filed23.90 acres; 23.16 acres net24.95 acres; 17.30 acres net
Homes per acre, as filed326 plots on 23.90 acres, 13.6 per acre221 plots on 24.95 acres, 8.9 per acre
Construction
Work declared, as filedFiled per facility; see the project pageFiled per facility; see the project page
Progress record last updated21/10/202621/09/2023
Physical
TowersNot filedNot filed
Most floors with homesNot filedNot filed
BasementsNot filedNot filed
Covered parking, as filedNot read yetNot read yet
Legal
Approval authorityDTCPDTCP
Plan approval number15/2025/HNot filed
Litigation, as declaredNone declared by the builderNone declared by the builder
Completion or occupancy certificate on TG-RERANot uploaded (read 14/11/2026)Not uploaded (read 14/11/2026)
Lifestyle
Facilities filed with TG-RERANone beyond the standard infrastructure rowsNone beyond the standard infrastructure rows
Other details
Registration numberP02100009377P02100005989
Registered on03/02/202501/04/2023
Drive at peak to Kollur≈ 140 minfrom an approximate position≈ 148 minfrom an approximate position
Drive at peak to Tellapur≈ 142 minfrom an approximate position≈ 149 minfrom an approximate position
Drive at peak to Patancheru≈ 152 minfrom an approximate position≈ 159 minfrom an approximate position
Nearby (OpenStreetMap, 2 km)
Schools within 2 kmabout 1from an approximate positionabout 0from an approximate position
Hospitals within 2 kmabout 1from an approximate positionabout 0from an approximate position
Nearest metro or railway stationRailway, about 2.3 kmfrom an approximate positionRailway, about 7.0 kmfrom an approximate position
Source
Record and read dateTG-RERA, read 14/11/2026TG-RERA, read 14/11/2026

32 of 35 rows are shown: the findings and the core rows, which are always shown, and every other row where these projects differ.

Nearby counts are places mapped on OpenStreetMap within 2 km of each project's map position, in a straight line; a place missing from the map is not counted.

Drive times are PropMap.ai estimates for peak hours from OpenStreetMap road data, not live traffic. Each project's page lists more places.

“None” covers only PropMap.ai's rules on each project's record, as read on the date in its column. It is not a clear title or a legal all-clear.

Orders and complaints are not compared here. Each project's Background Check report lists the TG-RERA orders that name it, after a compliance review.

Printed from PropMap.ai. Open this list again: /compare?ids=0ec82368-bd4f-4538-af1d-51295041cfd4,4e55e11a-eadc-472c-b4cf-15cc97b92593

All-in cost from a quoted price

Optional. PropMap.ai holds no prices: you type what the builder quoted.

TG-RERA publishes no prices and PropMap.ai copies none. Type the price the builder quoted you. Stamp duty, registration and GST are added, each with its source. What you type is kept on this device only and is not sent to PropMap.ai.

Sahasra Phase 2
Urban Springs
Your loan and your ceiling (typed once, used for every project; each is optional)

Your loan terms and ceiling are shared by all your quotes on this device. Removing a quote leaves them.