Filed update 28/04/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Registration status
Registration number
P02400005412Filed with TG-RERA
Registered on
03/12/2022Filed with TG-RERA
Valid until
20/02/2029, extended (first certificate to 20/10/2028)Filed with TG-RERA
Extensions
At least 1, the latest valid until 20/02/2029Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Constella
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Sreenagar Revenue Village,, Tukkuguda Municipality,, Maheshwaram, 501349Filed with TG-RERA
Mandal, district
Maheshwaram, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Shamshabad≈ 26 min at peak15 min without traffic
Rajiv Gandhi International Airport≈ 28 min at peak10 min without traffic
Adibatla (Aerospace SEZ area)≈ 29 min at peak13 min without traffic
All 42 places
Narsingi≈ 42 min at peak25 min without traffic
Documents
Documents uploaded
32 of 40 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 184 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 10%
Building table 20%
Building table 30%
Building table 40%
Building table 50%
Building table 60%
Building table 70%
Building table 80%
Building table 90%
Building table 100%
Building table 110%
Building table 120%
Building table 130%
Building table 140%
Building table 150%
Building table 160%
Building table 170%
Building table 180%
Building table 190%
Building table 200%
Building table 210%
Building table 220%
Building table 230%
Building table 240%
Building table 250%
Building table 260%
Building table 270%
Building table 280%
Building table 290%
Building table 300%
Building table 310%
Building table 320%
Building table 330%
Building table 340%
Building table 350%
Building table 360%
Building table 370%
Building table 380%
Building table 390%
Building table 400%
Building table 410%
Building table 420%
Building table 430%
Building table 440%
Building table 450%
Building table 460%
Building table 470%
Building table 480%
Building table 490%
Building table 500%
Building table 510%
Building table 520%
Building table 530%
Building table 540%
Building table 550%
Building table 560%
Building table 570%
Building table 580%
Building table 590%
Building table 600%
Building table 610%
Building table 620%
Building table 630%
Building table 640%
Building table 650%
Building table 660%
Building table 670%
Building table 680%
Building table 690%
Building table 700%
Building table 710%
Building table 720%
Building table 730%
Building table 740%
Building table 750%
Building table 760%
Building table 770%
Building table 780%
Building table 790%
Building table 800%
Building table 810%
Building table 820%
Building table 830%
Building table 840%
Building table 850%
Building table 860%
Building table 870%
Building table 880%
Building table 890%
Building table 900%
Building table 910%
Building table 920%
Building table 930%
Building table 940%
Building table 950%
Building table 960%
Building table 970%
Building table 980%
Building table 990%
Building table 1000%
Building table 1010%
Building table 1020%
Building table 1030%
Building table 1040%
Building table 1050%
Building table 1060%
Building table 1070%
Building table 1080%
Building table 1090%
Building table 1100%
Building table 1110%
Building table 1120%
Building table 1130%
Building table 1140%
Building table 1150%
Building table 1160%
Building table 1170%
Building table 1180%
Building table 1190%
Building table 1200%
Building table 1210%
Building table 1220%
Building table 1230%
Building table 1240%
Building table 1250%
Building table 1260%
Building table 1270%
Building table 1280%
Building table 1290%
Building table 1300%
Building table 1310%
Building table 1320%
Building table 1330%
Building table 1340%
Building table 1350%
Building table 1360%
Building table 1370%
Building table 1380%
Building table 1390%
Building table 1400%
Building table 1410%
Building table 1420%
Building table 1430%
Building table 1440%
Building table 1450%
Building table 1460%
Building table 1470%
Building table 1480%
Building table 1490%
Building table 1500%
Building table 1510%
Building table 1520%
Building table 1530%
Building table 1540%
Building table 1550%
Building table 1560%
Building table 1570%
Building table 1580%
Building table 1590%
Building table 1600%
Building table 1610%
Building table 1620%
Building table 1630%
Building table 1640%
Building table 1650%
Building table 1660%
Building table 1670%
Building table 1680%
Building table 1690%
Building table 1700%
Building table 1710%
Building table 1720%
Building table 1730%
Building table 1740%
Building table 1750%
Building table 1760%
Building table 1770%
Building table 1780%
Building table 1790%
Building table 1800%
Building table 1810%
Building table 1820%
Building table 1830%
Building table 1847%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 184 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (0%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 35 other projects in Maheshwaram mandal with a booked count, 6 declare a larger share booked, 29 a smaller one and 0 the same, as last filed (records last updated 08/06/2021 to 13/11/2026).
558 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Raidurg (Mindspace)≈ 45 min at peak28 min without traffic
Khajaguda≈ 45 min at peak27 min without traffic
DLF Cyber City, Gachibowli≈ 45 min at peak28 min without traffic
Gachibowli≈ 45 min at peak28 min without traffic
Financial District≈ 45 min at peak26 min without traffic
Kondapur≈ 48 min at peak29 min without traffic
Nanakramguda (Waverock)≈ 49 min at peak30 min without traffic
HITEC City≈ 50 min at peak30 min without traffic
Manikonda≈ 52 min at peak29 min without traffic
Mehdipatnam≈ 52 min at peak28 min without traffic
LB Nagar≈ 53 min at peak25 min without traffic
Koti≈ 53 min at peak25 min without traffic
Nampally station (Hyderabad Deccan)≈ 53 min at peak25 min without traffic
Lakdikapul≈ 55 min at peak26 min without traffic
Abids≈ 55 min at peak26 min without traffic
Kacheguda station≈ 56 min at peak25 min without traffic
Madhapur≈ 56 min at peak32 min without traffic
Tellapur≈ 57 min at peak35 min without traffic
Dilsukhnagar≈ 58 min at peak24 min without traffic
Pocharam (Infosys campus area)≈ 59 min at peak36 min without traffic
Kollur≈ 59 min at peak36 min without traffic
Panjagutta≈ 61 min at peak29 min without traffic
Jubilee Hills≈ 62 min at peak34 min without traffic
Banjara Hills≈ 62 min at peak30 min without traffic
Miyapur≈ 64 min at peak35 min without traffic
Ameerpet≈ 66 min at peak31 min without traffic
Patancheru≈ 66 min at peak42 min without traffic
Uppal≈ 66 min at peak31 min without traffic
Lingampally≈ 67 min at peak36 min without traffic
Kukatpally≈ 69 min at peak37 min without traffic
Secunderabad Junction≈ 70 min at peak31 min without traffic
Begumpet≈ 70 min at peak32 min without traffic
Shamirpet (Genome Valley area)≈ 72 min at peak46 min without traffic
Balanagar≈ 74 min at peak36 min without traffic
Moosapet≈ 75 min at peak35 min without traffic
Jeedimetla≈ 85 min at peak40 min without traffic
Kompally≈ 90 min at peak43 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02400005412 · by Speed Infra Developers LLP · Sreenagar Revenue Village,, Tukkuguda Municipality,, Maheshwaram, 501349
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
On recordRegistration is current until 20/02/2029
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 20/02/2029, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 40/LO/Plg/HMDA/2022 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 185 of 558 homes booked (record last updated 28/04/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
13 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02400005412
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400005412 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 183 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 0% of work (record last updated 28/04/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 9 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
0193 slabs filed
0203 slabs filed
0213 slabs filed
0223 slabs filed
0233 slabs filed
0243 slabs filed
0253 slabs filed
0263 slabs filed
0273 slabs filed
0283 slabs filed
0293 slabs filed
0303 slabs filed
0313 slabs filed
0323 slabs filed
0331 slabs filed
0343 slabs filed
0353 slabs filed
0363 slabs filed
0373 slabs filed
0383 slabs filed
0393 slabs filed
0403 slabs filed
0413 slabs filed
0423 slabs filed
0433 slabs filed
0443 slabs filed
0453 slabs filed
0463 slabs filed
0473 slabs filed
0483 slabs filed
0493 slabs filed
0503 slabs filed
0513 slabs filed
0523 slabs filed
0533 slabs filed
0543 slabs filed
0553 slabs filed
0563 slabs filed
0573 slabs filed
0583 slabs filed
0593 slabs filed
0603 slabs filed
0613 slabs filed
0621 slabs filed
0633 slabs filed
0643 slabs filed
0653 slabs filed
0663 slabs filed
0673 slabs filed
0683 slabs filed
0693 slabs filed
0703 slabs filed
0713 slabs filed
0723 slabs filed
0733 slabs filed
0743 slabs filed
0753 slabs filed
0763 slabs filed
0773 slabs filed
0783 slabs filed
0793 slabs filed
0803 slabs filed
0813 slabs filed
0823 slabs filed
0833 slabs filed
0843 slabs filed
0853 slabs filed
0863 slabs filed
0873 slabs filed
0883 slabs filed
0893 slabs filed
0903 slabs filed
0913 slabs filed
0923 slabs filed
0933 slabs filed
0943 slabs filed
0953 slabs filed
0963 slabs filed
0973 slabs filed
0983 slabs filed
0993 slabs filed
1003 slabs filed
1013 slabs filed
1023 slabs filed
1033 slabs filed
1043 slabs filed
1053 slabs filed
1063 slabs filed
1073 slabs filed
1083 slabs filed
1093 slabs filed
1103 slabs filed
1113 slabs filed
1123 slabs filed
1133 slabs filed
1143 slabs filed
1153 slabs filed
1163 slabs filed
1173 slabs filed
1183 slabs filed
1193 slabs filed
1203 slabs filed
1213 slabs filed
1223 slabs filed
1233 slabs filed
1243 slabs filed
1253 slabs filed
1263 slabs filed
1273 slabs filed
1283 slabs filed
1293 slabs filed
1303 slabs filed
1313 slabs filed
1323 slabs filed
1333 slabs filed
1343 slabs filed
1353 slabs filed
1363 slabs filed
1373 slabs filed
1383 slabs filed
1393 slabs filed
1403 slabs filed
1413 slabs filed
1423 slabs filed
1433 slabs filed
1443 slabs filed
1453 slabs filed
1463 slabs filed
1473 slabs filed
1483 slabs filed
1493 slabs filed
1503 slabs filed
1513 slabs filed
1523 slabs filed
1533 slabs filed
1543 slabs filed
1553 slabs filed
1563 slabs filed
1573 slabs filed
1583 slabs filed
1593 slabs filed
1603 slabs filed
1613 slabs filed
1623 slabs filed
1633 slabs filed
1643 slabs filed
1653 slabs filed
1663 slabs filed
1673 slabs filed
1683 slabs filed
1693 slabs filed
1703 slabs filed
1713 slabs filed
1723 slabs filed
1733 slabs filed
1743 slabs filed
1753 slabs filed
1763 slabs filed
1773 slabs filed
1783 slabs filed
1793 slabs filed
1803 slabs filed
1813 slabs filed
1823 slabs filed
1833 slabs filed
Amenities3 slabs filed
The site: land, built-up area, survey number
Land
26.60 acres
Net of road and water setbacks
24.55 acres
Approved built-up area
7,75,596 sq ft
Buildings on the approved plan
184
Towers with homes
183
Lost to road widening or a lake's full tank level
89,304 sq ft
Survey number
73 to 81, 83 to 95 & 97
Site boundaries
east
Neighbours Land
west
Road
north
Road
south
Road
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths23% declared
Water SupplyNot stated
Sewerage (Chamber, Lines, Septic Tank , STP)Not stated
Storm Water DrainsNot stated
Green Strip/TOT LOT/ParkNot stated
Street LightingNot stated
Community BuildingsNot stated
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water HarvestingNot stated
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving StationNot provided
Aggregate area of recreational Open SpaceNot stated
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.