Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
VB City
Registration. The registration was valid until 11/12/2024, a date that has passed. TG-RERA listed no extension certificate when PropMap.ai read this project on 14/11/2026. Ask for: the extension order, or the occupancy certificate if the project is finished.
Worked out by PropMap.ai from the dates on this page.
Completion. The completion date the builder first filed, 11/12/2024, has passed, and the project status on TG-RERA still reads "New Project" (read 14/11/2026). Ask for: the occupancy certificate, or the revised completion date.
Worked out by PropMap.ai from the dates on this page.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Declared progress
Left blank in the filing
Last updated on TG-RERA
25/05/2023Filed with TG-RERA
Actual completion
Not present in the filing
Occupancy certificate
Not present in the filing
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 17 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 112 other projects in Alwal mandal with a booked count, 17 declare a larger share booked, 95 a smaller one and 0 the same, as last filed (records last updated 05/04/2019 to 11/11/2026; 1 carries no date).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
1,040
295
842 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Location
Registered address
BOLARUM RAILWAY COLONY, SECUNDERABAD, Turkapally, Alwal, 500010Filed with TG-RERA
Mandal, district
Alwal, Medchal-MalkajgiriFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Kompally≈ 19 min at peak7 min without traffic
Jeedimetla≈ 26 min at peak10 min without traffic
Shamirpet (Genome Valley area)≈ 46 min at peak17 min without traffic
All 42 places
Secunderabad Junction≈ 48 min at peak17 min without traffic
Moosapet
Documents
Documents uploaded
47 of 55 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
15
Building table 680%
Building table 790%
Building table 890%
Building table 990%
Building table 1090%
Building table 1190%
Building table 1277.5%
Building table 1371.5%
Building table 1447%
Building table 1580%
Building table 1667%
Building table 170%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 17 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (76.6%).
Towers, floor by floor (17)
booked not booked, as declared.
BLOCK A5 floors with homes · 5 slabs filed · 70 homes, 65 booked
511 of 14
414 of 14
314 of 14
214 of 14
112 of 14
BLOCK B5 floors with homes · 5 slabs filed · 70 homes, 70 booked
514 of 14
414 of 14
314 of 14
BLOCK C5 floors with homes · 5 slabs filed · 70 homes, 67 booked
512 of 14
414 of 14
314 of 14
2
BLOCK D5 floors with homes · 5 slabs filed · 70 homes, 69 booked
514 of 14
414 of 14
314 of 14
BLOCK E5 floors with homes · 5 slabs filed · 70 homes, 69 booked
514 of 14
414 of 14
314 of 14
BLOCK F5 floors with homes · 5 slabs filed · 70 homes, 68 booked
514 of 14
414 of 14
314 of 14
BLOCK G5 floors with homes · 5 slabs filed · 70 homes, 59 booked
511 of 14
414 of 14
314 of 14
2
BLOCK H5 floors with homes · 5 slabs filed · 70 homes, 55 booked
57 of 14
411 of 14
312 of 14
2
BLOCK J5 floors with homes · 5 slabs filed · 70 homes, 55 booked
510 of 14
48 of 14
313 of 14
2
BLOCK K5 floors with homes · 5 slabs filed · 1 basement · 70 homes, 64 booked
511 of 14
414 of 14
314 of 14
2
BLOCK L5 floors with homes · 5 slabs filed · 1 basement · 70 homes, 66 booked
511 of 14
414 of 14
314 of 14
2
BLOCK M5 floors with homes · 5 slabs filed · 60 homes, 15 booked
54 of 12
44 of 12
32 of 12
24 of 12
11 of 12
BLOCK N5 floors with homes · 5 slabs filed · 60 homes, 0 booked
50 of 12
40 of 12
30 of 12
20 of 12
10 of 12
BLOCK P5 floors with homes · 5 slabs filed · 60 homes, 0 booked
50 of 12
40 of 12
30 of 12
20 of 12
10 of 12
BLOCK Q5 floors with homes · 5 slabs filed · 1 basement · 60 homes, 23 booked
53 of 12
47 of 12
36 of 12
24 of 12
1
BLOCK R5 floors with homes · 5 slabs filed · 1 basement · 30 homes, 0 booked
50 of 6
40 of 6
30 of 6
20 of 6
10 of 6
PROPOSED COMMERCIAL5 slabs filed · 1 basement
The site: land, built-up area, survey number
Land
11.90 acres
Approved built-up area
11,49,199 sq ft
Buildings on the approved plan
17
Towers with homes
16
Highest floor with homes
5 floors
Lost to road widening or a lake's full tank level
None filed
Survey number
70 & 71
Site boundaries
east
(name withheld) TO (name withheld) ROAD
west
RESIDENTIAL PLOTS
north
ROAD AND RESIDENTIAL COLONY
south
RAILWAY COLONY
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Water Supply95% declared
Sewerage (Chamber, Lines, Septic Tank , STP)95% declared
Storm Water Drains95% declared
Green Strip/TOT LOT/Park75% declared
Street Lighting90% declared
Community Buildings100% declared
Treatment And Disposal Of Sewage And Sullage Water100% declared
Solid Waste Management And Disposal90% declared
Water Conservation, Rain water Harvesting90% declared
Energy managementNot provided
Fire Protection And Fire Safety Requirements50% declared
Electrical Meter Room, Sub-Station, Receiving Station90% declared
Aggregate area of recreational Open Space80% declared
Internal Roads & Footpaths95% declared
Declared by the builder, not inspected.
Amenities (13)
badminton court
basketball court
clubhouse
cricket
gym
kids play area
landscaped garden
party hall
spa
supermarket
swimming pool
tennis court
yoga
Builder's site says · indis.co.in ↗ · read 13/11/2026
≈ 54 min at peak
21 min without traffic
Balanagar≈ 55 min at peak22 min without traffic
Ameerpet≈ 55 min at peak21 min without traffic
Begumpet≈ 55 min at peak21 min without traffic
Lakdikapul≈ 57 min at peak22 min without traffic
Panjagutta≈ 60 min at peak22 min without traffic
Kukatpally≈ 61 min at peak23 min without traffic
Abids≈ 61 min at peak23 min without traffic
Nampally station (Hyderabad Deccan)≈ 62 min at peak24 min without traffic
Koti≈ 64 min at peak24 min without traffic
Mehdipatnam≈ 66 min at peak26 min without traffic
Kacheguda station≈ 66 min at peak24 min without traffic
Patancheru≈ 68 min at peak37 min without traffic
Banjara Hills≈ 69 min at peak25 min without traffic
Uppal≈ 70 min at peak25 min without traffic
Miyapur≈ 72 min at peak29 min without traffic
Tellapur≈ 74 min at peak41 min without traffic
Pocharam (Infosys campus area)≈ 75 min at peak37 min without traffic
Jubilee Hills≈ 76 min at peak29 min without traffic
Dilsukhnagar≈ 76 min at peak29 min without traffic
Kollur≈ 78 min at peak42 min without traffic
HITEC City≈ 78 min at peak30 min without traffic
Madhapur≈ 81 min at peak31 min without traffic
Raidurg (Mindspace)≈ 83 min at peak31 min without traffic
Lingampally≈ 84 min at peak35 min without traffic
LB Nagar≈ 84 min at peak31 min without traffic
Kondapur≈ 86 min at peak32 min without traffic
Manikonda≈ 89 min at peak35 min without traffic
Financial District≈ 90 min at peak38 min without traffic
Kokapet≈ 90 min at peak40 min without traffic
Gachibowli≈ 91 min at peak35 min without traffic
Khajaguda≈ 91 min at peak36 min without traffic
DLF Cyber City, Gachibowli≈ 91 min at peak35 min without traffic
Nanakramguda (Waverock)≈ 92 min at peak41 min without traffic
Shamshabad≈ 93 min at peak42 min without traffic
Narsingi≈ 96 min at peak38 min without traffic
Adibatla (Aerospace SEZ area)≈ 104 min at peak49 min without traffic
Rajiv Gandhi International Airport≈ 116 min at peak47 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02200000165 · by VB City LLP · BOLARUM RAILWAY COLONY, SECUNDERABAD, Turkapally, Alwal, 500010
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
RegistrationRegistration ended on 11/12/2024
Ask for: the paper that extends the registration beyond that date, or the paper that certifies the project as complete.Question: “The registration has ended. Which paper extends it or closes it, and may I see it?” See the registration dates
Asked SeenDate: Note:
CompletionThe declared completion date (11/12/2024) has passed
Ask for: the new completion date in writing and, if it exists, the paper that allows people to move in.Question: “What is the new completion date, and has permission to occupy been given for my block?” See declared progress
Asked SeenDate: Note:
On recordThe builder declared 745 of 1,040 homes booked (record last updated 25/05/2023)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (842 to 842 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
8 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02200000165
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200000165 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 16 buildings, the tallest with 5 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 13 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.