Filed update 20/02/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Registration status
Registration number
P02200008722Filed with TG-RERA
Registered on
30/08/2024Filed with TG-RERA
Valid until
28/10/2027, extended (first certificate to 28/06/2027)Filed with TG-RERA
Extensions
At least 1, the latest valid until 28/10/2027Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Raichandani Akshaya Serenity
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Uppal≈ 43 min at peak15 min without traffic
Pocharam (Infosys campus area)≈ 47 min at peak20 min without traffic
Shamirpet (Genome Valley area)≈ 52 min at peak23 min without traffic
All 42 places
Secunderabad Junction≈ 52 min at peak17 min without traffic
LB Nagar
Documents
Documents uploaded
35 of 41 document slotsFiled with TG-RERA
Document groups on the record
3 (8 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 83 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 10%
Building table 20%
Building table 30%
Building table 40%
Building table 50%
Building table 60%
Building table 70%
Building table 80%
Building table 90%
Building table 100%
Building table 110%
Building table 120%
Building table 130%
Building table 140%
Building table 150%
Building table 160%
Building table 170%
Building table 180%
Building table 190%
Building table 200%
Building table 210%
Building table 220%
Building table 230%
Building table 240%
Building table 250%
Building table 260%
Building table 270%
Building table 280%
Building table 290%
Building table 300%
Building table 310%
Building table 320%
Building table 330%
Building table 340%
Building table 350%
Building table 360%
Building table 370%
Building table 380%
Building table 390%
Building table 400%
Building table 410%
Building table 420%
Building table 430%
Building table 440%
Building table 450%
Building table 460%
Building table 470%
Building table 480%
Building table 490%
Building table 500%
Building table 510%
Building table 520%
Building table 530%
Building table 540%
Building table 550%
Building table 560%
Building table 570%
Building table 580%
Building table 590%
Building table 600%
Building table 610%
Building table 620%
Building table 630%
Building table 640%
Building table 650%
Building table 660%
Building table 670%
Building table 680%
Building table 690%
Building table 700%
Building table 710%
Building table 720%
Building table 730%
Building table 740%
Building table 750%
Building table 760%
Building table 770%
Building table 780%
Building table 790%
Building table 800%
Building table 810%
Building table 820%
Building table 830%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 83 building tables, no project figure filed.
This filing's proposed completion date is 28/10/2027: of 7 other filings under the same TG-RERA promoter record, 5 have a later date, 2 an earlier one and 0 the same, as last filed (records last updated 03/02/2026).
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (0%).
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 55 other projects in Kapra mandal with a booked count, 8 declare a larger share booked, 0 a smaller one and 47 the same, as last filed (records last updated 05/03/2019 to 14/10/2026).
86 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (83)
booked not booked, as declared.
Villa No 12 slabs filedVilla No 22 slabs filedVilla No 32 slabs filedVilla No 42 slabs filedVilla No 52 slabs filedVilla No 62 slabs filedVilla No 72 slabs filedVilla No 82 slabs filedVilla No 92 slabs filedVilla No 102 slabs filedVilla No 112 slabs filedVilla No 122 slabs filedVilla No 132 slabs filedVilla No 142 slabs filedVilla No 152 slabs filedVilla No 162 slabs filed
≈ 56 min at peak
22 min without traffic
Kacheguda station≈ 58 min at peak20 min without traffic
Dilsukhnagar≈ 63 min at peak23 min without traffic
Koti≈ 64 min at peak22 min without traffic
Jeedimetla≈ 65 min at peak22 min without traffic
Begumpet≈ 67 min at peak23 min without traffic
Abids≈ 68 min at peak23 min without traffic
Lakdikapul≈ 68 min at peak23 min without traffic
Nampally station (Hyderabad Deccan)≈ 69 min at peak25 min without traffic
Kompally≈ 69 min at peak24 min without traffic
Panjagutta≈ 72 min at peak24 min without traffic
Ameerpet≈ 73 min at peak24 min without traffic
Moosapet≈ 76 min at peak26 min without traffic
Balanagar≈ 77 min at peak26 min without traffic
Mehdipatnam≈ 77 min at peak27 min without traffic
Banjara Hills≈ 81 min at peak28 min without traffic
Kukatpally≈ 83 min at peak29 min without traffic
Adibatla (Aerospace SEZ area)≈ 83 min at peak40 min without traffic
Patancheru≈ 91 min at peak44 min without traffic
Jubilee Hills≈ 92 min at peak31 min without traffic
Miyapur≈ 94 min at peak34 min without traffic
Tellapur≈ 98 min at peak52 min without traffic
Manikonda≈ 100 min at peak36 min without traffic
Madhapur≈ 100 min at peak33 min without traffic
HITEC City≈ 100 min at peak35 min without traffic
Shamshabad≈ 101 min at peak41 min without traffic
Kollur≈ 102 min at peak53 min without traffic
Raidurg (Mindspace)≈ 104 min at peak36 min without traffic
Khajaguda≈ 106 min at peak37 min without traffic
Lingampally≈ 106 min at peak39 min without traffic
Rajiv Gandhi International Airport≈ 106 min at peak45 min without traffic
Kondapur≈ 108 min at peak37 min without traffic
Gachibowli≈ 108 min at peak38 min without traffic
Narsingi≈ 109 min at peak39 min without traffic
DLF Cyber City, Gachibowli≈ 110 min at peak38 min without traffic
Financial District≈ 112 min at peak40 min without traffic
Kokapet≈ 114 min at peak41 min without traffic
Nanakramguda (Waverock)≈ 116 min at peak43 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02200008722 · by Raichandani Constructions · CHERLAPALLI, Kapra, 501301
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
On recordRegistration is current until 28/10/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 28/10/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 6079/GHMC/LBN/2024-LO is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 0 of 86 homes booked (record last updated 20/02/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
21 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02200008722
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200008722 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 82 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 0% of work (record last updated 20/02/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Villa No 172 slabs filed
Villa No 182 slabs filed
Villa No 192 slabs filed
Villa No 202 slabs filed
Villa No 212 slabs filed
Villa No 222 slabs filed
Villa No 232 slabs filed
Villa No 242 slabs filed
Villa No 252 slabs filed
Villa No 262 slabs filed
Villa No 272 slabs filed
Villa No 282 slabs filed
Villa No 292 slabs filed
Villa No 302 slabs filed
Villa No 312 slabs filed
Villa No 322 slabs filed
Villa No 332 slabs filed
Villa No 342 slabs filed
Villa No 352 slabs filed
Villa No 362 slabs filed
Villa No 372 slabs filed
Villa No 382 slabs filed
Villa No 392 slabs filed
Villa No 402 slabs filed
Villa No 412 slabs filed
Villa No 422 slabs filed
Villa No 432 slabs filed
Villa No 442 slabs filed
Villa No 452 slabs filed
Villa No 462 slabs filed
Villa No 472 slabs filed
Villa No 482 slabs filed
Villa No 492 slabs filed
Villa No 502 slabs filed
Villa No 512 slabs filed
Villa No 522 slabs filed
Villa No 532 slabs filed
Villa No 542 slabs filed
Villa No 552 slabs filed
Villa No 562 slabs filed
Villa No 572 slabs filed
Villa No 582 slabs filed
Villa No 592 slabs filed
Villa No 602 slabs filed
Villa No 612 slabs filed
Villa No 622 slabs filed
Villa No 632 slabs filed
Villa No 642 slabs filed
Villa No 652 slabs filed
Villa No 662 slabs filed
Villa No 672 slabs filed
Villa No 682 slabs filed
Villa No 692 slabs filed
Villa No 702 slabs filed
Villa No 712 slabs filed
Villa No 722 slabs filed
Villa No 732 slabs filed
Villa No 742 slabs filed
Villa No 752 slabs filed
Villa No 762 slabs filed
Villa No 772 slabs filed
Villa No 782 slabs filed
Villa No 792 slabs filed
Villa No 802 slabs filed
Villa No 812 slabs filed
Villa No 822 slabs filed
Club House4 slabs filed
The site: land, built-up area, survey number
Land
6.56 acres
Net of road and water setbacks
6.33 acres
Approved built-up area
3,30,298 sq ft
Buildings on the approved plan
83
Towers with homes
82
Lost to road widening or a lake's full tank level
9,968 sq ft
Survey number
SY NOS 36,37,38 AND 291
Site boundaries
east
40 FEET WIDE ROAD
west
40 FEET WIDE ROAD
north
SILVER OAK VILLAS BY MODI BUILDERS
south
SILVER OAK VILLAS BY MODI BUILDERS
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open Space0% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.