From the builder's website. Pictures may be artist's impressions.
Status, as filed
Left blank in the filingwork declared by the builder, 3 building tables
Building table 10.4%
Building table 20.4%
Building table 30.4%
Filed update 22/05/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its , after a compliance review, with the sources searched and their dates.
Pictures and plans
17 held
All 17 pictures and plans
Pictures and plans 17
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02400003031Filed with TG-RERA
Registered on
17/06/2021Filed with TG-RERA
Valid until
31/10/2025Filed with TG-RERA
Extensions
At least 1, the latest valid until 28/02/2027Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Kokapet≈ 4 min at peak2 min without traffic
Financial District≈ 13 min at peak5 min without traffic
Narsingi≈ 16 min at peak6 min without traffic
All 42 places
Raidurg (Mindspace)≈ 19 min at peak10 min without traffic
Gachibowli≈ 19 min at peak
Documents
Documents uploaded
39 of 48 document slotsFiled with TG-RERA
Document groups on the record
3 (6 documents)Filed with TG-RERA
Pictures and plans held
17
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 3 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 10.4%
Building table 20.4%
Building table 30.4%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 3 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (0.4%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
2, 3, 4, 5, 6 BHK · 1,075 to 5,802 sq ftFiled with TG-RERA
Types, sizes, bookings and the cost calculator
593 of 1,106 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 352 other projects in Gandipet mandal with a booked count, 52 declare a larger share booked, 300 a smaller one and 0 the same, as last filed (records last updated 12/12/2018 to 23/11/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
414
184
1,075 to 1,210 sq ft
3 BHK
612
286
1,471 to 2,211 sq ft
4 BHK
68
32
2,371 to 2,401 sq ft
5 BHK
6
5
4,282 to 5,002 sq ft
6 BHK
6
6
5,402 to 5,802 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Home types and sizes
Listed on the builder's website but not in the filing. Ask the builder which is right.
TOWER-135 floors with homes · 35 slabs filed · 3 basements · 478 homes, 248 booked
359 of 14
340 of 14
33
8 min without traffic
Khajaguda≈ 19 min at peak9 min without traffic
DLF Cyber City, Gachibowli≈ 19 min at peak9 min without traffic
Nanakramguda (Waverock)≈ 20 min at peak8 min without traffic
Kondapur≈ 22 min at peak10 min without traffic
HITEC City≈ 24 min at peak11 min without traffic
Tellapur≈ 26 min at peak13 min without traffic
Manikonda≈ 27 min at peak10 min without traffic
Kollur≈ 28 min at peak14 min without traffic
Madhapur≈ 31 min at peak14 min without traffic
Shamshabad≈ 34 min at peak19 min without traffic
Patancheru≈ 35 min at peak21 min without traffic
Jubilee Hills≈ 36 min at peak15 min without traffic
Miyapur≈ 38 min at peak16 min without traffic
Mehdipatnam≈ 39 min at peak16 min without traffic
Lingampally≈ 41 min at peak16 min without traffic
Kukatpally≈ 43 min at peak18 min without traffic
Banjara Hills≈ 48 min at peak19 min without traffic
Lakdikapul≈ 48 min at peak20 min without traffic
Balanagar≈ 48 min at peak20 min without traffic
Moosapet≈ 49 min at peak21 min without traffic
Panjagutta≈ 50 min at peak19 min without traffic
Rajiv Gandhi International Airport≈ 52 min at peak24 min without traffic
Ameerpet≈ 54 min at peak21 min without traffic
Nampally station (Hyderabad Deccan)≈ 54 min at peak21 min without traffic
Abids≈ 55 min at peak23 min without traffic
Koti≈ 58 min at peak24 min without traffic
Begumpet≈ 58 min at peak23 min without traffic
Kacheguda station≈ 63 min at peak25 min without traffic
Secunderabad Junction≈ 64 min at peak26 min without traffic
Adibatla (Aerospace SEZ area)≈ 67 min at peak37 min without traffic
Dilsukhnagar≈ 70 min at peak27 min without traffic
Shamirpet (Genome Valley area)≈ 74 min at peak45 min without traffic
Kompally≈ 74 min at peak35 min without traffic
LB Nagar≈ 76 min at peak31 min without traffic
Jeedimetla≈ 77 min at peak31 min without traffic
Uppal≈ 79 min at peak32 min without traffic
Pocharam (Infosys campus area)≈ 97 min at peak44 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
On recordRegistration is current until 28/02/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 28/02/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 040632/ZOA/R1/U6/HM is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 593 of 1,106 homes booked (record last updated 22/05/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,075 to 5,802 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
2 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02400003031
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400003031 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 3 buildings, the tallest with 35 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
11 of 14
3212 of 14
310 of 13
3012 of 14
2914 of 14
280 of 14
2712 of 14
2614 of 14
250 of 14
2413 of 14
230 of 14
2213 of 14
219 of 13
209 of 12
197 of 12
180 of 14
1713 of 14
1612 of 12
150 of 14
1412 of 14
1313 of 14
120 of 14
119 of 14
1013 of 14
93 of 14
814 of 14
74 of 14
610 of 14
510 of 14
40 of 14
30 of 14
20 of 12
10 of 12
TOWER-235 floors with homes · 35 slabs filed · 3 basements · 204 homes, 105 booked
350 of 6
346 of 6
336 of 6
320 of 6
315 of 5
306 of 6
290 of 6
286 of 6
275 of 6
260 of 6
253 of 6
246 of 6
230 of 6
221 of 6
214 of 5
205 of 6
190 of 6
186 of 6
175 of 6
160 of 6
156 of 6
146 of 6
130 of 6
126 of 6
116 of 6
100 of 6
95 of 6
86 of 6
70 of 6
62 of 6
54 of 6
40 of 6
30 of 6
20 of 4
10 of 4
TOWER-335 floors with homes · 35 slabs filed · 3 basements · 424 homes, 240 booked
357 of 12
340 of 12
3312 of 12
3212 of 12
310 of 11
3021 of 22
2912 of 12
2811 of 12
270 of 12
2612 of 12
2512 of 12
240 of 12
2312 of 12
2212 of 12
210 of 11
2011 of 12
1910 of 12
1812 of 12
170 of 12
1611 of 12
1511 of 12
140 of 12
1312 of 12
1212 of 12
110 of 12
1010 of 12
911 of 12
81 of 12
710 of 12
66 of 12
50 of 12
40 of 12
30 of 12
20 of 10
10 of 10
The site: land, built-up area, survey number
Land
11.00 acres
Net of road and water setbacks
9.50 acres
Approved built-up area
18,42,993 sq ft
Buildings on the approved plan
3
Towers with homes
3
Highest floor with homes
35 floors
Lost to road widening or a lake's full tank level
65,364 sq ft
Survey number
SY NO 90 OF KOKAPET VILLAGE
Site boundaries
east
NALA AND GOVERNMENT LAND
west
LAND IN SY NO 89 AND LAKE
north
LAND IN SY NO 90
south
GOVERNMENT LAND AND LAKE
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open Space0% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.
Listed nearby within 2 km
2 km: about 10 min drive at peak. Nearest first.
Hospitalsnone within 2 km
No hospitals on record within 2 km. Nearest hospital: , about 2.0 km.