Left blank in the filingwork declared by the builder, 3 building tables
Building table 190%
Building table 290%
Building table 374.3%
Filed update 14/10/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its , after a compliance review, with the sources searched and their dates.
Plans
2 held
All 2 plans
Plans filed with TG-RERA 2
Filed with TG-RERA by the builder, as uploaded. People's names are covered. Not checked by PropMap.ai.
Registration status
Registration number
P02400000970Filed with TG-RERA
Registered on
02/07/2019Filed with TG-RERA
Valid until
01/05/2029, extended (first certificate to 01/01/2029)Filed with TG-RERA
Extensions
At least 1, the latest valid until 01/05/2029Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Exact: the TG-RERA portal's map pinFiled with TG-RERA
Drive times, places nearby and other projects within 5 km
Drive times
LB Nagar≈ 26 min at peak11 min without traffic
Dilsukhnagar≈ 32 min at peak14 min without traffic
Uppal≈ 40 min at peak18 min without traffic
All 42 places
Koti≈ 45 min at peak20 min without traffic
Kacheguda station≈ 46 min at peak20 min without traffic
Abids≈ 50 min at peak
Documents
Documents uploaded
18 of 26 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
2
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 3 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 190%
Building table 290%
Building table 374.3%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 3 building tables, no project figure filed.
This filing's proposed completion date is 01/05/2029: of 6 other filings under the same TG-RERA promoter record, 3 have a later date, 3 an earlier one and 0 the same, as last filed (records last updated 27/11/2021 to 14/10/2026).
No change between PropMap.ai's reads of 05/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (84.8%).
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
Declared by the builder to TG-RERA, not checked against those projects.
Homes
Homes, total
310Filed with TG-RERA
Booked, as declared
208Filed with TG-RERA
Home types and sizes
2, 3 BHK · 746 to 1,334 sq ftFiled with TG-RERA
Types, sizes, bookings and the cost calculator
208 of 310 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 32 other projects in Hayathnagar mandal with a booked count, 3 declare a larger share booked, 29 a smaller one and 0 the same, as last filed (records last updated 29/01/2019 to 13/11/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
81
2
746 to 970 sq ft
3 BHK
229
100
1,146 to 1,334 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (3)
booked not booked, as declared.
BLOCK C6 floors with homes · 6 slabs filed · 1 basement · 64 homes, 64 booked
611 of 11
511 of 11
4
22 min without traffic
Nampally station (Hyderabad Deccan)≈ 50 min at peak22 min without traffic
Adibatla (Aerospace SEZ area)≈ 51 min at peak23 min without traffic
Pocharam (Infosys campus area)≈ 51 min at peak28 min without traffic
Lakdikapul≈ 52 min at peak23 min without traffic
Panjagutta≈ 59 min at peak27 min without traffic
Mehdipatnam≈ 61 min at peak26 min without traffic
Secunderabad Junction≈ 62 min at peak25 min without traffic
Ameerpet≈ 64 min at peak28 min without traffic
Shamirpet (Genome Valley area)≈ 65 min at peak37 min without traffic
Banjara Hills≈ 65 min at peak28 min without traffic
Begumpet≈ 68 min at peak30 min without traffic
Shamshabad≈ 69 min at peak33 min without traffic
Moosapet≈ 72 min at peak33 min without traffic
Balanagar≈ 74 min at peak33 min without traffic
Rajiv Gandhi International Airport≈ 74 min at peak34 min without traffic
Jubilee Hills≈ 79 min at peak33 min without traffic
Kukatpally≈ 80 min at peak36 min without traffic
Jeedimetla≈ 82 min at peak35 min without traffic
Kompally≈ 82 min at peak39 min without traffic
Manikonda≈ 84 min at peak35 min without traffic
Narsingi≈ 85 min at peak36 min without traffic
Kokapet≈ 86 min at peak38 min without traffic
Madhapur≈ 86 min at peak34 min without traffic
Raidurg (Mindspace)≈ 87 min at peak35 min without traffic
Khajaguda≈ 88 min at peak36 min without traffic
Gachibowli≈ 88 min at peak37 min without traffic
DLF Cyber City, Gachibowli≈ 88 min at peak37 min without traffic
Financial District≈ 88 min at peak38 min without traffic
Miyapur≈ 91 min at peak41 min without traffic
Kondapur≈ 91 min at peak38 min without traffic
HITEC City≈ 91 min at peak37 min without traffic
Nanakramguda (Waverock)≈ 92 min at peak42 min without traffic
Tellapur≈ 100 min at peak49 min without traffic
Kollur≈ 102 min at peak50 min without traffic
Lingampally≈ 103 min at peak44 min without traffic
Patancheru≈ 104 min at peak51 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
On recordRegistration is current until 01/05/2029
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 01/05/2029, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 1/C3/05335/2019 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 208 of 310 homes booked (record last updated 14/10/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (746 to 1,334 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
5 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02400000970
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400000970 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 3 buildings, the tallest with 6 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
On recordA registered address is on record
Look at: that the site you are shown is at the registered address, and what stands on each side of it.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the registered address
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
11 of 11
311 of 11
211 of 11
19 of 9
BLOCK D6 floors with homes · 6 slabs filed · 1 basement · 84 homes, 84 booked
614 of 14
514 of 14
414 of 14
314 of 14
214 of 14
114 of 14
BLOCK E6 floors with homes · 6 slabs filed · 1 basement · 162 homes, 60 booked
612 of 30
513 of 30
414 of 30
312 of 30
25 of 22
14 of 20
The site: land, built-up area, survey number
Land
4.01 acres
Net of road and water setbacks
3.98 acres
Approved built-up area
3,53,445 sq ft
Buildings on the approved plan
3
Towers with homes
3
Highest floor with homes
6 floors
Lost to road widening or a lake's full tank level
1,067 sq ft
Survey number
183(P), 203(P)
Site boundaries
east
LAND BELONGING TO VENDEE
west
ROAD
north
ROAD
south
NEIGHBOURS LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (15)
Storm Water Drains90% declared
Green Strip/TOT LOT/Park90% declared
Street Lighting90% declared
Community Buildings100% declared
Treatment And Disposal Of Sewage And Sullage Water100% declared
Solid Waste Management And Disposal100% declared
Water Conservation, Rain water Harvesting80% declared
Energy management100% declared
Fire Protection And Fire Safety Requirements100% declared
Electrical Meter Room, Sub-Station, Receiving Station100% declared
Aggregate area of recreational Open SpaceNot stated
Not provided
Internal Roads & Footpaths90% declared
Water Supply100% declared
Sewerage (Chamber, Lines, Septic Tank , STP)100% declared
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Exact location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.