Not present in the filingwork declared by the builder
Filed update 12/02/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Registration status
Registration number
P02100010664Filed with TG-RERA
Registered on
01/09/2025Filed with TG-RERA
Valid until
01/09/2028Filed with TG-RERA
Extensions
At least 1, the latest valid until 01/01/2029Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Jubilee Valley
It cannot know
price, availability, title, court cases or the site today.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 4 km, and a few were over 5 km off.
Narsingi≈ 155 min at peak54 min without traffic
Kokapet≈ 156 min at peak54 min without traffic
Raidurg (Mindspace)≈ 158 min at peak57 min without traffic
All 42 places
Khajaguda≈ 158 min at peak56 min without traffic
DLF Cyber City, Gachibowli≈ 158 min at peak
Documents
Documents uploaded
54 of 57 document slotsFiled with TG-RERA
Document groups on the record
4 (11 documents)Filed with TG-RERA
Pictures and plans held
0
Projects PropMap.ai lists, filed on TG-RERA under this name
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA, and booking figures may lag.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management
57 min without traffic
Gachibowli≈ 158 min at peak57 min without traffic
Financial District≈ 159 min at peak55 min without traffic
Kondapur≈ 161 min at peak58 min without traffic
Nanakramguda (Waverock)≈ 162 min at peak59 min without traffic
HITEC City≈ 163 min at peak59 min without traffic
Shamshabad≈ 163 min at peak59 min without traffic
Manikonda≈ 165 min at peak58 min without traffic
Mehdipatnam≈ 167 min at peak59 min without traffic
Madhapur≈ 170 min at peak61 min without traffic
Tellapur≈ 170 min at peak60 min without traffic
Kollur≈ 171 min at peak60 min without traffic
Jubilee Hills≈ 175 min at peak63 min without traffic
Lakdikapul≈ 176 min at peak63 min without traffic
Miyapur≈ 177 min at peak64 min without traffic
Patancheru≈ 180 min at peak63 min without traffic
Lingampally≈ 180 min at peak65 min without traffic
Panjagutta≈ 180 min at peak65 min without traffic
Rajiv Gandhi International Airport≈ 181 min at peak65 min without traffic
Banjara Hills≈ 181 min at peak64 min without traffic
Nampally station (Hyderabad Deccan)≈ 182 min at peak65 min without traffic
Kukatpally≈ 182 min at peak66 min without traffic
Abids≈ 183 min at peak66 min without traffic
Ameerpet≈ 185 min at peak66 min without traffic
Koti≈ 186 min at peak67 min without traffic
Balanagar≈ 187 min at peak68 min without traffic
Moosapet≈ 188 min at peak69 min without traffic
Begumpet≈ 189 min at peak68 min without traffic
Kacheguda station≈ 191 min at peak68 min without traffic
Secunderabad Junction≈ 192 min at peak70 min without traffic
Adibatla (Aerospace SEZ area)≈ 196 min at peak77 min without traffic
Dilsukhnagar≈ 198 min at peak70 min without traffic
LB Nagar≈ 205 min at peak75 min without traffic
Jeedimetla≈ 207 min at peak77 min without traffic
Uppal≈ 207 min at peak75 min without traffic
Kompally≈ 215 min at peak81 min without traffic
Shamirpet (Genome Valley area)≈ 219 min at peak91 min without traffic
Pocharam (Infosys campus area)≈ 226 min at peak88 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02100010664 · by M/S Drishti Homes & Others · Vikarabad, 501101
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
On recordRegistration is current until 01/01/2029
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 01/01/2029, when the registration ends?” See the registration dates
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
20 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P02100010664
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02100010664 the number on everything you give me?”
Asked SeenDate: Note:
The filing lists 12 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving StationNot provided
Aggregate area of recreational Open Space0% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 4 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.