Not present in the filingwork declared by the builder
Filed update 06/08/2021 · read 14/11/2026 · See filing >
What the record shows
Registration ended. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
Worked out by PropMap.ai's rules from the dates and figures filed, read 14/11/2026.
Registration. The registration was valid until 26/02/2024, a date that has passed. TG-RERA listed no extension certificate when PropMap.ai read this project on 14/11/2026. Ask for: the extension order, or the occupancy certificate if the project is finished.
Worked out by PropMap.ai from the dates on this page.
Plans
1 held
All 1 plan
Plans filed with TG-RERA 1
Filed with TG-RERA by the builder, as uploaded. People's names are covered. Not checked by PropMap.ai.
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Giga City
Completion. The completion date the builder first filed, 26/02/2024, has passed, and the project status on TG-RERA still reads "New Project" (read 14/11/2026). Ask for: the occupancy certificate, or the revised completion date.
Worked out by PropMap.ai from the dates on this page.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Declared progress
Not present in the filing
Last updated on TG-RERA
06/08/2021Filed with TG-RERA
Actual completion
Not present in the filing
Occupancy certificate
Not present in the filing
Task-by-task progress, dated certificates and changes between reads
Declared progress
Not found on TG-RERA. Ask the builder for the latest quarterly progress report filed with TG-RERA (Forms 1, 2 and 3).
No change between PropMap.ai's reads of 04/11/2026 and 14/11/2026 in the registration dates or completion date.
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
The counts in this filing did not look believable, so PropMap.ai does not show them. Ask the builder for the numbers in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Tukkuguda Municipality, Mankhal revenue Village, Maheshwaram, 501359Filed with TG-RERA
Mandal, district
Maheshwaram, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Shamshabad≈ 26 min at peak15 min without traffic
Rajiv Gandhi International Airport≈ 28 min at peak10 min without traffic
Adibatla (Aerospace SEZ area)≈ 29 min at peak13 min without traffic
All 42 places
Narsingi≈ 42 min at peak25 min without traffic
Documents
Documents uploaded
19 of 27 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
1
Earlier projects the builder declared (2)
Project
Homes
Promised
Finished
Vertex Prime
284
30/04/2014
24/03/2014
Vertex Sadguru krupa
396
31/12/2013
30/09/2013
Declared by the builder to TG-RERA, not checked against those projects.
The site: land, built-up area, survey number
Land
103.26 acres
Approved built-up area
44,98,159 sq ft
Lost to road widening or a lake's full tank level
None filed
Survey number
Part of Sy No. 82, 83,84, 85, 86,90, 92, 93,94, 95,773, 778,779, 774 and 777
Site boundaries
east
Part of Land (name withheld) survey No 92
west
Part of land in Sy No 779 and
north
50 Feet Road and Airport Boundry Wall
south
100 Ft Road and Part of Land in Sy No 774 82 88 87
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & FootpathsNot stated
Water SupplyNot stated
Sewerage (Chamber, Lines, Septic Tank , STP)Not stated
Storm Water DrainsNot stated
Green Strip/TOT LOT/ParkNot stated
Street LightingNot stated
Community BuildingsNot stated
Treatment And Disposal Of Sewage And Sullage WaterNot stated
Solid Waste Management And DisposalNot stated
Water Conservation, Rain water HarvestingNot stated
Energy managementNot stated
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving StationNot stated
Aggregate area of recreational Open SpaceNot stated
Declared by the builder, not inspected.
Kokapet
≈ 43 min at peak
26 min without traffic
Raidurg (Mindspace)≈ 45 min at peak28 min without traffic
Khajaguda≈ 45 min at peak27 min without traffic
DLF Cyber City, Gachibowli≈ 45 min at peak28 min without traffic
Gachibowli≈ 45 min at peak28 min without traffic
Financial District≈ 45 min at peak26 min without traffic
Kondapur≈ 48 min at peak29 min without traffic
Nanakramguda (Waverock)≈ 49 min at peak30 min without traffic
HITEC City≈ 50 min at peak30 min without traffic
Manikonda≈ 52 min at peak29 min without traffic
Mehdipatnam≈ 52 min at peak28 min without traffic
LB Nagar≈ 53 min at peak25 min without traffic
Koti≈ 53 min at peak25 min without traffic
Nampally station (Hyderabad Deccan)≈ 53 min at peak25 min without traffic
Lakdikapul≈ 55 min at peak26 min without traffic
Abids≈ 55 min at peak26 min without traffic
Kacheguda station≈ 56 min at peak25 min without traffic
Madhapur≈ 56 min at peak32 min without traffic
Tellapur≈ 57 min at peak35 min without traffic
Dilsukhnagar≈ 58 min at peak24 min without traffic
Pocharam (Infosys campus area)≈ 59 min at peak36 min without traffic
Kollur≈ 59 min at peak36 min without traffic
Panjagutta≈ 61 min at peak29 min without traffic
Jubilee Hills≈ 62 min at peak34 min without traffic
Banjara Hills≈ 62 min at peak30 min without traffic
Miyapur≈ 64 min at peak35 min without traffic
Ameerpet≈ 66 min at peak31 min without traffic
Patancheru≈ 66 min at peak42 min without traffic
Uppal≈ 66 min at peak31 min without traffic
Lingampally≈ 67 min at peak36 min without traffic
Kukatpally≈ 69 min at peak37 min without traffic
Secunderabad Junction≈ 70 min at peak31 min without traffic
Begumpet≈ 70 min at peak32 min without traffic
Shamirpet (Genome Valley area)≈ 72 min at peak46 min without traffic
Balanagar≈ 74 min at peak36 min without traffic
Moosapet≈ 75 min at peak35 min without traffic
Jeedimetla≈ 85 min at peak40 min without traffic
Kompally≈ 90 min at peak43 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02400002792 · by Vertex KLR Developers LLP · Tukkuguda Municipality, Mankhal revenue Village, Maheshwaram, 501359
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
RegistrationRegistration ended on 26/02/2024
Ask for: the paper that extends the registration beyond that date, or the paper that certifies the project as complete.Question: “The registration has ended. Which paper extends it or closes it, and may I see it?” See the registration dates
Asked SeenDate: Note:
CompletionThe declared completion date (26/02/2024) has passed
Ask for: the new completion date in writing and, if it exists, the paper that allows people to move in.Question: “What is the new completion date, and has permission to occupy been given for my block?” See declared progress
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
11 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P02400002792
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400002792 the number on everything you give me?”
Asked SeenDate: Note:
The filing lists 13 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.