From the builder's website. Pictures may be artist's impressions.
Status, as filed
Not present in the filingwork declared by the builder
Filed update 09/01/2024 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
Worked out by PropMap.ai's rules from the dates and figures filed, read 14/11/2026.
Construction. All 5 facilities this layout's filing lists show 0% done, figures that may never have been entered, in a record last updated 09/01/2024. The completion date filed is 01/12/2026, 2 days away. PropMap.ai cannot tell whether work has not started or the figures were left blank. Ask for: the latest dated progress certificate.
Pictures and plans
4 held
All 4 pictures and plans
Pictures and plans 4
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02000007595Filed with TG-RERA
Registered on
19/01/2024Filed with TG-RERA
Valid until
01/08/2026Filed with TG-RERA
Extensions
At least 1, the latest valid until 01/12/2026Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
read 14/11/2026 · figures as declared by the builder, not checked on site
Worked out by PropMap.ai from the declared work, the dates and the last-updated date on this page. It does not say the work is delayed.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Progress
Declared progress
Not present in the filing
Last updated on TG-RERA
09/01/2024Filed with TG-RERA
Actual completion
Not present in the filing
Occupancy certificate
Not present in the filing
Task-by-task progress, dated certificates and changes between reads
Declared progress
Not found on TG-RERA. Ask the builder for the latest quarterly progress report filed with TG-RERA (Forms 1, 2 and 3).
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Pocharam (Infosys campus area)≈ 73 min at peak26 min without traffic
Uppal≈ 86 min at peak32 min without traffic
Shamirpet (Genome Valley area)≈ 88 min at peak38 min without traffic
All 42 places
LB Nagar≈ 100 min at peak38 min without traffic
Adibatla (Aerospace SEZ area)≈ 104 min at peak
Documents
Documents uploaded
39 of 47 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
4
Projects PropMap.ai lists, filed on TG-RERA under this name
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA, and booking figures may lag.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Sewerage (Chamber, Lines, Septic Tank , STP)Not provided
Storm Water DrainsNot provided
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
46 min without traffic
Dilsukhnagar≈ 106 min at peak40 min without traffic
Kompally≈ 106 min at peak48 min without traffic
Kacheguda station≈ 107 min at peak41 min without traffic
Koti≈ 108 min at peak42 min without traffic
Secunderabad Junction≈ 111 min at peak41 min without traffic
Abids≈ 113 min at peak44 min without traffic
Jeedimetla≈ 113 min at peak50 min without traffic
Nampally station (Hyderabad Deccan)≈ 113 min at peak44 min without traffic
Lakdikapul≈ 115 min at peak45 min without traffic
Panjagutta≈ 122 min at peak48 min without traffic
Shamshabad≈ 123 min at peak61 min without traffic
Mehdipatnam≈ 124 min at peak48 min without traffic
Ameerpet≈ 127 min at peak48 min without traffic
Patancheru≈ 128 min at peak64 min without traffic
Begumpet≈ 128 min at peak46 min without traffic
Rajiv Gandhi International Airport≈ 128 min at peak58 min without traffic
Banjara Hills≈ 128 min at peak49 min without traffic
Miyapur≈ 135 min at peak60 min without traffic
Tellapur≈ 135 min at peak68 min without traffic
Moosapet≈ 136 min at peak52 min without traffic
Kukatpally≈ 136 min at peak55 min without traffic
Balanagar≈ 137 min at peak52 min without traffic
Kollur≈ 138 min at peak69 min without traffic
Narsingi≈ 138 min at peak60 min without traffic
Kokapet≈ 139 min at peak62 min without traffic
Raidurg (Mindspace)≈ 142 min at peak57 min without traffic
Khajaguda≈ 142 min at peak58 min without traffic
Gachibowli≈ 142 min at peak59 min without traffic
DLF Cyber City, Gachibowli≈ 142 min at peak59 min without traffic
Financial District≈ 142 min at peak61 min without traffic
Jubilee Hills≈ 142 min at peak54 min without traffic
Lingampally≈ 144 min at peak65 min without traffic
Kondapur≈ 145 min at peak60 min without traffic
Nanakramguda (Waverock)≈ 146 min at peak64 min without traffic
HITEC City≈ 146 min at peak58 min without traffic
Manikonda≈ 147 min at peak57 min without traffic
Madhapur≈ 149 min at peak56 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02000007595 · by Pragna Properties · BHONGIRI, Bhongir, 508116
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
ConstructionThe record shows 0% for every facility near the declared completion date
Ask for: the latest dated certificate of work done, signed by the project's architect or engineer. The record may be out of date: PropMap.ai cannot tell.Question: “How much of the work is done today, who certified it, and on what date?” See the two figures and the record's date
Asked SeenDate: Note:
On recordRegistration is current until 01/12/2026
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 01/12/2026, when the registration ends?” See the registration dates
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
10 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P02000007595
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02000007595 the number on everything you give me?”
Asked SeenDate: Note:
The filing lists 6 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving StationNot provided
Aggregate area of recreational Open SpaceNot stated
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.