Filed update 02/11/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Pictures and plans
13 held
All 13 pictures and plans
Pictures and plans 13
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02400009860Filed with TG-RERA
Registered on
24/02/2025Filed with TG-RERA
Valid until
24/06/2030, extended (first certificate to 24/02/2030)Filed with TG-RERA
Extensions
At least 1, the latest valid until 24/06/2030Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
GHR Trivana
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Almasguda, Thukkuguda Municipality, Almasguda, Mankal, Maheshwaram, 500058Filed with TG-RERA
Mandal, district
Maheshwaram, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Shamshabad≈ 26 min at peak15 min without traffic
Rajiv Gandhi International Airport≈ 28 min at peak10 min without traffic
Adibatla (Aerospace SEZ area)≈ 29 min at peak13 min without traffic
All 42 places
Narsingi≈ 42 min at peak25 min without traffic
Kokapet
Documents
Documents uploaded
21 of 29 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
13
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 53 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 116.8%
Building table 216.7%
Building table 316.8%
Building table 416.8%
Building table 516.8%
Building table 616.8%
Building table 716.8%
Building table 816.8%
Building table 916.8%
Building table 1016.8%
Building table 1116.8%
Building table 1216.8%
Building table 1316.8%
Building table 1416.8%
Building table 1516.8%
Building table 1616.8%
Building table 1716.8%
Building table 1816.8%
Building table 1916.8%
Building table 2016.8%
Building table 2116.8%
Building table 2216.8%
Building table 2316.8%
Building table 2416.8%
Building table 2516.7%
Building table 2616.8%
Building table 2716.8%
Building table 2816.8%
Building table 2916.8%
Building table 3016.8%
Building table 3116.8%
Building table 3216.8%
Building table 3316.8%
Building table 3416.8%
Building table 3516.8%
Building table 3616.8%
Building table 3716.8%
Building table 3816.8%
Building table 3916.8%
Building table 4016.8%
Building table 4116.8%
Building table 4216.8%
Building table 4316.8%
Building table 4416.8%
Building table 4516.8%
Building table 4616.8%
Building table 4716.8%
Building table 4816.8%
Building table 4916.8%
Building table 5016.8%
Building table 5116.8%
Building table 5216.8%
Building table 535.8%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 53 building tables, no project figure filed.
No change between PropMap.ai's reads of 12/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (16.6%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 35 other projects in Maheshwaram mandal with a booked count, 11 declare a larger share booked, 24 a smaller one and 0 the same, as last filed (records last updated 08/06/2021 to 13/11/2026).
57 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Home types and sizes
4 BHK
5 BHK
Builder's site says · ghrinfra.in ↗ · read 13/11/2026
Raidurg (Mindspace)≈ 45 min at peak28 min without traffic
Khajaguda≈ 45 min at peak27 min without traffic
DLF Cyber City, Gachibowli≈ 45 min at peak28 min without traffic
Gachibowli≈ 45 min at peak28 min without traffic
Financial District≈ 45 min at peak26 min without traffic
Kondapur≈ 48 min at peak29 min without traffic
Nanakramguda (Waverock)≈ 49 min at peak30 min without traffic
HITEC City≈ 50 min at peak30 min without traffic
Manikonda≈ 52 min at peak29 min without traffic
Mehdipatnam≈ 52 min at peak28 min without traffic
LB Nagar≈ 53 min at peak25 min without traffic
Koti≈ 53 min at peak25 min without traffic
Nampally station (Hyderabad Deccan)≈ 53 min at peak25 min without traffic
Lakdikapul≈ 55 min at peak26 min without traffic
Abids≈ 55 min at peak26 min without traffic
Kacheguda station≈ 56 min at peak25 min without traffic
Madhapur≈ 56 min at peak32 min without traffic
Tellapur≈ 57 min at peak35 min without traffic
Dilsukhnagar≈ 58 min at peak24 min without traffic
Pocharam (Infosys campus area)≈ 59 min at peak36 min without traffic
Kollur≈ 59 min at peak36 min without traffic
Panjagutta≈ 61 min at peak29 min without traffic
Jubilee Hills≈ 62 min at peak34 min without traffic
Banjara Hills≈ 62 min at peak30 min without traffic
Miyapur≈ 64 min at peak35 min without traffic
Ameerpet≈ 66 min at peak31 min without traffic
Patancheru≈ 66 min at peak42 min without traffic
Uppal≈ 66 min at peak31 min without traffic
Lingampally≈ 67 min at peak36 min without traffic
Kukatpally≈ 69 min at peak37 min without traffic
Secunderabad Junction≈ 70 min at peak31 min without traffic
Begumpet≈ 70 min at peak32 min without traffic
Shamirpet (Genome Valley area)≈ 72 min at peak46 min without traffic
Balanagar≈ 74 min at peak36 min without traffic
Moosapet≈ 75 min at peak35 min without traffic
Jeedimetla≈ 85 min at peak40 min without traffic
Kompally≈ 90 min at peak43 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
10 items, none marked yet.
Ask the builder for
On recordRegistration is current until 24/06/2030
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 24/06/2030, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 010166/LO/HMDA/2653/SMD/2024 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 10 of 57 homes booked (record last updated 02/11/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
9 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02400009860
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400009860 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 53 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 12 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
VILLA 143 slabs filed
VILLA 153 slabs filed
VILLA 163 slabs filed
VILLA 173 slabs filed
VILLA 183 slabs filed
VILLA 193 slabs filed
VILLA 203 slabs filed
VILLA 213 slabs filed
VILLA 223 slabs filed
VILLA 233 slabs filed
VILLA 243 slabs filed
VILLA 253 slabs filed
VILLA 263 slabs filed
VILLA 273 slabs filed
VILLA 283 slabs filed
VILLA 293 slabs filed
VILLA 303 slabs filed
VILLA 313 slabs filed
VILLA 323 slabs filed
VILLA 333 slabs filed
VILLA 343 slabs filed
VILLA 353 slabs filed
VILLA 363 slabs filed
VILLA 373 slabs filed
VILLA 383 slabs filed
VILLA 393 slabs filed
VILLA 403 slabs filed
VILLA 413 slabs filed
VILLA 423 slabs filed
VILLA 433 slabs filed
VILLA 443 slabs filed
VILLA 453 slabs filed
VILLA 463 slabs filed
VILLA 473 slabs filed
VILLA 483 slabs filed
VILLA 493 slabs filed
VILLA 503 slabs filed
VILLA 513 slabs filed
VILLA 523 slabs filed
VILLA 533 slabs filed
AMENTIES5 slabs filed · 1 basement
The site: land, built-up area, survey number
Land
5.94 acres
Net of road and water setbacks
5.61 acres
Approved built-up area
2,25,183 sq ft
Buildings on the approved plan
53
Towers with homes
53
Lost to road widening or a lake's full tank level
14,600 sq ft
Survey number
1/A2
Site boundaries
east
EXISTING ROAD
west
NEIGHBOURS LAND IN SY No 35
north
EXISTING ROAD TO MANKHAL VILLAGE
south
REMAINING LAND OF LAND OWNER AND NEIGHBOURS LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths7% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Declared by the builder, not inspected.
Amenities (7)
clubhouse
gym
landscaped garden
supermarket
swimming pool
tennis court
yoga
Builder's site says · ghrinfra.in ↗ · read 13/11/2026
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.