Not present in the filingwork declared by the builder
Filed update 16/09/2025 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
Worked out by PropMap.ai's rules from the dates and figures filed, read 14/11/2026.
Construction. All 7 facilities this layout's filing lists show 0% done, figures that may never have been entered, in a record last updated 16/09/2025. The completion date filed is 26/09/2027, 301 days away. PropMap.ai cannot tell whether work has not started or the figures were left blank. Ask for: the latest dated progress certificate.
Registration status
Registration number
P02100010048Filed with TG-RERA
Registered on
26/05/2025Filed with TG-RERA
Valid until
26/09/2027, extended (first certificate to 26/05/2027)Filed with TG-RERA
Extensions
At least 1, the latest valid until 26/09/2027Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
read 14/11/2026 · figures as declared by the builder, not checked on site
Worked out by PropMap.ai from the declared work, the dates and the last-updated date on this page. It does not say the work is delayed.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Progress
Declared progress
Not present in the filing
Last updated on TG-RERA
16/09/2025Filed with TG-RERA
Actual completion
Not present in the filing
Occupancy certificate
Not present in the filing
Task-by-task progress, dated certificates and changes between reads
Declared progress
Not found on TG-RERA. Ask the builder for the latest quarterly progress report filed with TG-RERA (Forms 1, 2 and 3).
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work.
EKAMAMIDI, Ekmamidi, Nawabpet, 501102Filed with TG-RERA
Mandal, district
Nawabpet, VikarabadFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: the OpenStreetMap place of the filed village or locality, in the filed mandal, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and some were over 5 km off.
Kollur≈ 153 min at peak52 min without traffic
Tellapur≈ 154 min at peak53 min without traffic
Patancheru≈ 164 min at peak56 min without traffic
All 42 places
Financial District≈ 173 min at peak61 min without traffic
Kokapet
Documents
Documents uploaded
37 of 44 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
0
Projects PropMap.ai lists, filed on TG-RERA under this name
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA, and booking figures may lag.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
SY NOS 281/P,287,288,290/P,291/P,292/P,293/P AND 303/P
Site boundaries
east
OTHERS LAND
west
OTHERS LAND
north
ROAD AND BUFFER
south
OTHERS LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water DrainsNot provided
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water HarvestingNot provided
≈ 174 min at peak
59 min without traffic
Raidurg (Mindspace)≈ 174 min at peak64 min without traffic
Gachibowli≈ 174 min at peak63 min without traffic
Khajaguda≈ 174 min at peak63 min without traffic
DLF Cyber City, Gachibowli≈ 174 min at peak64 min without traffic
Nanakramguda (Waverock)≈ 175 min at peak63 min without traffic
Kondapur≈ 177 min at peak65 min without traffic
HITEC City≈ 179 min at peak66 min without traffic
Narsingi≈ 179 min at peak60 min without traffic
Lingampally≈ 183 min at peak63 min without traffic
Manikonda≈ 185 min at peak64 min without traffic
Madhapur≈ 186 min at peak68 min without traffic
Shamshabad≈ 188 min at peak66 min without traffic
Miyapur≈ 189 min at peak67 min without traffic
Jubilee Hills≈ 191 min at peak70 min without traffic
Mehdipatnam≈ 192 min at peak66 min without traffic
Kukatpally≈ 198 min at peak72 min without traffic
Lakdikapul≈ 200 min at peak70 min without traffic
Banjara Hills≈ 203 min at peak72 min without traffic
Balanagar≈ 203 min at peak75 min without traffic
Moosapet≈ 204 min at peak75 min without traffic
Panjagutta≈ 205 min at peak72 min without traffic
Rajiv Gandhi International Airport≈ 206 min at peak72 min without traffic
Shamirpet (Genome Valley area)≈ 206 min at peak84 min without traffic
Kompally≈ 206 min at peak81 min without traffic
Nampally station (Hyderabad Deccan)≈ 206 min at peak72 min without traffic
Abids≈ 208 min at peak73 min without traffic
Ameerpet≈ 209 min at peak73 min without traffic
Koti≈ 211 min at peak74 min without traffic
Jeedimetla≈ 213 min at peak83 min without traffic
Begumpet≈ 213 min at peak75 min without traffic
Kacheguda station≈ 216 min at peak75 min without traffic
Secunderabad Junction≈ 217 min at peak77 min without traffic
Adibatla (Aerospace SEZ area)≈ 221 min at peak84 min without traffic
Dilsukhnagar≈ 223 min at peak77 min without traffic
LB Nagar≈ 230 min at peak82 min without traffic
Uppal≈ 232 min at peak82 min without traffic
Pocharam (Infosys campus area)≈ 234 min at peak94 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02100010048 · by Happy Minds Infra LLP · EKAMAMIDI, Ekmamidi, Nawabpet, 501102
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
ConstructionThe record shows 0% for every facility near the declared completion date
Ask for: the latest dated certificate of work done, signed by the project's architect or engineer. The record may be out of date: PropMap.ai cannot tell.Question: “How much of the work is done today, who certified it, and on what date?” See the two figures and the record's date
Asked SeenDate: Note:
On recordRegistration is current until 26/09/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 26/09/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
20 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P02100010048
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02100010048 the number on everything you give me?”
Asked SeenDate: Note:
The filing lists 7 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Energy management
Not provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open Space0% declared
Approximate position: the OpenStreetMap place of the filed village or locality, in the filed mandal, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and some were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.