Left blank in the filingwork declared by the builder, 2 building tables
Building table 116.4%
Building table 20%
Filed update 28/10/2026 · read 20/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 20/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 20/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Registration status
Registration number
P02400010277Filed with TG-RERA
Registered on
24/09/2025Filed with TG-RERA
Valid until
24/09/2030Filed with TG-RERA
Extensions
At least 1, the latest valid until 24/01/2031Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 20/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
BANDLAGUDA JAGIR, Bandlaguda, Gandipet, 500075Filed with TG-RERA
Mandal, district
Gandipet, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Mehdipatnam≈ 24 min at peak11 min without traffic
Narsingi≈ 28 min at peak13 min without traffic
Kokapet≈ 29 min at peak14 min without traffic
All 42 places
Raidurg (Mindspace)≈ 31 min at peak16 min without traffic
Khajaguda
Documents
Documents uploaded
35 of 39 document slotsFiled with TG-RERA
Document groups on the record
4 (11 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 2 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 20/11/2026.
Building table 116.4%
Building table 20%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 2 building tables, no project figure filed.
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 352 other projects in Gandipet mandal with a booked count, 122 declare a larger share booked, 230 a smaller one and 0 the same, as last filed (records last updated 12/12/2018 to 23/11/2026).
Home types
Type
Homes
Not booked
Saleable size
3 BHK
343
297
2,465 to 2,580 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing. Sizes the filing does not make clear are left out. 1 other unit is filed without a bedroom type, such as clubhouses or shops.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (2)
booked not booked, as declared.
SDG PRINIA TOWER A AND B45 floors with homes · 54 slabs filed · 2 basements · 343 homes, 46 booked
520 of 8
510 of 8
501 of 8
490 of 8
480 of 8
47
≈ 31 min at peak
16 min without traffic
Gachibowli≈ 31 min at peak16 min without traffic
DLF Cyber City, Gachibowli≈ 31 min at peak16 min without traffic
Financial District≈ 32 min at peak14 min without traffic
Lakdikapul≈ 33 min at peak15 min without traffic
Shamshabad≈ 34 min at peak17 min without traffic
Kondapur≈ 34 min at peak17 min without traffic
Nanakramguda (Waverock)≈ 35 min at peak18 min without traffic
HITEC City≈ 36 min at peak18 min without traffic
Panjagutta≈ 38 min at peak17 min without traffic
Manikonda≈ 38 min at peak16 min without traffic
Banjara Hills≈ 39 min at peak17 min without traffic
Nampally station (Hyderabad Deccan)≈ 39 min at peak17 min without traffic
Abids≈ 41 min at peak18 min without traffic
Ameerpet≈ 42 min at peak18 min without traffic
Madhapur≈ 43 min at peak20 min without traffic
Tellapur≈ 43 min at peak23 min without traffic
Koti≈ 44 min at peak19 min without traffic
Kollur≈ 46 min at peak24 min without traffic
Jubilee Hills≈ 46 min at peak18 min without traffic
Begumpet≈ 47 min at peak20 min without traffic
Kacheguda station≈ 49 min at peak20 min without traffic
Secunderabad Junction≈ 50 min at peak22 min without traffic
Miyapur≈ 50 min at peak23 min without traffic
Moosapet≈ 51 min at peak23 min without traffic
Rajiv Gandhi International Airport≈ 52 min at peak23 min without traffic
Patancheru≈ 52 min at peak30 min without traffic
Balanagar≈ 52 min at peak24 min without traffic
Lingampally≈ 53 min at peak24 min without traffic
Kukatpally≈ 55 min at peak25 min without traffic
Dilsukhnagar≈ 56 min at peak22 min without traffic
LB Nagar≈ 60 min at peak27 min without traffic
Jeedimetla≈ 64 min at peak29 min without traffic
Uppal≈ 65 min at peak27 min without traffic
Adibatla (Aerospace SEZ area)≈ 67 min at peak36 min without traffic
Kompally≈ 73 min at peak33 min without traffic
Pocharam (Infosys campus area)≈ 91 min at peak40 min without traffic
Shamirpet (Genome Valley area)≈ 92 min at peak43 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 20/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 24/01/2031
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 24/01/2031, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 011224/BP/HMDA/2953/SKP/2024 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 47 of 344 homes booked (record last updated 28/10/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (2,465 to 2,580 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
11 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02400010277
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400010277 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 1 building, the tallest with 45 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 13 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
0 of 8
460 of 8
450 of 8
440 of 6
430 of 8
420 of 8
410 of 8
400 of 8
390 of 8
380 of 8
371 of 8
360 of 8
350 of 6
341 of 6
334 of 8
322 of 8
310 of 8
302 of 8
296 of 8
284 of 8
273 of 8
262 of 6
251 of 8
240 of 8
231 of 8
222 of 9
212 of 7
201 of 7
193 of 8
184 of 8
174 of 6
161 of 8
151 of 8
140 of 8
130 of 8
120 of 8
110 of 8
100 of 6
90 of 6
80 of 6
SDG PRINIA
The site: land, built-up area, survey number
Land
2.34 acres
Approved built-up area
12,59,226 sq ft
Buildings on the approved plan
2
Towers with homes
1
Highest floor with homes
45 floors
Lost to road widening or a lake's full tank level
None filed
Survey number
18/A
Site boundaries
east
AGRI LAND IN SY NO 18P
west
KISMATPUR AND BANDLAGUDA JAGIR ROAD
north
AGRI LAND
south
AGRI LAND (name withheld) AS (name withheld)
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)51% declared
Storm Water Drains100% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station15% declared
Aggregate area of recreational Open SpaceNot provided
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.