Left blank in the filingwork declared by the builder, 6 building tables
Building table 180%
Building table 250%
Building table 350%
Building table 4100%
Building table 590%
Building table 60%
Filed update 15/07/2026 · read 24/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 24/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 24/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Registration status
Registration number
P02400003846Filed with TG-RERA
Registered on
03/01/2022Filed with TG-RERA
Valid until
02/12/2027Filed with TG-RERA
Extensions
At least 1, the latest valid until 02/04/2028Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 24/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Forest Edge
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
KUSUMANAGAR, SAHEB NAGAR, Hayathnagar, 500070Filed with TG-RERA
Mandal, district
Hayathnagar, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
LB Nagar≈ 14 min at peak6 min without traffic
Dilsukhnagar≈ 19 min at peak8 min without traffic
Uppal≈ 28 min at peak12 min without traffic
All 42 places
Koti≈ 32 min at peak14 min without traffic
Kacheguda station
Documents
Documents uploaded
38 of 46 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 6 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 24/11/2026.
Building table 180%
Building table 250%
Building table 350%
Building table 4100%
Building table 590%
Building table 60%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 6 building tables, no project figure filed.
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
2, 3, 4 BHK · 1,248 to 3,084 sq ftFiled with TG-RERA
Types, sizes, bookings and the cost calculator
0 of 410 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 32 other projects in Hayathnagar mandal with a booked count, 9 declare a larger share booked, 0 a smaller one and 23 the same, as last filed (records last updated 29/01/2019 to 13/11/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
89
89
1,248 to 1,301 sq ft
3 BHK
276
276
1,402 to 2,364 sq ft
4 BHK
40
40
2,940 to 3,084 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing. 5 other units are filed without a bedroom type, such as clubhouses or shops.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (6)
booked not booked, as declared.
BLOCK-110 floors with homes · 12 slabs filed · 1 basement · 78 homes, 0 booked
100 of 8
90 of 8
80 of 8
70 of 8
60 of 8
50 of 8
≈ 34 min at peak
14 min without traffic
Abids≈ 37 min at peak16 min without traffic
Nampally station (Hyderabad Deccan)≈ 38 min at peak16 min without traffic
Lakdikapul≈ 39 min at peak17 min without traffic
Panjagutta≈ 46 min at peak21 min without traffic
Mehdipatnam≈ 48 min at peak20 min without traffic
Secunderabad Junction≈ 49 min at peak19 min without traffic
Ameerpet≈ 51 min at peak22 min without traffic
Banjara Hills≈ 52 min at peak22 min without traffic
Adibatla (Aerospace SEZ area)≈ 54 min at peak19 min without traffic
Pocharam (Infosys campus area)≈ 54 min at peak24 min without traffic
Begumpet≈ 55 min at peak24 min without traffic
Moosapet≈ 60 min at peak27 min without traffic
Balanagar≈ 61 min at peak27 min without traffic
Shamshabad≈ 62 min at peak27 min without traffic
Jubilee Hills≈ 66 min at peak27 min without traffic
Kukatpally≈ 67 min at peak30 min without traffic
Rajiv Gandhi International Airport≈ 67 min at peak28 min without traffic
Jeedimetla≈ 69 min at peak29 min without traffic
Manikonda≈ 71 min at peak29 min without traffic
Shamirpet (Genome Valley area)≈ 72 min at peak40 min without traffic
Madhapur≈ 74 min at peak28 min without traffic
Raidurg (Mindspace)≈ 74 min at peak29 min without traffic
Khajaguda≈ 77 min at peak30 min without traffic
Kompally≈ 78 min at peak33 min without traffic
Miyapur≈ 78 min at peak35 min without traffic
HITEC City≈ 78 min at peak31 min without traffic
Gachibowli≈ 79 min at peak31 min without traffic
Narsingi≈ 80 min at peak30 min without traffic
DLF Cyber City, Gachibowli≈ 80 min at peak31 min without traffic
Kokapet≈ 82 min at peak32 min without traffic
Financial District≈ 83 min at peak32 min without traffic
Kondapur≈ 83 min at peak32 min without traffic
Nanakramguda (Waverock)≈ 88 min at peak36 min without traffic
Lingampally≈ 91 min at peak38 min without traffic
Tellapur≈ 96 min at peak43 min without traffic
Kollur≈ 98 min at peak44 min without traffic
Patancheru≈ 100 min at peak45 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 24/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
10 items, none marked yet.
Ask the builder for
On recordRegistration is current until 02/04/2028
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 02/04/2028, when the registration ends?” See the registration dates
Asked SeenDate: Note:
An approval paper is filed on TG-RERA; its number is not stated
Ask for: the approval number, and the approved plan that carries it.Question: “What is the approval number, and does the plan show my tower and my floor?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 0 of 410 homes booked (record last updated 15/07/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,248 to 3,084 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
12 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P02400003846
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400003846 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 5 buildings, the tallest with 10 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
40 of 8
30 of 8
20 of 8
10 of 6
BLOCK-210 floors with homes · 12 slabs filed · 1 basement · 80 homes, 0 booked
100 of 8
90 of 8
80 of 8
70 of 8
60 of 8
50 of 8
40 of 8
30 of 8
20 of 8
10 of 8
BOLCK-310 floors with homes · 12 slabs filed · 1 basement · 89 homes, 0 booked
100 of 9
90 of 9
80 of 9
70 of 9
60 of 9
50 of 9
40 of 9
30 of 9
20 of 9
10 of 8
BLOCK-410 floors with homes · 12 slabs filed · 1 basement · 79 homes, 0 booked
100 of 8
90 of 8
80 of 8
70 of 8
60 of 8
50 of 8
40 of 8
30 of 8
20 of 8
10 of 7
BLOCK-510 floors with homes · 12 slabs filed · 1 basement · 79 homes, 0 booked
100 of 8
90 of 8
80 of 8
70 of 8
60 of 8
50 of 8
40 of 8
30 of 8
20 of 8
10 of 7
AMENITIES BUILDING6 slabs filed · 1 basement
The site: land, built-up area, survey number
Land
4.78 acres
Net of road and water setbacks
4.65 acres
Approved built-up area
10,89,356 sq ft
Buildings on the approved plan
6
Towers with homes
5
Highest floor with homes
10 floors
Lost to road widening or a lake's full tank level
5,363 sq ft
Survey number
151
Site boundaries
east
NEIGHBOURS LAND
west
80 FT ROAD
north
(name withheld) LAND BELONGS TO (name withheld)
south
FOREST LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & FootpathsNot provided
Water SupplyNot provided
Sewerage (Chamber, Lines, Septic Tank , STP)Not provided
Storm Water DrainsNot provided
Green Strip/TOT LOT/ParkNot provided
Street LightingNot provided
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water HarvestingNot provided
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving StationNot provided
Aggregate area of recreational Open SpaceNot provided
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.