Not present in the filingwork declared by the builder
Filed update 28/05/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Registration status
Registration number
P01100010323Filed with TG-RERA
Registered on
16/09/2025Filed with TG-RERA
Valid until
16/01/2028, extended (first certificate to 16/09/2027)Filed with TG-RERA
Extensions
At least 1, the latest valid until 16/01/2028Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Infiniti Counti
It cannot know
price, availability, title, court cases or the site today.
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA, and booking figures may lag.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/ParkNot provided
Street Lighting0% declared
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
≈ 119 min at peak
48 min without traffic
Kokapet≈ 119 min at peak49 min without traffic
Raidurg (Mindspace)≈ 120 min at peak51 min without traffic
Gachibowli≈ 120 min at peak48 min without traffic
DLF Cyber City, Gachibowli≈ 120 min at peak48 min without traffic
Khajaguda≈ 120 min at peak50 min without traffic
Nanakramguda (Waverock)≈ 121 min at peak50 min without traffic
Kondapur≈ 123 min at peak48 min without traffic
HITEC City≈ 124 min at peak50 min without traffic
Narsingi≈ 125 min at peak50 min without traffic
Kukatpally≈ 129 min at peak49 min without traffic
Manikonda≈ 130 min at peak54 min without traffic
Madhapur≈ 131 min at peak52 min without traffic
Balanagar≈ 134 min at peak51 min without traffic
Shamirpet (Genome Valley area)≈ 135 min at peak60 min without traffic
Kompally≈ 135 min at peak57 min without traffic
Shamshabad≈ 135 min at peak60 min without traffic
Moosapet≈ 136 min at peak52 min without traffic
Jubilee Hills≈ 137 min at peak54 min without traffic
Mehdipatnam≈ 139 min at peak58 min without traffic
Jeedimetla≈ 142 min at peak59 min without traffic
Ameerpet≈ 148 min at peak58 min without traffic
Panjagutta≈ 148 min at peak58 min without traffic
Banjara Hills≈ 148 min at peak58 min without traffic
Lakdikapul≈ 148 min at peak61 min without traffic
Rajiv Gandhi International Airport≈ 153 min at peak66 min without traffic
Nampally station (Hyderabad Deccan)≈ 154 min at peak64 min without traffic
Begumpet≈ 156 min at peak60 min without traffic
Abids≈ 156 min at peak64 min without traffic
Koti≈ 158 min at peak65 min without traffic
Pocharam (Infosys campus area)≈ 163 min at peak78 min without traffic
Kacheguda station≈ 164 min at peak66 min without traffic
Secunderabad Junction≈ 164 min at peak63 min without traffic
Adibatla (Aerospace SEZ area)≈ 168 min at peak78 min without traffic
Dilsukhnagar≈ 170 min at peak70 min without traffic
Uppal≈ 176 min at peak70 min without traffic
LB Nagar≈ 177 min at peak74 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P01100010323 · by Shri Lakshmi Ganapathy Industries Private Limited · AROOR, MUMBAI HIGH WAY FACING, AROOR, SADASIVPET, 502291
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
On recordRegistration is current until 16/01/2028
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 16/01/2028, when the registration ends?” See the registration dates
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
7 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P01100010323
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P01100010323 the number on everything you give me?”
Asked SeenDate: Note:
The filing lists 8 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
On recordA registered address is on record
Look at: that the site you are shown is at the registered address, and what stands on each side of it.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the registered address
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Fire Protection And Fire Safety Requirements
Not provided
Electrical Meter Room, Sub-Station, Receiving StationNot provided
Aggregate area of recreational Open Space0% declared
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Exact location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.