Filed update 22/05/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Plans
7 held
All 7 plans
Pictures and plans 5
From the builder's website. Pictures may be artist's impressions.
Plans filed with TG-RERA 2
Filed with TG-RERA by the builder, as uploaded. People's names are covered. Not checked by PropMap.ai.
Registration status
Registration number
P02400010903Filed with TG-RERA
Registered on
03/01/2026Filed with TG-RERA
Valid until
02/05/2031, extended (first certificate to 02/01/2031)Filed with TG-RERA
Extensions
At least 1, the latest valid until 02/05/2031Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Trendset Legacy
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Exact: the TG-RERA portal's map pinFiled with TG-RERA
Drive times, places nearby and other projects within 5 km
Drive times
Shamshabad≈ 15 min at peak5 min without traffic
Rajiv Gandhi International Airport≈ 15 min at peak6 min without traffic
Narsingi≈ 46 min at peak22 min without traffic
All 42 places
Kokapet≈ 47 min at peak22 min without traffic
Mehdipatnam≈ 48 min at peak20 min without traffic
Raidurg (Mindspace)
Documents
Documents uploaded
29 of 33 document slotsFiled with TG-RERA
Document groups on the record
4 (11 documents)Filed with TG-RERA
Pictures and plans held
7
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 63 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 110%
Building table 210%
Building table 310%
Building table 410%
Building table 510%
Building table 610%
Building table 710%
Building table 810%
Building table 910%
Building table 1010%
Building table 1110%
Building table 1210%
Building table 1310%
Building table 1410%
Building table 1510%
Building table 1610%
Building table 1710%
Building table 1810%
Building table 1910%
Building table 2010%
Building table 2110%
Building table 2210%
Building table 2310%
Building table 2410%
Building table 2510%
Building table 2610%
Building table 2710%
Building table 2810%
Building table 2910%
Building table 3010%
Building table 3110%
Building table 3210%
Building table 3310%
Building table 3410%
Building table 3510%
Building table 3610%
Building table 3710%
Building table 3810%
Building table 3910%
Building table 4010%
Building table 4110%
Building table 4210%
Building table 4310%
Building table 4410%
Building table 4510%
Building table 4610%
Building table 4710%
Building table 4810%
Building table 4910%
Building table 5010%
Building table 5110%
Building table 5210%
Building table 5310%
Building table 5410%
Building table 5510%
Building table 5610%
Building table 5710%
Building table 5810%
Building table 5910%
Building table 6010%
Building table 6110%
Building table 6210%
Building table 6310%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 63 building tables, no project figure filed.
No change between PropMap.ai's reads of 05/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (10%).
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
Declared by the builder to TG-RERA, not checked against those projects.
Homes
Homes, total
63Filed with TG-RERA
Booked, as declared
0Filed with TG-RERA
Home types and sizes
Not present in the filing
Types, sizes, bookings and the cost calculator
0 of 63 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 40 other projects in Balapur mandal with a booked count, 11 declare a larger share booked, 0 a smaller one and 29 the same, as last filed (records last updated 20/06/2019 to 04/11/2026).
63 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (63)
booked not booked, as declared.
Villa No 13 slabs filedVilla No 23 slabs filedVilla No 33 slabs filedVilla No 43 slabs filedVilla No 53 slabs filedVilla N0 63 slabs filedVilla No 73 slabs filedVilla No 83 slabs filedVilla No 93 slabs filedVilla No 103 slabs filedVilla No 113 slabs filedVilla No 123 slabs filedVilla No 133 slabs filedVilla No 143 slabs filedVilla No 153 slabs filedVilla No 163 slabs filed
≈ 49 min at peak
25 min without traffic
Khajaguda≈ 49 min at peak24 min without traffic
Gachibowli≈ 49 min at peak25 min without traffic
DLF Cyber City, Gachibowli≈ 49 min at peak25 min without traffic
Financial District≈ 49 min at peak23 min without traffic
Kondapur≈ 52 min at peak26 min without traffic
Lakdikapul≈ 52 min at peak24 min without traffic
Nanakramguda (Waverock)≈ 53 min at peak27 min without traffic
HITEC City≈ 53 min at peak27 min without traffic
Manikonda≈ 56 min at peak26 min without traffic
Panjagutta≈ 57 min at peak26 min without traffic
Banjara Hills≈ 58 min at peak25 min without traffic
Nampally station (Hyderabad Deccan)≈ 59 min at peak23 min without traffic
LB Nagar≈ 60 min at peak24 min without traffic
Koti≈ 60 min at peak24 min without traffic
Adibatla (Aerospace SEZ area)≈ 60 min at peak25 min without traffic
Abids≈ 60 min at peak24 min without traffic
Madhapur≈ 60 min at peak29 min without traffic
Tellapur≈ 61 min at peak32 min without traffic
Ameerpet≈ 62 min at peak27 min without traffic
Kacheguda station≈ 63 min at peak24 min without traffic
Kollur≈ 63 min at peak33 min without traffic
Dilsukhnagar≈ 64 min at peak24 min without traffic
Jubilee Hills≈ 66 min at peak28 min without traffic
Begumpet≈ 66 min at peak29 min without traffic
Miyapur≈ 68 min at peak32 min without traffic
Secunderabad Junction≈ 69 min at peak30 min without traffic
Patancheru≈ 70 min at peak39 min without traffic
Moosapet≈ 70 min at peak32 min without traffic
Lingampally≈ 70 min at peak33 min without traffic
Balanagar≈ 72 min at peak32 min without traffic
Kukatpally≈ 73 min at peak34 min without traffic
Uppal≈ 73 min at peak31 min without traffic
Jeedimetla≈ 84 min at peak38 min without traffic
Pocharam (Infosys campus area)≈ 90 min at peak43 min without traffic
Kompally≈ 92 min at peak42 min without traffic
Shamirpet (Genome Valley area)≈ 103 min at peak52 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 02/05/2031
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 02/05/2031, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 001881/HMDA/00543/SWDL/SHZ/2025 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
2 mortgage deeds are filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 0 of 63 homes booked (record last updated 22/05/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
12 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02400010903
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400010903 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 62 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 10% of work (record last updated 22/05/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
On recordA registered address is on record
Look at: that the site you are shown is at the registered address, and what stands on each side of it.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the registered address
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Villa No 173 slabs filed
Villa No 183 slabs filed
Villa No 193 slabs filed
Villa No 203 slabs filed
Villa No 213 slabs filed
Villa No 223 slabs filed
Villa No 233 slabs filed
Villa No 243 slabs filed
Villa No 253 slabs filed
Villa No 263 slabs filed
Villa No 273 slabs filed
Villa No 283 slabs filed
Villa No 293 slabs filed
Villa No 303 slabs filed
Villa No 313 slabs filed
Villa N0 323 slabs filed
Villa No 333 slabs filed
Villa No 343 slabs filed
Villa No 353 slabs filed
Villa No 363 slabs filed
Villa No 373 slabs filed
Villa No 383 slabs filed
Villa No 393 slabs filed
Villa No 403 slabs filed
Villa No 413 slabs filed
Villa No 423 slabs filed
Villa No 433 slabs filed
Villa No 443 slabs filed
Villa No 453 slabs filed
Villa No 463 slabs filed
Villa No 473 slabs filed
Villa No 483 slabs filed
Villa No 493 slabs filed
Villa No 503 slabs filed
Villa No 513 slabs filed
Villa No 523 slabs filed
Villa No 533 slabs filed
Villa No 543 slabs filed
Villa No 553 slabs filed
Villa No 563 slabs filed
Villa No 573 slabs filed
Villa No 583 slabs filed
Villa No 593 slabs filed
Villa No 603 slabs filed
Villa No 613 slabs filed
Villa No 623 slabs filed
Amenities3 slabs filed
The site: land, built-up area, survey number
Land
22.32 acres
Net of road and water setbacks
21.79 acres
Approved built-up area
6,68,070 sq ft
Buildings on the approved plan
63
Towers with homes
62
Lost to road widening or a lake's full tank level
23,477 sq ft
Survey number
184 P,185P,186P,245P,246P,247P&248P
Site boundaries
east
Airport Road
west
Survey No 103 of Shamshabad
north
Road from Shamshabad to Mamidipalli Village
south
(name withheld) Airport
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open Space0% declared
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Exact location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.