From the builder's website. Pictures may be artist's impressions.
Status, as filed
Left blank in the filingwork declared by the builder, 3 building tables
Building table 10%
Building table 20%
Building table 30%
Filed update 12/08/2026 · read 20/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 20/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 20/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its , after a compliance review, with the sources searched and their dates.
Pictures and plans
10 held
All 10 pictures and plans
Pictures and plans 10
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02200011123Filed with TG-RERA
Registered on
11/05/2026Filed with TG-RERA
Valid until
11/09/2031, extended (first certificate to 11/05/2031)Filed with TG-RERA
Extensions
At least 1, the latest valid until 11/09/2031Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 20/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Patancheru≈ 25 min at peak14 min without traffic
Miyapur≈ 31 min at peak10 min without traffic
Tellapur≈ 32 min at peak18 min without traffic
All 42 places
Kukatpally≈ 32 min at peak11 min without traffic
Shamirpet (Genome Valley area)≈ 34 min at peak
Documents
Documents uploaded
53 of 57 document slotsFiled with TG-RERA
Document groups on the record
4 (11 documents)Filed with TG-RERA
Pictures and plans held
10
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 3 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 20/11/2026.
Building table 10%
Building table 20%
Building table 30%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 3 building tables, no project figure filed.
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 130 other projects in Bachupally mandal with a booked count, 51 declare a larger share booked, 0 a smaller one and 79 the same, as last filed (records last updated 09/01/2019 to 30/10/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
204
204
1,351 to 1,774 sq ft
3 BHK
546
546
1,351 to 2,115 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing. 8 other units are filed without a bedroom type, such as clubhouses or shops.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (3)
booked not booked, as declared.
TOWER - A34 floors with homes · 38 slabs filed · 406 homes, 0 booked
340 of 12
330 of 12
320 of 12
310 of 12
300 of 12
20 min without traffic
Kompally≈ 34 min at peak17 min without traffic
Kollur≈ 35 min at peak20 min without traffic
Balanagar≈ 37 min at peak13 min without traffic
Moosapet≈ 39 min at peak14 min without traffic
Jeedimetla≈ 40 min at peak19 min without traffic
Lingampally≈ 41 min at peak16 min without traffic
Kondapur≈ 47 min at peak16 min without traffic
Financial District≈ 48 min at peak22 min without traffic
HITEC City≈ 48 min at peak15 min without traffic
Kokapet≈ 48 min at peak25 min without traffic
Raidurg (Mindspace)≈ 48 min at peak17 min without traffic
Gachibowli≈ 48 min at peak19 min without traffic
Khajaguda≈ 48 min at peak21 min without traffic
DLF Cyber City, Gachibowli≈ 48 min at peak18 min without traffic
Nanakramguda (Waverock)≈ 49 min at peak25 min without traffic
Ameerpet≈ 51 min at peak19 min without traffic
Panjagutta≈ 51 min at peak19 min without traffic
Narsingi≈ 53 min at peak24 min without traffic
Madhapur≈ 56 min at peak18 min without traffic
Lakdikapul≈ 58 min at peak22 min without traffic
Manikonda≈ 59 min at peak24 min without traffic
Begumpet≈ 59 min at peak22 min without traffic
Jubilee Hills≈ 60 min at peak20 min without traffic
Banjara Hills≈ 60 min at peak23 min without traffic
Pocharam (Infosys campus area)≈ 62 min at peak39 min without traffic
Shamshabad≈ 64 min at peak35 min without traffic
Nampally station (Hyderabad Deccan)≈ 64 min at peak25 min without traffic
Abids≈ 65 min at peak26 min without traffic
Secunderabad Junction≈ 66 min at peak24 min without traffic
Mehdipatnam≈ 67 min at peak26 min without traffic
Koti≈ 68 min at peak27 min without traffic
Kacheguda station≈ 73 min at peak28 min without traffic
Uppal≈ 75 min at peak32 min without traffic
Dilsukhnagar≈ 80 min at peak32 min without traffic
Rajiv Gandhi International Airport≈ 81 min at peak41 min without traffic
LB Nagar≈ 88 min at peak36 min without traffic
Adibatla (Aerospace SEZ area)≈ 90 min at peak52 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02200011123 · by Aspire Spaces Infra LLP · MALLAMPET, Bachupally, 500090
Built by rule from this project's TG-RERA record, read by PropMap.ai on 20/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
13 items, none marked yet.
Ask the builder for
On recordRegistration is current until 11/09/2031
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 11/09/2031, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 005423/HMDA/01621/SWBP/MDL1/2025 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
The builder declares a court case
Ask for: the case number, the court and what is claimed, for each case, for your lawyer to read.Question: “Which cases are these, and does any of them concern the land or my flat?” See the declaration
Asked SeenDate: Note:
3 mortgage deeds are filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 0 of 758 homes booked (record last updated 12/08/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,351 to 2,115 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
29 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02200011123
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200011123 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 2 buildings, the tallest with 34 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 13 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
29
0 of 12
280 of 12
270 of 12
260 of 12
250 of 12
240 of 12
230 of 12
220 of 12
210 of 12
200 of 12
190 of 12
180 of 12
170 of 12
160 of 12
150 of 12
140 of 12
130 of 10
120 of 12
110 of 12
100 of 12
90 of 12
80 of 12
70 of 12
60 of 12
50 of 12
40 of 12
30 of 12
20 of 12
10 of 12
TOWER - B34 floors with homes · 38 slabs filed · 344 homes, 0 booked
340 of 10
330 of 10
320 of 10
310 of 10
300 of 10
290 of 10
280 of 10
270 of 10
260 of 10
250 of 10
240 of 10
230 of 12
220 of 10
210 of 10
200 of 10
190 of 10
180 of 10
170 of 10
160 of 10
150 of 10
140 of 10
130 of 10
120 of 10
110 of 10
100 of 10
90 of 10
80 of 10
70 of 12
60 of 10
50 of 10
40 of 10
30 of 10
20 of 10
10 of 10
AMENITES8 slabs filed
The site: land, built-up area, survey number
Land
4.08 acres
Net of road and water setbacks
3.77 acres
Approved built-up area
12,77,984 sq ft
Buildings on the approved plan
3
Towers with homes
2
Highest floor with homes
34 floors
Lost to road widening or a lake's full tank level
13,605 sq ft
Survey number
295
Site boundaries
east
100 FEET ROAD
west
OTHERS LAND
north
30 METER WIDE ROAD
south
SUBSTATION AND OTHERS LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.