Left blank in the filingwork declared by the builder, 4 building tables
Building table 1100%
Building table 2100%
Building table 3100%
Building table 4100%
Filed update 14/10/2026 · read 24/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 24/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 24/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Registration status
Registration number
P02400002943Filed with TG-RERA
Registered on
17/05/2021Filed with TG-RERA
Valid until
18/12/2026Filed with TG-RERA
Extensions
At least 1, the latest valid until 18/04/2027Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Vijay and RV s Sai Vanamali
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
BACHUPALLY ROAD, MADEENAGUDA, Madina Guda, Serilingampally, 500049Filed with TG-RERA
Mandal, district
Serilingampally, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Lingampally≈ 14 min at peak6 min without traffic
Miyapur≈ 18 min at peak8 min without traffic
Gachibowli≈ 19 min at peak7 min without traffic
All 42 places
DLF Cyber City, Gachibowli≈ 20 min at peak7 min without traffic
Kondapur
Documents
Documents uploaded
39 of 47 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 4 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 24/11/2026.
Building table 1100%
Building table 2100%
Building table 3100%
Building table 4100%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 4 building tables, no project figure filed.
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
The counts in this filing did not look believable, so PropMap.ai does not show them. Ask the builder for the numbers in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
The site: land, built-up area, survey number
Land
7.92 acres
Net of road and water setbacks
7.73 acres
Approved built-up area
8,83,127 sq ft
Buildings on the approved plan
4
Lost to road widening or a lake's full tank level
7,868 sq ft
Survey number
211
Site boundaries
east
ROAD WIDTH 45
west
OTHERS - TANK BUND
north
OTHERS - NEIGHBOURS (name withheld) -
south
OTHERS - 12M (name withheld) PROPERTY-
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Treatment And Disposal Of Sewage And Sullage Water95% declared
Solid Waste Management And Disposal100% declared
Water Conservation, Rain water Harvesting100% declared
Energy management65% declared
Fire Protection And Fire Safety Requirements100% declared
Electrical Meter Room, Sub-Station, Receiving Station98% declared
Aggregate area of recreational Open SpaceNot provided
Internal Roads & Footpaths100% declared
Water Supply100% declared
Sewerage (Chamber, Lines, Septic Tank , STP)100% declared
Storm Water Drains100% declared
Green Strip/TOT LOT/Park100% declared
Street Lighting100% declared
Community Buildings100% declared
Declared by the builder, not inspected.
≈ 24 min at peak
8 min without traffic
Patancheru≈ 27 min at peak12 min without traffic
HITEC City≈ 28 min at peak10 min without traffic
Kukatpally≈ 28 min at peak13 min without traffic
Raidurg (Mindspace)≈ 29 min at peak10 min without traffic
Khajaguda≈ 31 min at peak12 min without traffic
Financial District≈ 32 min at peak13 min without traffic
Balanagar≈ 33 min at peak15 min without traffic
Nanakramguda (Waverock)≈ 33 min at peak13 min without traffic
Moosapet≈ 35 min at peak16 min without traffic
Madhapur≈ 36 min at peak12 min without traffic
Narsingi≈ 38 min at peak15 min without traffic
Kokapet≈ 40 min at peak16 min without traffic
Manikonda≈ 40 min at peak15 min without traffic
Jubilee Hills≈ 41 min at peak14 min without traffic
Ameerpet≈ 47 min at peak20 min without traffic
Panjagutta≈ 47 min at peak19 min without traffic
Tellapur≈ 50 min at peak19 min without traffic
Mehdipatnam≈ 50 min at peak17 min without traffic
Banjara Hills≈ 53 min at peak18 min without traffic
Kollur≈ 53 min at peak20 min without traffic
Shamshabad≈ 53 min at peak26 min without traffic
Lakdikapul≈ 54 min at peak21 min without traffic
Begumpet≈ 55 min at peak22 min without traffic
Nampally station (Hyderabad Deccan)≈ 60 min at peak23 min without traffic
Abids≈ 61 min at peak24 min without traffic
Jeedimetla≈ 62 min at peak26 min without traffic
Koti≈ 64 min at peak25 min without traffic
Secunderabad Junction≈ 66 min at peak26 min without traffic
Kacheguda station≈ 69 min at peak27 min without traffic
Kompally≈ 71 min at peak29 min without traffic
Rajiv Gandhi International Airport≈ 71 min at peak32 min without traffic
Dilsukhnagar≈ 76 min at peak30 min without traffic
Shamirpet (Genome Valley area)≈ 77 min at peak36 min without traffic
LB Nagar≈ 84 min at peak35 min without traffic
Uppal≈ 85 min at peak34 min without traffic
Adibatla (Aerospace SEZ area)≈ 86 min at peak44 min without traffic
Pocharam (Infosys campus area)≈ 105 min at peak46 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02400002943 · by Vijaybharath Builders and RV Nirmaan LLP · BACHUPALLY ROAD, MADEENAGUDA, Madina Guda, Serilingampally, 500049
Built by rule from this project's TG-RERA record, read by PropMap.ai on 24/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
On recordRegistration is current until 18/04/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 18/04/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 1/C21/12585/2020 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
7 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P02400002943
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400002943 the number on everything you give me?”
Asked SeenDate: Note:
The filing lists 13 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.