Filed update 11/09/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Registration status
Registration number
P02400003624Filed with TG-RERA
Registered on
20/11/2021Filed with TG-RERA
Valid until
07/07/2027Filed with TG-RERA
Extensions
At least 1, the latest valid until 07/11/2027Filed with TG-RERA
Completion date, as first filed
07/11/2027Filed with TG-RERA
Revised completion date, as filed
Not present in the filing
Status, as declared
New ProjectFiled with TG-RERA
Project type
Mixed Development (Residential & Commercial)Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Armonia
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Progress
Declared progress
Left blank in the filing
Last updated on TG-RERA
11/09/2026Filed with TG-RERA
Actual completion
Not present in the filing
Occupancy certificate
Not present in the filing
Location
Registered address
BUDVEL, Budwel, Rajendranagar, 500030Filed with TG-RERA
Mandal, district
Rajendranagar, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Narsingi≈ 23 min at peak11 min without traffic
Kokapet≈ 24 min at peak11 min without traffic
Raidurg (Mindspace)≈ 26 min at peak14 min without traffic
All 42 places
Khajaguda≈ 26 min at peak13 min without traffic
Gachibowli≈ 26 min at peak
Documents
Documents uploaded
15 of 24 document slotsFiled with TG-RERA
Document groups on the record
3 (6 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 94 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 168.5%
Building table 268.5%
Building table 368.5%
Building table 468.5%
Building table 568.5%
Building table 668.5%
Building table 768.5%
Building table 868.5%
Building table 968.5%
Building table 1068.5%
Building table 1178.2%
Building table 1268.5%
Building table 1368.5%
Building table 1468.5%
Building table 1568.5%
Building table 1668.5%
Building table 1768.5%
Building table 1868.5%
Building table 1968.5%
Building table 2068.5%
Building table 2168.5%
Building table 2268.5%
Building table 2365%
Building table 2468.5%
Building table 2568.5%
Building table 2668.5%
Building table 2768.5%
Building table 2868.5%
Building table 2968.5%
Building table 3068.5%
Building table 3168.5%
Building table 3268.5%
Building table 3368.5%
Building table 3468.5%
Building table 3568.5%
Building table 3668.5%
Building table 3768.5%
Building table 3868.5%
Building table 3968.5%
Building table 4068.5%
Building table 4168.5%
Building table 4268.5%
Building table 4365%
Building table 4463%
Building table 4563%
Building table 4663%
Building table 4763%
Building table 4865%
Building table 4965%
Building table 5065%
Building table 5168.5%
Building table 5268.5%
Building table 5368.5%
Building table 5468.5%
Building table 5568.5%
Building table 5668.5%
Building table 5768.5%
Building table 5868.5%
Building table 5968.5%
Building table 6068.5%
Building table 6165%
Building table 6265%
Building table 6365%
Building table 6468.5%
Building table 6568.5%
Building table 6668.5%
Building table 6768.5%
Building table 6868.5%
Building table 6968.5%
Building table 7068.5%
Building table 7168.5%
Building table 7268.5%
Building table 7368.5%
Building table 7468.5%
Building table 7568.5%
Building table 7668.5%
Building table 7768.5%
Building table 7868.5%
Building table 7968.5%
Building table 8068.5%
Building table 8168.5%
Building table 8268.5%
Building table 8368.5%
Building table 8468.5%
Building table 8568.5%
Building table 8663%
Building table 8768.5%
Building table 8868.5%
Building table 8968.5%
Building table 9068.5%
Building table 9168.5%
Building table 9268.5%
Building table 9368.5%
Building table 9468.5%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 94 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (68%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
The counts in this filing did not look believable, so PropMap.ai does not show them. Ask the builder for the numbers in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
The site: land, built-up area, survey number
Land
19.93 acres
Net of road and water setbacks
19.34 acres
Approved built-up area
6,27,228 sq ft
Buildings on the approved plan
94
Lost to road widening or a lake's full tank level
25,587 sq ft
Survey number
310/P , 311/P AND 312/P
Site boundaries
east
LAND IN SURVEY NO 313
west
ROAD AND LAND IN SURVEY NO 310 PART
north
LAND IN SY NO 311 312 322 323 324
south
PART OF LAND IN SY NO 310 311 312 FUTURE EXPANSION
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & FootpathsNot provided
Water Supply97% declared
Sewerage (Chamber, Lines, Septic Tank , STP)97% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park85% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting85% declared
Energy management0% declared
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving Station85% declared
Aggregate area of recreational Open SpaceNot provided
Declared by the builder, not inspected.
14 min without traffic
DLF Cyber City, Gachibowli≈ 26 min at peak14 min without traffic
Financial District≈ 26 min at peak12 min without traffic
Kondapur≈ 29 min at peak15 min without traffic
Nanakramguda (Waverock)≈ 30 min at peak16 min without traffic
Shamshabad≈ 30 min at peak14 min without traffic
HITEC City≈ 30 min at peak16 min without traffic
Mehdipatnam≈ 32 min at peak12 min without traffic
Manikonda≈ 33 min at peak15 min without traffic
Lakdikapul≈ 36 min at peak16 min without traffic
Madhapur≈ 37 min at peak18 min without traffic
Tellapur≈ 38 min at peak21 min without traffic
Kollur≈ 40 min at peak22 min without traffic
Panjagutta≈ 41 min at peak17 min without traffic
Banjara Hills≈ 42 min at peak17 min without traffic
Nampally station (Hyderabad Deccan)≈ 43 min at peak18 min without traffic
Jubilee Hills≈ 43 min at peak20 min without traffic
Abids≈ 44 min at peak19 min without traffic
Miyapur≈ 45 min at peak21 min without traffic
Ameerpet≈ 45 min at peak19 min without traffic
Koti≈ 46 min at peak20 min without traffic
Patancheru≈ 47 min at peak28 min without traffic
Lingampally≈ 48 min at peak22 min without traffic
Rajiv Gandhi International Airport≈ 48 min at peak19 min without traffic
Begumpet≈ 50 min at peak20 min without traffic
Kukatpally≈ 50 min at peak23 min without traffic
Kacheguda station≈ 52 min at peak20 min without traffic
Secunderabad Junction≈ 53 min at peak22 min without traffic
Moosapet≈ 54 min at peak24 min without traffic
Balanagar≈ 55 min at peak24 min without traffic
Dilsukhnagar≈ 57 min at peak23 min without traffic
LB Nagar≈ 58 min at peak25 min without traffic
Adibatla (Aerospace SEZ area)≈ 63 min at peak32 min without traffic
Uppal≈ 66 min at peak27 min without traffic
Jeedimetla≈ 67 min at peak30 min without traffic
Kompally≈ 76 min at peak34 min without traffic
Shamirpet (Genome Valley area)≈ 86 min at peak44 min without traffic
Pocharam (Infosys campus area)≈ 93 min at peak40 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
On recordRegistration is current until 07/11/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 07/11/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
The builder declares a court case
Ask for: the case number, the court and what is claimed, for each case, for your lawyer to read.Question: “Which cases are these, and does any of them concern the land or my flat?” See the declaration
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
2 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P02400003624
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400003624 the number on everything you give me?”
Asked SeenDate: Note:
The filing lists 9 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Not known · no source PropMap.ai holds gives this yet.
Floors with homesNot known
Not known · no source PropMap.ai holds gives this yet.
Home typesNot known
Not known · no source PropMap.ai holds gives this yet.
Home sizes (saleable)Not known
Not known · no source PropMap.ai holds gives this yet.
Map positionApproximate position
Placed at the filed pin of a similarly named project by the same builder · rerait.telangana.gov.in ↗ · read 11/11/2026
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.