From the builder's website. Pictures may be artist's impressions.
Status, as filed
Left blank in the filingwork declared by the builder, 3 building tables
Building table 180.5%
Building table 281.3%
Building table 381.3%
Filed update 15/10/2025 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its , after a compliance review, with the sources searched and their dates.
Pictures and plans
1 held
All 1 pictures and plans
Pictures and plans 1
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02400003677Filed with TG-RERA
Registered on
03/12/2021Filed with TG-RERA
Valid until
30/03/2027, extended (first certificate to 30/11/2026)Filed with TG-RERA
Extensions
At least 1, the latest valid until 30/03/2027Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Financial District≈ 5 min at peak2 min without traffic
Narsingi≈ 11 min at peak4 min without traffic
Kokapet≈ 13 min at peak5 min without traffic
All 42 places
Manikonda≈ 13 min at peak5 min without traffic
Khajaguda≈ 16 min at peak
Documents
Documents uploaded
23 of 29 document slotsFiled with TG-RERA
Document groups on the record
3 (9 documents)Filed with TG-RERA
Pictures and plans held
1
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 3 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 180.5%
Building table 281.3%
Building table 381.3%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 3 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (81%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
Declared by the builder to TG-RERA, not checked against those projects.
Homes
Homes, total
Left blank in the filing
Booked, as declared
Left blank in the filing
Home types and sizes
Not present in the filing
Types, sizes, bookings and the cost calculator
The counts in this filing did not look believable, so PropMap.ai does not show them. Ask the builder for the numbers in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Raidurg (Mindspace)≈ 16 min at peak7 min without traffic
Gachibowli≈ 16 min at peak7 min without traffic
DLF Cyber City, Gachibowli≈ 16 min at peak6 min without traffic
Nanakramguda (Waverock)≈ 18 min at peak7 min without traffic
Kondapur≈ 19 min at peak8 min without traffic
HITEC City≈ 20 min at peak8 min without traffic
Madhapur≈ 27 min at peak11 min without traffic
Jubilee Hills≈ 33 min at peak12 min without traffic
Tellapur≈ 33 min at peak15 min without traffic
Shamshabad≈ 35 min at peak17 min without traffic
Miyapur≈ 35 min at peak13 min without traffic
Kollur≈ 35 min at peak16 min without traffic
Lingampally≈ 38 min at peak14 min without traffic
Mehdipatnam≈ 38 min at peak13 min without traffic
Kukatpally≈ 40 min at peak15 min without traffic
Patancheru≈ 42 min at peak21 min without traffic
Banjara Hills≈ 44 min at peak15 min without traffic
Balanagar≈ 44 min at peak18 min without traffic
Moosapet≈ 46 min at peak18 min without traffic
Panjagutta≈ 46 min at peak16 min without traffic
Lakdikapul≈ 47 min at peak17 min without traffic
Ameerpet≈ 50 min at peak17 min without traffic
Rajiv Gandhi International Airport≈ 53 min at peak23 min without traffic
Nampally station (Hyderabad Deccan)≈ 53 min at peak18 min without traffic
Abids≈ 54 min at peak20 min without traffic
Begumpet≈ 55 min at peak19 min without traffic
Koti≈ 57 min at peak21 min without traffic
Kacheguda station≈ 63 min at peak22 min without traffic
Secunderabad Junction≈ 63 min at peak23 min without traffic
Adibatla (Aerospace SEZ area)≈ 68 min at peak35 min without traffic
Dilsukhnagar≈ 69 min at peak25 min without traffic
Jeedimetla≈ 73 min at peak28 min without traffic
LB Nagar≈ 77 min at peak30 min without traffic
Uppal≈ 78 min at peak30 min without traffic
Shamirpet (Genome Valley area)≈ 81 min at peak42 min without traffic
Kompally≈ 81 min at peak32 min without traffic
Pocharam (Infosys campus area)≈ 98 min at peak42 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
On recordRegistration is current until 30/03/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 30/03/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 043651/ZOA/R1/U6/HMDA/02032021 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
6 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P02400003677
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400003677 the number on everything you give me?”
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not available right now. The map shows the project's position only.