Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Mayfair Apartments
Registration. The registration was valid until 17/07/2024, a date that has passed. TG-RERA listed no extension certificate when PropMap.ai read this project on 14/11/2026. Ask for: the extension order, or the occupancy certificate if the project is finished.
Worked out by PropMap.ai from the dates on this page.
Completion. The completion date the builder first filed, 17/07/2024, has passed, and the project status on TG-RERA still reads "New Project" (read 14/11/2026). Ask for: the occupancy certificate, or the revised completion date.
Worked out by PropMap.ai from the dates on this page.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Progress
Declared progress
Left blank in the filing
Last updated on TG-RERA
26/10/2023Filed with TG-RERA
Actual completion
Not present in the filing
Occupancy certificate
Not present in the filing
Location
Registered address
TELLAPUR, RC PURAM, 503032Filed with TG-RERA
Mandal, district
RC PURAM, SangareddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Tellapur≈ 16 min at peak6 min without traffic
Kollur≈ 19 min at peak8 min without traffic
Lingampally≈ 33 min at peak12 min without traffic
All 42 places
Patancheru≈ 41 min at peak19 min without traffic
Miyapur≈ 45 min at peak
Documents
Documents uploaded
13 of 21 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
1
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 7 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 189.8%
Building table 289.8%
Building table 389.6%
Building table 486.4%
Building table 587.3%
Building table 690%
Building table 789.3%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 7 building tables, no project figure filed.
No change between PropMap.ai's reads of 04/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (88.9%).
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
Declared by the builder to TG-RERA, not checked against those projects.
Homes
Homes, total
776Filed with TG-RERA
Booked, as declared
466Filed with TG-RERA
Home types and sizes
2, 3 BHK · 1,262 to 2,084 sq ftFiled with TG-RERA
Types, sizes, bookings and the cost calculator
466 of 776 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 116 other projects in RC Puram mandal with a booked count, 15 declare a larger share booked, 101 a smaller one and 0 the same, as last filed (records last updated 13/05/2019 to 14/11/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
349
131
1,262 to 1,266 sq ft
3 BHK
427
179
1,262 to 2,084 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (7)
booked not booked, as declared.
A BLOCK10 floors with homes · 12 slabs filed · 2 basements · 119 homes, 40 booked
104 of 12
94 of 12
84 of 12
74 of 11
18 min without traffic
Nanakramguda (Waverock)≈ 46 min at peak18 min without traffic
Financial District≈ 46 min at peak18 min without traffic
Kokapet≈ 47 min at peak18 min without traffic
Gachibowli≈ 47 min at peak17 min without traffic
Raidurg (Mindspace)≈ 47 min at peak20 min without traffic
Khajaguda≈ 47 min at peak18 min without traffic
DLF Cyber City, Gachibowli≈ 48 min at peak17 min without traffic
Kondapur≈ 50 min at peak18 min without traffic
HITEC City≈ 52 min at peak20 min without traffic
Narsingi≈ 52 min at peak20 min without traffic
Kukatpally≈ 56 min at peak23 min without traffic
Manikonda≈ 58 min at peak22 min without traffic
Madhapur≈ 59 min at peak23 min without traffic
Balanagar≈ 61 min at peak25 min without traffic
Moosapet≈ 62 min at peak26 min without traffic
Shamshabad≈ 63 min at peak30 min without traffic
Jubilee Hills≈ 64 min at peak24 min without traffic
Mehdipatnam≈ 67 min at peak26 min without traffic
Ameerpet≈ 74 min at peak30 min without traffic
Panjagutta≈ 75 min at peak29 min without traffic
Banjara Hills≈ 76 min at peak28 min without traffic
Lakdikapul≈ 76 min at peak31 min without traffic
Shamirpet (Genome Valley area)≈ 80 min at peak44 min without traffic
Kompally≈ 80 min at peak39 min without traffic
Rajiv Gandhi International Airport≈ 80 min at peak36 min without traffic
Nampally station (Hyderabad Deccan)≈ 82 min at peak32 min without traffic
Begumpet≈ 82 min at peak32 min without traffic
Abids≈ 83 min at peak34 min without traffic
Koti≈ 86 min at peak34 min without traffic
Jeedimetla≈ 87 min at peak36 min without traffic
Kacheguda station≈ 92 min at peak36 min without traffic
Secunderabad Junction≈ 92 min at peak36 min without traffic
Adibatla (Aerospace SEZ area)≈ 96 min at peak48 min without traffic
Dilsukhnagar≈ 98 min at peak40 min without traffic
LB Nagar≈ 105 min at peak44 min without traffic
Uppal≈ 107 min at peak43 min without traffic
Pocharam (Infosys campus area)≈ 108 min at peak56 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Not shown: we know the area but not the exact site, so distances would be misleading.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
RegistrationRegistration ended on 17/07/2024
Ask for: the paper that extends the registration beyond that date, or the paper that certifies the project as complete.Question: “The registration has ended. Which paper extends it or closes it, and may I see it?” See the registration dates
Asked SeenDate: Note:
CompletionThe declared completion date (17/07/2024) has passed
Ask for: the new completion date in writing and, if it exists, the paper that allows people to move in.Question: “What is the new completion date, and has permission to occupy been given for my block?” See declared progress
Asked SeenDate: Note:
An approval paper is filed on TG-RERA; its number is not stated
Ask for: the approval number, and the approved plan that carries it.Question: “What is the approval number, and does the plan show my tower and my floor?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 466 of 776 homes booked (record last updated 26/10/2023)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,262 to 2,084 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
2 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P01100000193
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P01100000193 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 7 buildings, the tallest with 10 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
64 of 12
54 of 12
44 of 12
33 of 12
24 of 12
15 of 12
B BLOCK10 floors with homes · 12 slabs filed · 2 basements · 98 homes, 51 booked
106 of 10
97 of 10
87 of 10
76 of 10
65 of 10
54 of 10
44 of 10
33 of 9
25 of 10
14 of 9
C BLOCK10 floors with homes · 12 slabs filed · 2 basements · 98 homes, 44 booked
104 of 9
95 of 10
84 of 10
73 of 10
65 of 10
54 of 10
45 of 10
34 of 10
25 of 10
15 of 9
D BLOCK10 floors with homes · 12 slabs filed · 2 basements · 100 homes, 87 booked
1010 of 10
910 of 10
89 of 10
710 of 10
610 of 10
510 of 10
49 of 10
37 of 10
26 of 10
16 of 10
F BLOCK10 floors with homes · 12 slabs filed · 2 basements · 120 homes, 54 booked
103 of 12
93 of 12
83 of 12
75 of 12
67 of 12
57 of 12
47 of 12
36 of 12
27 of 12
16 of 12
E BLOCK10 floors with homes · 12 slabs filed · 2 basements · 120 homes, 110 booked
1010 of 12
910 of 12
810 of 12
710 of 12
610 of 12
512 of 12
412 of 12
312 of 12
212 of 12
112 of 12
G BLOCK10 floors with homes · 12 slabs filed · 2 basements · 121 homes, 80 booked
107 of 13
97 of 12
87 of 12
79 of 12
69 of 12
59 of 12
49 of 13
37 of 11
29 of 12
17 of 12
The site: land, built-up area, survey number
Land
10.21 acres
Approved built-up area
13,09,358 sq ft
Buildings on the approved plan
7
Towers with homes
7
Highest floor with homes
10 floors
Lost to road widening or a lake's full tank level
None filed
Survey number
SY NO 376 A
Site boundaries
east
MAYFAIR VILLAS
west
60 FEET ROAD
north
AGRICULTURE LAND IN SY NO377
south
MAYFAIR VILLAS
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Energy management0% declared
Fire Protection And Fire Safety Requirements100% declared
Electrical Meter Room, Sub-Station, Receiving Station98% declared
Aggregate area of recreational Open Space95% declared
Internal Roads & Footpaths100% declared
Water Supply100% declared
Sewerage (Chamber, Lines, Septic Tank , STP)100% declared
Storm Water Drains100% declared
Green Strip/TOT LOT/Park85% declared
Street Lighting95% declared
Community Buildings90% declared
Treatment And Disposal Of Sewage And Sullage Water100% declared
Solid Waste Management And Disposal98% declared
Water Conservation, Rain water Harvesting100% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.
Listed nearby within 2 km
2 km: about 12 to 16 min drive at peak. Nearest first.
Hospitalsnone within 2 km
No hospitals on record within 2 km. Nearest hospital: , about 3.8 km.