Filed update 03/02/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Pictures and plans
18 held
All 18 pictures and plans
Pictures and plans 16
From the builder's website. Pictures may be artist's impressions.
Plans filed with TG-RERA 2
Filed with TG-RERA by the builder, as uploaded. People's names are covered. Not checked by PropMap.ai.
Registration status
Registration number
P02400008752Filed with TG-RERA
Registered on
09/09/2024Filed with TG-RERA
Valid until
08/09/2026Filed with TG-RERA
Extensions
At least 1, the latest valid until 08/01/2027Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Karni Akoya
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Pillar No. 136, Attapur, Rajendranagar, 500048Filed with TG-RERA
Mandal, district
Rajendranagar, Ranga ReddyFiled with TG-RERA
Map position
Exact: the TG-RERA portal's map pinFiled with TG-RERA
Drive times, places nearby and other projects within 5 km
Drive times
Mehdipatnam≈ 15 min at peak6 min without traffic
Lakdikapul≈ 23 min at peak10 min without traffic
Koti≈ 25 min at peak11 min without traffic
All 42 places
Nampally station (Hyderabad Deccan)≈ 25 min at peak10 min without traffic
Abids≈ 28 min at peak12 min without traffic
Panjagutta
Documents
Documents uploaded
33 of 41 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
18
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 37 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 10%
Building table 20%
Building table 30%
Building table 40%
Building table 50%
Building table 60%
Building table 70%
Building table 80%
Building table 90%
Building table 100%
Building table 110%
Building table 120%
Building table 130%
Building table 140%
Building table 150%
Building table 160%
Building table 170%
Building table 180%
Building table 190%
Building table 200%
Building table 210%
Building table 220%
Building table 230%
Building table 240%
Building table 250%
Building table 260%
Building table 270%
Building table 280%
Building table 290%
Building table 300%
Building table 310%
Building table 320%
Building table 330%
Building table 340%
Building table 350%
Building table 360%
Building table 370%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 37 building tables, no project figure filed.
No change between PropMap.ai's reads of 04/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (0%).
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 84 other projects in Rajendranagar mandal with a booked count, 23 declare a larger share booked, 0 a smaller one and 61 the same, as last filed (records last updated 17/12/2018 to 11/11/2026).
111 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Home types and sizes
5 BHK
Floors
2
Builder's site says · karni.co.in ↗ · read 13/11/2026
Towers, floor by floor (37)
booked not booked, as declared.
Villa No 12 slabs filedVilla No 22 slabs filedVilla No 32 slabs filedVilla No 42 slabs filedVilla No 52 slabs filedVilla No 62 slabs filedVilla No 72 slabs filedVilla No 82 slabs filedVilla No 92 slabs filedVilla No 102 slabs filedVilla No 112 slabs filed
≈ 28 min at peak
11 min without traffic
Kacheguda station≈ 28 min at peak12 min without traffic
Banjara Hills≈ 29 min at peak11 min without traffic
Ameerpet≈ 32 min at peak13 min without traffic
Dilsukhnagar≈ 33 min at peak14 min without traffic
Shamshabad≈ 34 min at peak17 min without traffic
Begumpet≈ 37 min at peak14 min without traffic
Manikonda≈ 37 min at peak13 min without traffic
Narsingi≈ 37 min at peak14 min without traffic
Jubilee Hills≈ 39 min at peak13 min without traffic
Secunderabad Junction≈ 39 min at peak16 min without traffic
Raidurg (Mindspace)≈ 40 min at peak14 min without traffic
Financial District≈ 41 min at peak15 min without traffic
Moosapet≈ 41 min at peak18 min without traffic
LB Nagar≈ 42 min at peak17 min without traffic
Uppal≈ 42 min at peak19 min without traffic
Kokapet≈ 42 min at peak16 min without traffic
Khajaguda≈ 42 min at peak15 min without traffic
Balanagar≈ 42 min at peak18 min without traffic
Madhapur≈ 44 min at peak15 min without traffic
Gachibowli≈ 45 min at peak15 min without traffic
HITEC City≈ 45 min at peak15 min without traffic
DLF Cyber City, Gachibowli≈ 45 min at peak16 min without traffic
Kondapur≈ 48 min at peak17 min without traffic
Kukatpally≈ 48 min at peak21 min without traffic
Nanakramguda (Waverock)≈ 49 min at peak20 min without traffic
Jeedimetla≈ 54 min at peak24 min without traffic
Tellapur≈ 57 min at peak26 min without traffic
Rajiv Gandhi International Airport≈ 57 min at peak24 min without traffic
Kollur≈ 59 min at peak27 min without traffic
Miyapur≈ 59 min at peak22 min without traffic
Kompally≈ 63 min at peak28 min without traffic
Patancheru≈ 66 min at peak30 min without traffic
Lingampally≈ 66 min at peak23 min without traffic
Pocharam (Infosys campus area)≈ 68 min at peak31 min without traffic
Adibatla (Aerospace SEZ area)≈ 76 min at peak31 min without traffic
Shamirpet (Genome Valley area)≈ 94 min at peak38 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02400008752 · by Karni Estates India Private Limited · Pillar No. 136, Attapur, Rajendranagar, 500048
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
On recordRegistration is current until 08/01/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 08/01/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
An approval paper is filed on TG-RERA; its number is not stated
Ask for: the approval number, and the approved plan that carries it.Question: “What is the approval number, and does the plan show my tower and my floor?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 0 of 111 homes booked (record last updated 03/02/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
23 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02400008752
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400008752 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 37 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 0% of work (record last updated 03/02/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 10 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
On recordA registered address is on record
Look at: that the site you are shown is at the registered address, and what stands on each side of it.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the registered address
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Villa No 122 slabs filed
Villa No 132 slabs filed
Villa No 142 slabs filed
Villa No 152 slabs filed
Villa No 162 slabs filed
Villa No 172 slabs filed
Villa No 182 slabs filed
Villa No 192 slabs filed
Villa No 202 slabs filed
Villa No 212 slabs filed
Villa No 222 slabs filed
Villa No 232 slabs filed
Villa No 242 slabs filed
Villa No 252 slabs filed
Villa No 262 slabs filed
Villa No 272 slabs filed
Villa No 282 slabs filed
Villa No 292 slabs filed
Villa No 302 slabs filed
Villa No 312 slabs filed
Villa No 322 slabs filed
Villa No 332 slabs filed
Villa No 342 slabs filed
Villa No 352 slabs filed
Villa No 362 slabs filed
Villa No 372 slabs filed
The site: land, built-up area, survey number
Land
4.17 acres
Net of road and water setbacks
4.14 acres
Approved built-up area
1,58,349 sq ft
Buildings on the approved plan
37
Towers with homes
37
Lost to road widening or a lake's full tank level
1,175 sq ft
Survey number
53/P, 54/P, 55/P, 90 and 91
Site boundaries
east
Road and Neighbours Land
west
Owners Property
north
Neighbours Land
south
Owners Property
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Declared by the builder, not inspected.
Amenities (7)
jogging track
kids play area
party hall
power backup
security
theatre
yoga
Builder's site says · karni.co.in ↗ · read 13/11/2026
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Exact location
Listed nearby within 2 km
2 km: about 8 min drive at peak. Nearest first.
Hospitalsnone within 2 km
No hospitals on record within 2 km. Nearest hospital: , 2.4 km.