Filed update 24/01/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Riddhis Laxman County
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
MANHAL, MANKHAL, Thukkuguda, Maheshwaram, 501359Filed with TG-RERA
Mandal, district
Maheshwaram, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Shamshabad≈ 26 min at peak15 min without traffic
Rajiv Gandhi International Airport≈ 28 min at peak10 min without traffic
Adibatla (Aerospace SEZ area)≈ 29 min at peak13 min without traffic
All 42 places
Narsingi≈ 42 min at peak25 min without traffic
Kokapet
Documents
Documents uploaded
17 of 24 document slotsFiled with TG-RERA
Document groups on the record
3 (8 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 58 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 180%
Building table 280%
Building table 380%
Building table 480%
Building table 580%
Building table 680%
Building table 780%
Building table 880%
Building table 980%
Building table 1080%
Building table 1180%
Building table 1280%
Building table 1380%
Building table 1480%
Building table 1580%
Building table 1680%
Building table 1780%
Building table 1880%
Building table 1980%
Building table 2080%
Building table 2180%
Building table 2280%
Building table 2380%
Building table 2480%
Building table 2580%
Building table 2680%
Building table 2780%
Building table 2880%
Building table 2980%
Building table 3080%
Building table 3180%
Building table 3280%
Building table 3380%
Building table 3480%
Building table 3580%
Building table 3680%
Building table 3780%
Building table 3880%
Building table 3980%
Building table 4080%
Building table 4180%
Building table 4280%
Building table 4380%
Building table 4480%
Building table 4580%
Building table 4680%
Building table 4780%
Building table 4880%
Building table 4980%
Building table 5080%
Building table 5180%
Building table 5280%
Building table 5380%
Building table 5480%
Building table 5580%
Building table 5680%
Building table 5780%
Building table 5880%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 58 building tables, no project figure filed.
This filing's revised completion date is 03/04/2027: of 4 other filings under the same TG-RERA promoter record, 1 has a later date, 3 an earlier one and 0 the same, as last filed (records last updated 17/02/2022 to 27/01/2026).
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (80%).
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 35 other projects in Maheshwaram mandal with a booked count, 2 declare a larger share booked, 33 a smaller one and 0 the same, as last filed (records last updated 08/06/2021 to 13/11/2026).
58 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (58)
booked not booked, as declared.
VILLA 11 slabs filed · 1 basementVILLA NO 21 slabs filed · 1 basementVILLA NO 31 slabs filed · 1 basementVILLA NO 41 slabs filed · 1 basementVILLA NO 51 slabs filed · 1 basementVILLA NO 61 slabs filed · 1 basementVILLA NO 71 slabs filed · 1 basementVILLA NO 81 slabs filed · 1 basementVILLA NO 91 slabs filed · 1 basementVILLA NO 101 slabs filed · 1 basementVILLA NO 111 slabs filed · 1 basementVILLA NO 121 slabs filed · 1 basementVILLA NO 131 slabs filed · 1 basementVILLA NO 141 slabs filed · 1 basementVILLA NO 151 slabs filed · 1 basement
≈ 43 min at peak
26 min without traffic
Raidurg (Mindspace)≈ 45 min at peak28 min without traffic
Khajaguda≈ 45 min at peak27 min without traffic
DLF Cyber City, Gachibowli≈ 45 min at peak28 min without traffic
Gachibowli≈ 45 min at peak28 min without traffic
Financial District≈ 45 min at peak26 min without traffic
Kondapur≈ 48 min at peak29 min without traffic
Nanakramguda (Waverock)≈ 49 min at peak30 min without traffic
HITEC City≈ 50 min at peak30 min without traffic
Manikonda≈ 52 min at peak29 min without traffic
Mehdipatnam≈ 52 min at peak28 min without traffic
LB Nagar≈ 53 min at peak25 min without traffic
Koti≈ 53 min at peak25 min without traffic
Nampally station (Hyderabad Deccan)≈ 53 min at peak25 min without traffic
Lakdikapul≈ 55 min at peak26 min without traffic
Abids≈ 55 min at peak26 min without traffic
Kacheguda station≈ 56 min at peak25 min without traffic
Madhapur≈ 56 min at peak32 min without traffic
Tellapur≈ 57 min at peak35 min without traffic
Dilsukhnagar≈ 58 min at peak24 min without traffic
Pocharam (Infosys campus area)≈ 59 min at peak36 min without traffic
Kollur≈ 59 min at peak36 min without traffic
Panjagutta≈ 61 min at peak29 min without traffic
Jubilee Hills≈ 62 min at peak34 min without traffic
Banjara Hills≈ 62 min at peak30 min without traffic
Miyapur≈ 64 min at peak35 min without traffic
Ameerpet≈ 66 min at peak31 min without traffic
Patancheru≈ 66 min at peak42 min without traffic
Uppal≈ 66 min at peak31 min without traffic
Lingampally≈ 67 min at peak36 min without traffic
Kukatpally≈ 69 min at peak37 min without traffic
Secunderabad Junction≈ 70 min at peak31 min without traffic
Begumpet≈ 70 min at peak32 min without traffic
Shamirpet (Genome Valley area)≈ 72 min at peak46 min without traffic
Balanagar≈ 74 min at peak36 min without traffic
Moosapet≈ 75 min at peak35 min without traffic
Jeedimetla≈ 85 min at peak40 min without traffic
Kompally≈ 90 min at peak43 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
On recordRegistration is current until 03/04/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 03/04/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 0000179/LO/Plg/HMDA/ is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 28 of 58 homes booked (record last updated 24/01/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
8 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02400003563
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400003563 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 58 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 80% of work (record last updated 24/01/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
VILLA NO 161 slabs filed · 1 basement
VILLA NO 171 slabs filed · 1 basement
VILLA NO 181 slabs filed · 1 basement
VILLA NO 191 slabs filed · 1 basement
VILLA NO 201 slabs filed · 1 basement
VILLA NO 211 slabs filed · 1 basement
VILLA NO 221 slabs filed · 1 basement
VILLA NO 231 slabs filed · 1 basement
VILLA NO 241 slabs filed · 1 basement
VILLA NO 251 slabs filed · 1 basement
VILLA NO 261 slabs filed · 1 basement
VILLA NO 271 slabs filed · 1 basement
VILLA NO 281 slabs filed · 1 basement
VILLA NO 291 slabs filed · 1 basement
VILLA NO 301 slabs filed · 1 basement
VILLA NO 311 slabs filed · 1 basement
VILLA NO 321 slabs filed · 1 basement
VILLA NO 331 slabs filed · 1 basement
VILLA NO 341 slabs filed · 1 basement
VILLA NO 351 slabs filed · 1 basement
VILLA NO 361 slabs filed · 1 basement
VILLA NO 371 slabs filed · 1 basement
VILLA NO 381 slabs filed · 1 basement
VILLA NO 391 slabs filed · 1 basement
VILLA NO 401 slabs filed · 1 basement
VILLA NO 411 slabs filed · 1 basement
VILLA NO 421 slabs filed · 1 basement
VILLA NO 431 slabs filed · 1 basement
VILLA NO 441 slabs filed · 1 basement
VILLA NO 451 slabs filed · 1 basement
VILLA NO 461 slabs filed · 1 basement
VILLA NO 471 slabs filed · 1 basement
VILLA NO 481 slabs filed · 1 basement
VILLA NO 491 slabs filed · 1 basement
VILLA NO 501 slabs filed · 1 basement
VILLA NO 511 slabs filed · 1 basement
VILLA NO 521 slabs filed · 1 basement
VILLA NO 531 slabs filed · 1 basement
VILLA NO 541 slabs filed · 1 basement
VILLA NO 551 slabs filed · 1 basement
VILLA NO 561 slabs filed · 1 basement
VILLA NO 571 slabs filed · 1 basement
VILLA NO 581 slabs filed · 1 basement
The site: land, built-up area, survey number
Land
6.28 acres
Approved built-up area
1,68,791 sq ft
Buildings on the approved plan
58
Towers with homes
58
Lost to road widening or a lake's full tank level
None filed
Survey number
837/A, 838, 839 AND 841/E
Site boundaries
east
OTHERS LAND
west
OTHERS LAND
north
OTHERS LAND
south
OTHERS LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths100% declared
Water Supply100% declared
Sewerage (Chamber, Lines, Septic Tank , STP)100% declared
Storm Water Drains100% declared
Green Strip/TOT LOT/Park100% declared
Street Lighting100% declared
Community Buildings100% declared
Treatment And Disposal Of Sewage And Sullage Water100% declared
Solid Waste Management And Disposal100% declared
Water Conservation, Rain water Harvesting100% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station100% declared
Aggregate area of recreational Open Space0% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.