Filed update 14/03/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Pictures and plans
2 held
All 2 pictures and plans
Pictures and plans 2
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02400009462Filed with TG-RERA
Registered on
03/12/2024Filed with TG-RERA
Valid until
02/12/2029Filed with TG-RERA
Extensions
At least 1, the latest valid until 02/04/2030Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Mirai Mist
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Gandipet Mandal, Kokapet Village, Gandipet, koKapet, 500075Filed with TG-RERA
Mandal, district
Gandipet, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Kokapet≈ 4 min at peak2 min without traffic
Financial District≈ 13 min at peak5 min without traffic
Narsingi≈ 16 min at peak6 min without traffic
All 42 places
Raidurg (Mindspace)≈ 19 min at peak10 min without traffic
Gachibowli
Documents
Documents uploaded
24 of 33 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
2
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 25 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 120%
Building table 220%
Building table 320%
Building table 420%
Building table 520%
Building table 620%
Building table 720%
Building table 820%
Building table 920%
Building table 1020%
Building table 1120%
Building table 1220%
Building table 1320%
Building table 1420%
Building table 1520%
Building table 1620%
Building table 1720%
Building table 1820%
Building table 1920%
Building table 2020%
Building table 2120%
Building table 2220%
Building table 2320%
Building table 2420%
Building table 2520%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 25 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (20%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 352 other projects in Gandipet mandal with a booked count, 145 declare a larger share booked, 0 a smaller one and 207 the same, as last filed (records last updated 12/12/2018 to 23/11/2026).
25 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (25)
booked not booked, as declared.
Villa no 13 slabs filedClub House3 slabs filedVilla no 23 slabs filedVilla no 33 slabs filedVilla no 43 slabs filedVilla no 53 slabs filedVilla no 63 slabs filedVilla no 73 slabs filedVilla no 83 slabs filedVilla no 93 slabs filedVilla no 103 slabs filedVilla no 113 slabs filedVilla no 123 slabs filedVilla no 133 slabs filedVilla no 143 slabs filedVilla No153 slabs filed
≈ 19 min at peak
8 min without traffic
Khajaguda≈ 19 min at peak9 min without traffic
DLF Cyber City, Gachibowli≈ 19 min at peak9 min without traffic
Nanakramguda (Waverock)≈ 20 min at peak8 min without traffic
Kondapur≈ 22 min at peak10 min without traffic
HITEC City≈ 24 min at peak11 min without traffic
Tellapur≈ 26 min at peak13 min without traffic
Manikonda≈ 27 min at peak10 min without traffic
Kollur≈ 28 min at peak14 min without traffic
Madhapur≈ 31 min at peak14 min without traffic
Shamshabad≈ 34 min at peak19 min without traffic
Patancheru≈ 35 min at peak21 min without traffic
Jubilee Hills≈ 36 min at peak15 min without traffic
Miyapur≈ 38 min at peak16 min without traffic
Mehdipatnam≈ 39 min at peak16 min without traffic
Lingampally≈ 41 min at peak16 min without traffic
Kukatpally≈ 43 min at peak18 min without traffic
Banjara Hills≈ 48 min at peak19 min without traffic
Lakdikapul≈ 48 min at peak20 min without traffic
Balanagar≈ 48 min at peak20 min without traffic
Moosapet≈ 49 min at peak21 min without traffic
Panjagutta≈ 50 min at peak19 min without traffic
Rajiv Gandhi International Airport≈ 52 min at peak24 min without traffic
Ameerpet≈ 54 min at peak21 min without traffic
Nampally station (Hyderabad Deccan)≈ 54 min at peak21 min without traffic
Abids≈ 55 min at peak23 min without traffic
Koti≈ 58 min at peak24 min without traffic
Begumpet≈ 58 min at peak23 min without traffic
Kacheguda station≈ 63 min at peak25 min without traffic
Secunderabad Junction≈ 64 min at peak26 min without traffic
Adibatla (Aerospace SEZ area)≈ 67 min at peak37 min without traffic
Dilsukhnagar≈ 70 min at peak27 min without traffic
Shamirpet (Genome Valley area)≈ 74 min at peak45 min without traffic
Kompally≈ 74 min at peak35 min without traffic
LB Nagar≈ 76 min at peak31 min without traffic
Jeedimetla≈ 77 min at peak31 min without traffic
Uppal≈ 79 min at peak32 min without traffic
Pocharam (Infosys campus area)≈ 97 min at peak44 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02400009462 · by Manomay Developers · Gandipet Mandal, Kokapet Village, Gandipet, koKapet, 500075
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
On recordRegistration is current until 02/04/2030
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 02/04/2030, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 003541/LO/HMDA/0638/SKP/2022 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 0 of 25 homes booked (record last updated 14/03/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
7 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02400009462
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400009462 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 24 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 20% of work (record last updated 14/03/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 9 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Villa no 16
3 slabs filed
Villa no 173 slabs filed
Villa no 183 slabs filed
Villa no 193 slabs filed
Villa no 203 slabs filed
Villa no 213 slabs filed
Villa no 223 slabs filed
Villa no 233 slabs filed
Villa no 243 slabs filed
The site: land, built-up area, survey number
Land
3.81 acres
Net of road and water setbacks
3.46 acres
Approved built-up area
1,41,787 sq ft
Buildings on the approved plan
25
Towers with homes
24
Lost to road widening or a lake's full tank level
15,227 sq ft
Survey number
167/3
Site boundaries
east
Neighbours Land
west
Sy no 166 and 167D
north
Sy no 168
south
(name withheld) Road
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.
Listed nearby within 2 km
2 km: about 10 min drive at peak. Nearest first.
Hospitalsnone within 2 km
No hospitals on record within 2 km. Nearest hospital: , about 2.0 km.