Left blank in the filingwork declared by the builder, 3 building tables
Building table 10%
Building table 20%
Building table 30%
Filed update 16/09/2026 · read 24/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 24/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 24/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its , after a compliance review, with the sources searched and their dates.
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 24/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Pocharam (Infosys campus area)≈ 3 min at peak2 min without traffic
Uppal≈ 32 min at peak15 min without traffic
LB Nagar≈ 45 min at peak21 min without traffic
All 42 places
Shamirpet (Genome Valley area)≈ 45 min at peak26 min without traffic
Dilsukhnagar
Documents
Documents uploaded
48 of 52 document slotsFiled with TG-RERA
Document groups on the record
4 (11 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 3 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 24/11/2026.
Building table 10%
Building table 20%
Building table 30%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 3 building tables, no project figure filed.
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
2, 2.5, 3 BHK · 1,275 to 1,900 sq ftFiled with TG-RERA
Types, sizes, bookings and the cost calculator
0 of 277 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 61 other projects in Ghatkesar mandal with a booked count, 12 declare a larger share booked, 0 a smaller one and 49 the same, as last filed (records last updated 20/07/2019 to 22/10/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
68
68
1,275 to 1,900 sq ft
2.5 BHK
68
68
1,475 to 1,790 sq ft
3 BHK
135
135
1,275 to 1,900 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing. 6 other units are filed without a bedroom type, such as clubhouses or shops.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (3)
booked not booked, as declared.
TOWER 117 floors with homes · 17 slabs filed · 136 homes, 0 booked
170 of 8
160 of 8
150 of 8
140 of 8
130 of 8
120 of 8
≈ 52 min at peak
23 min without traffic
Kacheguda station≈ 53 min at peak24 min without traffic
Koti≈ 53 min at peak25 min without traffic
Secunderabad Junction≈ 57 min at peak23 min without traffic
Abids≈ 59 min at peak27 min without traffic
Nampally station (Hyderabad Deccan)≈ 59 min at peak27 min without traffic
Lakdikapul≈ 60 min at peak28 min without traffic
Adibatla (Aerospace SEZ area)≈ 61 min at peak34 min without traffic
Kompally≈ 63 min at peak36 min without traffic
Panjagutta≈ 68 min at peak30 min without traffic
Mehdipatnam≈ 69 min at peak31 min without traffic
Jeedimetla≈ 70 min at peak34 min without traffic
Ameerpet≈ 72 min at peak30 min without traffic
Begumpet≈ 73 min at peak29 min without traffic
Banjara Hills≈ 73 min at peak32 min without traffic
Shamshabad≈ 79 min at peak43 min without traffic
Moosapet≈ 81 min at peak34 min without traffic
Balanagar≈ 82 min at peak35 min without traffic
Patancheru≈ 84 min at peak52 min without traffic
Rajiv Gandhi International Airport≈ 84 min at peak45 min without traffic
Jubilee Hills≈ 88 min at peak37 min without traffic
Kukatpally≈ 88 min at peak38 min without traffic
Tellapur≈ 91 min at peak55 min without traffic
Miyapur≈ 91 min at peak42 min without traffic
Manikonda≈ 92 min at peak40 min without traffic
Kollur≈ 94 min at peak56 min without traffic
Narsingi≈ 95 min at peak43 min without traffic
Madhapur≈ 95 min at peak39 min without traffic
Raidurg (Mindspace)≈ 96 min at peak40 min without traffic
Kokapet≈ 96 min at peak44 min without traffic
Khajaguda≈ 98 min at peak41 min without traffic
Gachibowli≈ 98 min at peak41 min without traffic
DLF Cyber City, Gachibowli≈ 98 min at peak42 min without traffic
Financial District≈ 99 min at peak44 min without traffic
HITEC City≈ 100 min at peak41 min without traffic
Lingampally≈ 101 min at peak48 min without traffic
Kondapur≈ 101 min at peak43 min without traffic
Nanakramguda (Waverock)≈ 102 min at peak47 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02200011230 · by Anuhar Mahaan Homes LLP · Pocharam, Ghatkesar, 500088
Built by rule from this project's TG-RERA record, read by PropMap.ai on 24/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 18/03/2031
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 18/03/2031, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 052069/GHT/R1/U6/HMDA/31012022 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 0 of 277 homes booked (record last updated 16/09/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,275 to 1,900 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
5 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02200011230
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200011230 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 2 buildings, the tallest with 17 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 12 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
110 of 8
100 of 8
90 of 8
80 of 8
70 of 8
60 of 8
50 of 8
40 of 8
30 of 8
20 of 8
10 of 8
TOWER 217 floors with homes · 17 slabs filed · 135 homes, 0 booked
170 of 8
160 of 8
150 of 8
140 of 8
130 of 8
120 of 8
110 of 8
100 of 8
90 of 8
80 of 8
70 of 8
60 of 8
50 of 8
40 of 8
30 of 7
20 of 8
10 of 8
CLUB HOUSE5 slabs filed
The site: land, built-up area, survey number
Land
8.48 acres
Approved built-up area
3,69,271 sq ft
Buildings on the approved plan
3
Towers with homes
2
Highest floor with homes
17 floors
Lost to road widening or a lake's full tank level
None filed
Survey number
10/2 PART,2/1 PART,2/2 PART,2/3 PART,2/4 PART,6,7,8,9&10 PART
Site boundaries
east
OTHER LAND
west
OTHER LAND
north
OTHER LAND
south
OTHER LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.