Filed update 17/06/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Plans
1 held
All 1 plan
Plans filed with TG-RERA 1
Filed with TG-RERA by the builder, as uploaded. People's names are covered. Not checked by PropMap.ai.
Registration status
Registration number
P02400011108Filed with TG-RERA
Registered on
12/05/2026Filed with TG-RERA
Valid until
12/09/2031, extended (first certificate to 12/05/2031)Filed with TG-RERA
Extensions
At least 1, the latest valid until 12/09/2031Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 06/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
The Roots by Ramky
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
CHANDIPPA, SHANKARPALLY, Shankarpalle, 501203Filed with TG-RERA
Mandal, district
Shankarpalle, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Kollur≈ 60 min at peak20 min without traffic
Tellapur≈ 61 min at peak20 min without traffic
Patancheru≈ 68 min at peak24 min without traffic
All 42 places
Kokapet≈ 80 min at peak27 min without traffic
Financial District≈ 80 min at peak
Documents
Documents uploaded
28 of 32 document slotsFiled with TG-RERA
Document groups on the record
4 (11 documents)Filed with TG-RERA
Pictures and plans held
1
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 141 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 10%
Building table 20%
Building table 30%
Building table 40%
Building table 50%
Building table 60%
Building table 70%
Building table 80%
Building table 90%
Building table 100%
Building table 110%
Building table 120%
Building table 130%
Building table 140%
Building table 150%
Building table 160%
Building table 170%
Building table 180%
Building table 190%
Building table 200%
Building table 210%
Building table 220%
Building table 230%
Building table 240%
Building table 250%
Building table 260%
Building table 270%
Building table 280%
Building table 290%
Building table 300%
Building table 310%
Building table 320%
Building table 330%
Building table 340%
Building table 350%
Building table 360%
Building table 370%
Building table 380%
Building table 390%
Building table 400%
Building table 410%
Building table 420%
Building table 430%
Building table 440%
Building table 450%
Building table 460%
Building table 470%
Building table 480%
Building table 490%
Building table 500%
Building table 510%
Building table 520%
Building table 530%
Building table 540%
Building table 550%
Building table 560%
Building table 570%
Building table 580%
Building table 590%
Building table 600%
Building table 610%
Building table 620%
Building table 630%
Building table 640%
Building table 650%
Building table 660%
Building table 670%
Building table 680%
Building table 690%
Building table 700%
Building table 710%
Building table 720%
Building table 730%
Building table 740%
Building table 750%
Building table 760%
Building table 770%
Building table 780%
Building table 790%
Building table 800%
Building table 810%
Building table 820%
Building table 830%
Building table 840%
Building table 850%
Building table 860%
Building table 870%
Building table 880%
Building table 890%
Building table 900%
Building table 910%
Building table 920%
Building table 930%
Building table 940%
Building table 950%
Building table 960%
Building table 970%
Building table 980%
Building table 990%
Building table 1000%
Building table 1010%
Building table 1020%
Building table 1030%
Building table 1040%
Building table 1050%
Building table 1060%
Building table 1070%
Building table 1080%
Building table 1090%
Building table 1100%
Building table 1110%
Building table 1120%
Building table 1130%
Building table 1140%
Building table 1150%
Building table 1160%
Building table 1170%
Building table 1180%
Building table 1190%
Building table 1200%
Building table 1210%
Building table 1220%
Building table 1230%
Building table 1240%
Building table 1250%
Building table 1260%
Building table 1270%
Building table 1280%
Building table 1290%
Building table 1300%
Building table 1310%
Building table 1320%
Building table 1330%
Building table 1340%
Building table 1350%
Building table 1360%
Building table 1370%
Building table 1380%
Building table 1390%
Building table 1400%
Building table 1410%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 141 building tables, no project figure filed.
No change between PropMap.ai's reads of 04/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (0%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 38 other projects in Shankarpalle mandal with a booked count, 16 declare a larger share booked, 0 a smaller one and 22 the same, as last filed (records last updated 08/01/2019 to 13/11/2026).
141 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Raidurg (Mindspace)≈ 81 min at peak32 min without traffic
Gachibowli≈ 81 min at peak31 min without traffic
Khajaguda≈ 81 min at peak31 min without traffic
DLF Cyber City, Gachibowli≈ 81 min at peak32 min without traffic
Nanakramguda (Waverock)≈ 82 min at peak31 min without traffic
Kondapur≈ 84 min at peak33 min without traffic
HITEC City≈ 86 min at peak34 min without traffic
Narsingi≈ 86 min at peak28 min without traffic
Lingampally≈ 87 min at peak31 min without traffic
Manikonda≈ 92 min at peak32 min without traffic
Miyapur≈ 93 min at peak35 min without traffic
Madhapur≈ 93 min at peak36 min without traffic
Shamshabad≈ 96 min at peak41 min without traffic
Jubilee Hills≈ 98 min at peak38 min without traffic
Mehdipatnam≈ 101 min at peak37 min without traffic
Kukatpally≈ 103 min at peak40 min without traffic
Balanagar≈ 108 min at peak42 min without traffic
Moosapet≈ 110 min at peak43 min without traffic
Banjara Hills≈ 110 min at peak41 min without traffic
Lakdikapul≈ 110 min at peak42 min without traffic
Shamirpet (Genome Valley area)≈ 111 min at peak52 min without traffic
Kompally≈ 112 min at peak49 min without traffic
Panjagutta≈ 112 min at peak42 min without traffic
Rajiv Gandhi International Airport≈ 114 min at peak46 min without traffic
Nampally station (Hyderabad Deccan)≈ 116 min at peak43 min without traffic
Ameerpet≈ 116 min at peak43 min without traffic
Abids≈ 117 min at peak45 min without traffic
Jeedimetla≈ 118 min at peak51 min without traffic
Koti≈ 120 min at peak45 min without traffic
Begumpet≈ 120 min at peak45 min without traffic
Kacheguda station≈ 126 min at peak46 min without traffic
Secunderabad Junction≈ 126 min at peak48 min without traffic
Adibatla (Aerospace SEZ area)≈ 129 min at peak59 min without traffic
Dilsukhnagar≈ 132 min at peak49 min without traffic
LB Nagar≈ 139 min at peak53 min without traffic
Pocharam (Infosys campus area)≈ 140 min at peak66 min without traffic
Uppal≈ 141 min at peak53 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 12/09/2031
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 12/09/2031, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 006412/HMDA/01935/SWDL/SKP2/2025 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 0 of 141 homes booked (record last updated 17/06/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
2 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02400011108
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400011108 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 140 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 0% of work (record last updated 17/06/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
VILLA 183 slabs filed
VILLA 193 slabs filed
VILLA 203 slabs filed
VILLA 213 slabs filed
VILLA 223 slabs filed
VILLA 233 slabs filed
VILLA 243 slabs filed
VILLA 253 slabs filed
VILLA 263 slabs filed
VILLA 273 slabs filed
VILLA 283 slabs filed
VILLA 293 slabs filed
VILLA 303 slabs filed
VILLA 313 slabs filed
VILLA 323 slabs filed
VILLA 333 slabs filed
VILLA 343 slabs filed
VILLA 353 slabs filed
VILLA 363 slabs filed
VILLA 373 slabs filed
VILLA 383 slabs filed
VILLA 393 slabs filed
VILLA 403 slabs filed
VILLA 413 slabs filed
VILLA 423 slabs filed
VILLA 433 slabs filed
VILLA 443 slabs filed
VILLA 453 slabs filed
VILLA 463 slabs filed
VILLA 473 slabs filed
VILLA 483 slabs filed
VILLA 493 slabs filed
VILLA 503 slabs filed
VILLA 513 slabs filed
VILLA 523 slabs filed
VILLA 533 slabs filed
VILLA 543 slabs filed
VILLA 553 slabs filed
VILLA 563 slabs filed
VILLA 573 slabs filed
VILLA 583 slabs filed
VILLA 593 slabs filed
VILLA 603 slabs filed
VILLA 613 slabs filed
VILLA 623 slabs filed
VILLA 633 slabs filed
VILLA 643 slabs filed
VILLA 653 slabs filed
VILLA 663 slabs filed
VILLA 673 slabs filed
VILLA 683 slabs filed
VILLA 693 slabs filed
VILLA 703 slabs filed
VILLA 713 slabs filed
VILLA 723 slabs filed
VILLA 733 slabs filed
VILLA 743 slabs filed
VILLA 753 slabs filed
VILLA 763 slabs filed
VILLA 773 slabs filed
VILLA 783 slabs filed
VILLA 793 slabs filed
VILLA 803 slabs filed
VILLA 813 slabs filed
VILLA 823 slabs filed
VILLA 833 slabs filed
VILLA 843 slabs filed
VILLA 853 slabs filed
VILLA 863 slabs filed
VILLA 873 slabs filed
VILLA 883 slabs filed
VILLA 893 slabs filed
VILLA 903 slabs filed
VILLA 913 slabs filed
VILLA 923 slabs filed
VILLA 933 slabs filed
VILLA 943 slabs filed
VILLA 953 slabs filed
VILLA 95A3 slabs filed
VILLA 963 slabs filed
VILLA 983 slabs filed
VILLA 993 slabs filed
VILLA 1003 slabs filed
VILLA 973 slabs filed
VILLA 96A3 slabs filed
VILLA 1013 slabs filed
VILLA 1023 slabs filed
VILLA 1033 slabs filed
VILLA 1043 slabs filed
VILLA 1053 slabs filed
VILLA 1063 slabs filed
VILLA 1073 slabs filed
VILLA 1083 slabs filed
VILLA 1093 slabs filed
VILLA 1103 slabs filed
VILLA 1113 slabs filed
VILLA 1123 slabs filed
VILLA 1133 slabs filed
VILLA 1143 slabs filed
VILLA 1153 slabs filed
VILLA 1163 slabs filed
VILLA 1173 slabs filed
VILLA 1183 slabs filed
VILLA 1193 slabs filed
VILLA 1203 slabs filed
VILLA 1213 slabs filed
VILLA 1223 slabs filed
VILLA 1233 slabs filed
VILLA 1243 slabs filed
VILLA 1253 slabs filed
VILLA 1263 slabs filed
VILLA 1273 slabs filed
VILLA 1283 slabs filed
VILLA 1293 slabs filed
VILLA 1303 slabs filed
VILLA 1313 slabs filed
VILLA 1323 slabs filed
VILLA 1333 slabs filed
VILLA 1343 slabs filed
VILLA 1353 slabs filed
VILLA 1363 slabs filed
VILLA 1373 slabs filed
VILLA 1383 slabs filed
CLUB HOUSE3 slabs filed
The site: land, built-up area, survey number
Land
17.02 acres
Net of road and water setbacks
16.15 acres
Approved built-up area
5,23,034 sq ft
Buildings on the approved plan
141
Towers with homes
140
Lost to road widening or a lake's full tank level
38,189 sq ft
Survey number
127/1, 127/2
Site boundaries
east
VILLAGE ROAD
west
SY NO 128
north
VILLAGE ROAD
south
SY NOS 123 AND 126
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open Space0% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.