From the builder's website. Pictures may be artist's impressions.
Status, as filed
Left blank in the filingwork declared by the builder, 3 building tables
Building table 12%
Building table 22%
Building table 30%
Filed update 27/10/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its , after a compliance review, with the sources searched and their dates.
Pictures and plans
2 held
All 2 pictures and plans
Pictures and plans 2
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02200010981Filed with TG-RERA
Registered on
05/06/2026Filed with TG-RERA
Valid until
05/06/2031Filed with TG-RERA
Extensions
At least 1, the latest valid until 05/10/2031Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Phase IV, KPHB Colony, Kukatpally, 500085Filed with TG-RERA
Mandal, district
Kukatpally, Medchal-MalkajgiriFiled with TG-RERA
Map position
Exact: the TG-RERA portal's map pinFiled with TG-RERA
Drive times, places nearby and other projects within 5 km
Drive times
HITEC City≈ 11 min at peak4 min without traffic
Raidurg (Mindspace)≈ 15 min at peak5 min without traffic
Kukatpally≈ 16 min at peak6 min without traffic
All 42 places
Kondapur≈ 18 min at peak6 min without traffic
Madhapur≈ 19 min at peak6 min without traffic
Balanagar
Documents
Documents uploaded
27 of 33 document slotsFiled with TG-RERA
Document groups on the record
4 (9 documents)Filed with TG-RERA
Pictures and plans held
2
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 3 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 12%
Building table 22%
Building table 30%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 3 building tables, no project figure filed.
This filing's proposed completion date is 05/10/2031: of 3 other filings under the same TG-RERA promoter record, 0 have a later date, 3 an earlier one and 0 the same, as last filed (records last updated 15/09/2026 to 29/10/2026).
No change between PropMap.ai's reads of 05/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (1.3%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
Declared by the builder to TG-RERA, not checked against those projects.
Homes
Homes, total
1,436Filed with TG-RERA
Booked, as declared
430Filed with TG-RERA
Home types and sizes
3, 4 BHK · 1,588 to 3,261 sq ftFiled with TG-RERA
Types, sizes, bookings and the cost calculator
430 of 1,436 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 73 other projects in Kukatpally mandal with a booked count, 11 declare a larger share booked, 62 a smaller one and 0 the same, as last filed (records last updated 09/01/2019 to 07/11/2026).
Home types
Type
Homes
Not booked
Saleable size
3 BHK
1,157
777
1,588 to 2,214 sq ft
4 BHK
270
221
3,214 to 3,261 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing. 9 other units are filed without a bedroom type, such as clubhouses or shops.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (3)
booked not booked, as declared.
TOWER - A46 floors with homes · 46 slabs filed · 4 basements · 713 homes, 295 booked
462 of 16
452 of 16
443 of 16
43
≈ 21 min at peak
8 min without traffic
Moosapet≈ 22 min at peak9 min without traffic
Miyapur≈ 22 min at peak9 min without traffic
Jubilee Hills≈ 23 min at peak8 min without traffic
DLF Cyber City, Gachibowli≈ 24 min at peak8 min without traffic
Gachibowli≈ 26 min at peak9 min without traffic
Khajaguda≈ 28 min at peak10 min without traffic
Financial District≈ 29 min at peak12 min without traffic
Ameerpet≈ 32 min at peak12 min without traffic
Panjagutta≈ 32 min at peak13 min without traffic
Lingampally≈ 32 min at peak12 min without traffic
Narsingi≈ 35 min at peak14 min without traffic
Manikonda≈ 35 min at peak12 min without traffic
Banjara Hills≈ 35 min at peak12 min without traffic
Nanakramguda (Waverock)≈ 36 min at peak15 min without traffic
Kokapet≈ 37 min at peak15 min without traffic
Lakdikapul≈ 39 min at peak16 min without traffic
Begumpet≈ 40 min at peak15 min without traffic
Mehdipatnam≈ 41 min at peak14 min without traffic
Patancheru≈ 42 min at peak17 min without traffic
Nampally station (Hyderabad Deccan)≈ 45 min at peak18 min without traffic
Abids≈ 46 min at peak19 min without traffic
Tellapur≈ 48 min at peak24 min without traffic
Koti≈ 49 min at peak20 min without traffic
Jeedimetla≈ 50 min at peak19 min without traffic
Shamshabad≈ 50 min at peak26 min without traffic
Kollur≈ 50 min at peak25 min without traffic
Secunderabad Junction≈ 54 min at peak19 min without traffic
Kacheguda station≈ 55 min at peak21 min without traffic
Kompally≈ 58 min at peak23 min without traffic
Dilsukhnagar≈ 61 min at peak25 min without traffic
Rajiv Gandhi International Airport≈ 68 min at peak31 min without traffic
LB Nagar≈ 70 min at peak29 min without traffic
Uppal≈ 70 min at peak27 min without traffic
Shamirpet (Genome Valley area)≈ 76 min at peak35 min without traffic
Adibatla (Aerospace SEZ area)≈ 83 min at peak44 min without traffic
Pocharam (Infosys campus area)≈ 97 min at peak40 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02200010981 · by Godrej Properties Limited · Phase IV, KPHB Colony, Kukatpally, 500085
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
13 items, none marked yet.
Ask the builder for
On recordRegistration is current until 05/10/2031
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 05/10/2031, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 2189/HMDA/SWBP/2026 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 430 of 1,436 homes booked (record last updated 27/10/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,588 to 3,261 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
2 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02200010981
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200010981 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 2 buildings, the tallest with 46 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 1% of work (record last updated 27/10/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 11 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
On recordA registered address is on record
Look at: that the site you are shown is at the registered address, and what stands on each side of it.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the registered address
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
2 of 16
421 of 16
413 of 16
400 of 16
392 of 15
381 of 16
371 of 16
363 of 16
353 of 16
344 of 16
336 of 16
324 of 16
317 of 16
305 of 16
297 of 15
288 of 16
278 of 16
2610 of 16
258 of 16
248 of 16
239 of 16
2210 of 16
2110 of 16
2010 of 16
1912 of 15
1812 of 16
1714 of 16
1614 of 16
1514 of 16
1411 of 16
1313 of 16
1214 of 16
1114 of 15
1016 of 16
913 of 16
810 of 16
70 of 16
60 of 16
50 of 16
40 of 16
30 of 12
20 of 12
11 of 5
TOWER - B46 floors with homes · 46 slabs filed · 4 basements · 714 homes, 134 booked
460 of 16
453 of 16
440 of 16
431 of 16
422 of 16
414 of 16
401 of 16
392 of 15
380 of 16
373 of 16
362 of 16
352 of 16
342 of 16
332 of 16
321 of 16
311 of 16
301 of 16
292 of 15
283 of 16
273 of 16
263 of 16
254 of 16
244 of 16
235 of 16
224 of 16
215 of 16
206 of 16
197 of 15
187 of 16
176 of 16
167 of 16
156 of 16
143 of 16
136 of 16
124 of 16
116 of 16
107 of 16
97 of 16
82 of 16
70 of 16
60 of 16
50 of 16
40 of 16
30 of 12
20 of 12
10 of 5
CLUB HOUSE8 slabs filed · 4 basements
The site: land, built-up area, survey number
Land
7.76 acres
Net of road and water setbacks
7.47 acres
Approved built-up area
30,72,865 sq ft
Buildings on the approved plan
3
Towers with homes
2
Highest floor with homes
46 floors
Lost to road widening or a lake's full tank level
12,482 sq ft
Survey number
1009
Site boundaries
east
30 Feet Wide Road or LIG (name withheld)
west
40 Feet Wide Road or GHMC Park MIG (name withheld)
north
Proposed 100 Feet wide Road
south
40 Feet Wide Road
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street LightingNot provided
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.