Filed update 26/03/2026 · read 20/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 20/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 20/11/2026.
Registration status
Registration number
P01100010751Filed with TG-RERA
Registered on
17/12/2025Filed with TG-RERA
Valid until
17/12/2030Filed with TG-RERA
Extensions
At least 1, the latest valid until 17/04/2031Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 20/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Spring Fields
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Patancheru≈ 28 min at peak10 min without traffic
Lingampally≈ 47 min at peak19 min without traffic
Tellapur≈ 49 min at peak20 min without traffic
All 42 places
Kollur≈ 52 min at peak21 min without traffic
Miyapur≈ 53 min at peak
Documents
Documents uploaded
50 of 55 document slotsFiled with TG-RERA
Document groups on the record
4 (10 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 65 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 20/11/2026.
Building table 10%
Building table 20%
Building table 30%
Building table 40%
Building table 50%
Building table 60%
Building table 70%
Building table 80%
Building table 90%
Building table 100%
Building table 110%
Building table 120%
Building table 130%
Building table 140%
Building table 150%
Building table 160%
Building table 170%
Building table 180%
Building table 190%
Building table 200%
Building table 210%
Building table 220%
Building table 230%
Building table 240%
Building table 250%
Building table 260%
Building table 270%
Building table 280%
Building table 290%
Building table 300%
Building table 310%
Building table 320%
Building table 330%
Building table 340%
Building table 350%
Building table 360%
Building table 370%
Building table 380%
Building table 390%
Building table 400%
Building table 410%
Building table 420%
Building table 430%
Building table 440%
Building table 450%
Building table 460%
Building table 470%
Building table 480%
Building table 490%
Building table 500%
Building table 510%
Building table 520%
Building table 530%
Building table 540%
Building table 550%
Building table 560%
Building table 570%
Building table 580%
Building table 590%
Building table 600%
Building table 610%
Building table 620%
Building table 630%
Building table 640%
Building table 650%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 65 building tables, no project figure filed.
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 121 other projects in Patancheru mandal with a booked count, 42 declare a larger share booked, 0 a smaller one and 79 the same, as last filed (records last updated 31/05/2019 to 17/11/2026).
130 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (65)
booked not booked, as declared.
VILLA NO 12 slabs filed · 1 basementVILLA NO 22 slabs filed · 1 basementVILLA NO 32 slabs filed · 1 basementVILLA NO 42 slabs filed · 1 basementVILLA NO 52 slabs filed · 1 basementVILLA NO 62 slabs filed · 1 basementVILLA NO 72 slabs filed · 1 basementVILLA NO 82 slabs filed · 1 basementVILLA NO 92 slabs filed · 1 basementVILLA NO 102 slabs filed · 1 basementVILLA NO 112 slabs filed · 1 basementVILLA NO 122 slabs filed · 1 basementVILLA NO 132 slabs filed · 1 basementVILLA NO 142 slabs filed · 1 basementVILLA NO 152 slabs filed · 1 basement
22 min without traffic
Kukatpally≈ 64 min at peak27 min without traffic
Financial District≈ 64 min at peak29 min without traffic
Kokapet≈ 64 min at peak30 min without traffic
Raidurg (Mindspace)≈ 65 min at peak28 min without traffic
Gachibowli≈ 65 min at peak25 min without traffic
Khajaguda≈ 65 min at peak31 min without traffic
DLF Cyber City, Gachibowli≈ 65 min at peak25 min without traffic
Nanakramguda (Waverock)≈ 66 min at peak31 min without traffic
Kondapur≈ 66 min at peak26 min without traffic
Balanagar≈ 69 min at peak29 min without traffic
HITEC City≈ 70 min at peak27 min without traffic
Narsingi≈ 70 min at peak32 min without traffic
Moosapet≈ 70 min at peak30 min without traffic
Manikonda≈ 75 min at peak34 min without traffic
Madhapur≈ 76 min at peak30 min without traffic
Shamirpet (Genome Valley area)≈ 78 min at peak37 min without traffic
Kompally≈ 78 min at peak34 min without traffic
Shamshabad≈ 80 min at peak41 min without traffic
Jubilee Hills≈ 82 min at peak32 min without traffic
Ameerpet≈ 82 min at peak35 min without traffic
Panjagutta≈ 82 min at peak35 min without traffic
Mehdipatnam≈ 84 min at peak36 min without traffic
Jeedimetla≈ 85 min at peak36 min without traffic
Lakdikapul≈ 89 min at peak38 min without traffic
Begumpet≈ 90 min at peak38 min without traffic
Banjara Hills≈ 92 min at peak36 min without traffic
Nampally station (Hyderabad Deccan)≈ 96 min at peak41 min without traffic
Abids≈ 97 min at peak42 min without traffic
Rajiv Gandhi International Airport≈ 98 min at peak47 min without traffic
Koti≈ 99 min at peak43 min without traffic
Secunderabad Junction≈ 102 min at peak40 min without traffic
Kacheguda station≈ 105 min at peak44 min without traffic
Pocharam (Infosys campus area)≈ 107 min at peak56 min without traffic
Dilsukhnagar≈ 111 min at peak48 min without traffic
Adibatla (Aerospace SEZ area)≈ 113 min at peak60 min without traffic
Uppal≈ 120 min at peak48 min without traffic
LB Nagar≈ 120 min at peak52 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P01100010751 · by Advent Estates · INOLE, PATANCHERU, 502319
Built by rule from this project's TG-RERA record, read by PropMap.ai on 20/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
On recordRegistration is current until 17/04/2031
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 17/04/2031, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 062426/SKP/LTU6/HMDA/28022024 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 0 of 130 homes booked (record last updated 26/03/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
22 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P01100010751
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P01100010751 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 65 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 6 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
VILLA NO 162 slabs filed · 1 basement
VILLA NO 172 slabs filed · 1 basement
VILLA NO 182 slabs filed · 1 basement
VILLA NO 192 slabs filed · 1 basement
VILLA NO 202 slabs filed · 1 basement
VILLA NO 212 slabs filed · 1 basement
VILLA NO 222 slabs filed · 1 basement
VILLA NO 232 slabs filed · 1 basement
VILLA NO 242 slabs filed · 1 basement
VILLA NO 252 slabs filed · 1 basement
VILLA NO 262 slabs filed · 1 basement
VILLA NO 272 slabs filed · 1 basement
VILLA NO 282 slabs filed · 1 basement
VILLA NO 292 slabs filed · 1 basement
VILLA NO 302 slabs filed · 1 basement
VILLA NO 312 slabs filed · 1 basement
VILLA NO 322 slabs filed · 1 basement
VILLA NO 332 slabs filed · 1 basement
VILLA NO 342 slabs filed · 1 basement
VILLA NO 352 slabs filed · 1 basement
VILLA NO 362 slabs filed · 1 basement
VILLA NO 372 slabs filed · 1 basement
VILLA NO 382 slabs filed · 1 basement
VILLA NO 392 slabs filed · 1 basement
VILLA NO 402 slabs filed · 1 basement
VILLA NO 412 slabs filed · 1 basement
VILLA NO 422 slabs filed · 1 basement
VILLA NO 432 slabs filed · 1 basement
VILLA NO 442 slabs filed · 1 basement
VILLA NO 452 slabs filed · 1 basement
VILLA NO 462 slabs filed · 1 basement
VILLA NO 472 slabs filed · 1 basement
VILLA NO 482 slabs filed · 1 basement
VILLA NO 492 slabs filed · 1 basement
VILLA NO 502 slabs filed · 1 basement
VILLA NO 512 slabs filed · 1 basement
VILLA NO 522 slabs filed · 1 basement
VILLA NO 532 slabs filed · 1 basement
VILLA NO 542 slabs filed · 1 basement
VILLA NO 552 slabs filed · 1 basement
VILLA NO 562 slabs filed · 1 basement
VILLA NO 572 slabs filed · 1 basement
VILLA NO 582 slabs filed · 1 basement
VILLA NO 592 slabs filed · 1 basement
VILLA NO 602 slabs filed · 1 basement
VILLA NO 612 slabs filed · 1 basement
VILLA NO 622 slabs filed · 1 basement
VILLA NO 632 slabs filed · 1 basement
VILLA NO 642 slabs filed · 1 basement
VILLA NO 653 slabs filed · 1 basement
The site: land, built-up area, survey number
Land
3.54 acres
Approved built-up area
88,932 sq ft
Buildings on the approved plan
65
Towers with homes
65
Lost to road widening or a lake's full tank level
None filed
Survey number
69/1,69/2 PART & 71 PART
Site boundaries
east
SURVEY NO 72 AND 81
west
SURVEY NO 69-2 PART 68 70 AND 71
north
ROAD WIDTH 12
south
SURVEY NO 83 AND 69-2 PART
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)Not provided
Storm Water DrainsNot provided
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.