Filed update 13/03/2025 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Plans
2 held
All 2 plans
Plans filed with TG-RERA 2
Filed with TG-RERA by the builder, as uploaded. People's names are covered. Not checked by PropMap.ai.
Registration status
Registration number
P02400003294Filed with TG-RERA
Registered on
25/08/2021Filed with TG-RERA
Valid until
14/06/2027, extended (first certificate to 14/02/2027)Filed with TG-RERA
Extensions
At least 1, the latest valid until 14/06/2027Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Luxury Park - 2
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Rajiv Gandhi International Airport≈ 23 min at peak8 min without traffic
Shamshabad≈ 24 min at peak8 min without traffic
Mehdipatnam≈ 44 min at peak19 min without traffic
All 42 places
Lakdikapul≈ 49 min at peak22 min without traffic
Adibatla (Aerospace SEZ area)
Documents
Documents uploaded
49 of 57 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
2
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 97 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 10%
Building table 20%
Building table 30%
Building table 40%
Building table 50%
Building table 60%
Building table 70%
Building table 80%
Building table 90%
Building table 100%
Building table 110%
Building table 120%
Building table 130%
Building table 140%
Building table 150%
Building table 160%
Building table 170%
Building table 180%
Building table 190%
Building table 200%
Building table 210%
Building table 220%
Building table 230%
Building table 240%
Building table 250%
Building table 260%
Building table 270%
Building table 280%
Building table 290%
Building table 300%
Building table 310%
Building table 320%
Building table 330%
Building table 340%
Building table 350%
Building table 360%
Building table 370%
Building table 380%
Building table 390%
Building table 400%
Building table 410%
Building table 420%
Building table 430%
Building table 440%
Building table 450%
Building table 460%
Building table 470%
Building table 480%
Building table 490%
Building table 500%
Building table 510%
Building table 520%
Building table 530%
Building table 540%
Building table 550%
Building table 560%
Building table 570%
Building table 580%
Building table 590%
Building table 600%
Building table 610%
Building table 620%
Building table 630%
Building table 640%
Building table 650%
Building table 660%
Building table 670%
Building table 680%
Building table 690%
Building table 700%
Building table 710%
Building table 720%
Building table 730%
Building table 740%
Building table 750%
Building table 760%
Building table 770%
Building table 780%
Building table 790%
Building table 800%
Building table 810%
Building table 820%
Building table 830%
Building table 840%
Building table 850%
Building table 860%
Building table 870%
Building table 880%
Building table 890%
Building table 900%
Building table 910%
Building table 920%
Building table 930%
Building table 940%
Building table 950%
Building table 960%
Building table 970%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 97 building tables, no project figure filed.
No change between PropMap.ai's reads of 05/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (0%).
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
The counts in this filing did not look believable, so PropMap.ai does not show them. Ask the builder for the numbers in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
The site: land, built-up area, survey number
Land
7.69 acres
Net of road and water setbacks
7.44 acres
Approved built-up area
1,97,247 sq ft
Buildings on the approved plan
97
Lost to road widening or a lake's full tank level
10,797 sq ft
Survey number
28,35,36,37,38
Site boundaries
east
26p
west
30M WIDE ROAD
north
39p
south
34p
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths100% declared
Water Supply5% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park5% declared
Street Lighting0% declared
Community Buildings30% declared
Treatment And Disposal Of Sewage And Sullage Water5% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station5% declared
Aggregate area of recreational Open Space0% declared
Declared by the builder, not inspected.
≈ 53 min at peak
23 min without traffic
Panjagutta≈ 54 min at peak24 min without traffic
Koti≈ 54 min at peak22 min without traffic
LB Nagar≈ 54 min at peak23 min without traffic
Nampally station (Hyderabad Deccan)≈ 54 min at peak21 min without traffic
Narsingi≈ 54 min at peak25 min without traffic
Banjara Hills≈ 55 min at peak24 min without traffic
Kokapet≈ 55 min at peak25 min without traffic
Abids≈ 56 min at peak22 min without traffic
Kacheguda station≈ 57 min at peak23 min without traffic
Raidurg (Mindspace)≈ 58 min at peak27 min without traffic
Khajaguda≈ 58 min at peak27 min without traffic
Gachibowli≈ 58 min at peak28 min without traffic
DLF Cyber City, Gachibowli≈ 58 min at peak28 min without traffic
Ameerpet≈ 58 min at peak26 min without traffic
Financial District≈ 58 min at peak26 min without traffic
Dilsukhnagar≈ 58 min at peak23 min without traffic
Kondapur≈ 61 min at peak29 min without traffic
Nanakramguda (Waverock)≈ 62 min at peak30 min without traffic
HITEC City≈ 62 min at peak28 min without traffic
Begumpet≈ 62 min at peak27 min without traffic
Manikonda≈ 65 min at peak27 min without traffic
Secunderabad Junction≈ 65 min at peak28 min without traffic
Moosapet≈ 67 min at peak30 min without traffic
Uppal≈ 67 min at peak29 min without traffic
Balanagar≈ 68 min at peak31 min without traffic
Jubilee Hills≈ 68 min at peak27 min without traffic
Madhapur≈ 69 min at peak28 min without traffic
Tellapur≈ 70 min at peak34 min without traffic
Kollur≈ 72 min at peak36 min without traffic
Kukatpally≈ 74 min at peak34 min without traffic
Miyapur≈ 77 min at peak34 min without traffic
Patancheru≈ 79 min at peak42 min without traffic
Lingampally≈ 79 min at peak36 min without traffic
Jeedimetla≈ 80 min at peak36 min without traffic
Pocharam (Infosys campus area)≈ 83 min at peak42 min without traffic
Kompally≈ 89 min at peak40 min without traffic
Shamirpet (Genome Valley area)≈ 97 min at peak50 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02400003294 · by Phoenix IT Spaces Pvt. Ltd. · MAMIDIPALLY, Balapur, 501218
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
9 items, none marked yet.
Ask the builder for
On recordRegistration is current until 14/06/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 14/06/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 000104/LO/Plg/HMDA/2 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
7 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02400003294
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400003294 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe builder declared 0% of work (record last updated 13/03/2025)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Not known · no source PropMap.ai holds gives this yet.
Floors with homesNot known
Not known · no source PropMap.ai holds gives this yet.
Home typesNot known
Not known · no source PropMap.ai holds gives this yet.
Home sizes (saleable)Not known
Not known · no source PropMap.ai holds gives this yet.
Map positionApproximate position
Placed at the filed pin of a similarly named project by the same builder · rerait.telangana.gov.in ↗ · read 11/11/2026
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.