Left blank in the filingwork declared by the builder, 3 building tables
Building table 110%
Building table 210%
Building table 310%
Filed update 02/11/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its , after a compliance review, with the sources searched and their dates.
Registration status
Registration number
P01100010545Filed with TG-RERA
Registered on
13/01/2026Filed with TG-RERA
Valid until
13/01/2031Filed with TG-RERA
Extensions
At least 1, the latest valid until 13/05/2031Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
kollur Village, Ramachandrapuram Mandal, Sangareddy District, KOLLUR, RC PURAM, 502300Filed with TG-RERA
Mandal, district
RC PURAM, SangareddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Kollur≈ 0 min at peak0 min without traffic
Tellapur≈ 3 min at peak1 min without traffic
Patancheru≈ 28 min at peak14 min without traffic
All 42 places
Financial District≈ 34 min at peak16 min without traffic
Documents
Documents uploaded
33 of 38 document slotsFiled with TG-RERA
Document groups on the record
4 (10 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 3 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 110%
Building table 210%
Building table 310%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 3 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (10%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 116 other projects in RC Puram mandal with a booked count, 60 declare a larger share booked, 0 a smaller one and 56 the same, as last filed (records last updated 13/05/2019 to 14/11/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
6
6
2,013 to 2,702 sq ft
3 BHK
571
571
2,013 to 2,895 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing. 7 other units are filed without a bedroom type, such as clubhouses or shops.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (3)
booked not booked, as declared.
BLOCK-A36 floors with homes · 43 slabs filed · 2 basements · 285 homes, 0 booked
360 of 8
350 of 8
340 of 8
330 of 8
320 of 7
310 of 8
Kokapet≈ 35 min at peak16 min without traffic
Raidurg (Mindspace)≈ 35 min at peak19 min without traffic
Gachibowli≈ 35 min at peak18 min without traffic
Khajaguda≈ 35 min at peak18 min without traffic
DLF Cyber City, Gachibowli≈ 35 min at peak18 min without traffic
Nanakramguda (Waverock)≈ 36 min at peak17 min without traffic
Kondapur≈ 38 min at peak20 min without traffic
HITEC City≈ 40 min at peak20 min without traffic
Narsingi≈ 40 min at peak17 min without traffic
Lingampally≈ 44 min at peak16 min without traffic
Manikonda≈ 46 min at peak21 min without traffic
Madhapur≈ 47 min at peak23 min without traffic
Shamshabad≈ 50 min at peak28 min without traffic
Jubilee Hills≈ 52 min at peak25 min without traffic
Miyapur≈ 52 min at peak22 min without traffic
Mehdipatnam≈ 55 min at peak26 min without traffic
Kukatpally≈ 59 min at peak27 min without traffic
Banjara Hills≈ 64 min at peak28 min without traffic
Lakdikapul≈ 64 min at peak30 min without traffic
Balanagar≈ 64 min at peak29 min without traffic
Moosapet≈ 65 min at peak30 min without traffic
Panjagutta≈ 66 min at peak29 min without traffic
Shamirpet (Genome Valley area)≈ 67 min at peak39 min without traffic
Kompally≈ 67 min at peak36 min without traffic
Rajiv Gandhi International Airport≈ 68 min at peak33 min without traffic
Ameerpet≈ 70 min at peak30 min without traffic
Nampally station (Hyderabad Deccan)≈ 70 min at peak32 min without traffic
Abids≈ 71 min at peak33 min without traffic
Jeedimetla≈ 74 min at peak38 min without traffic
Koti≈ 74 min at peak34 min without traffic
Begumpet≈ 74 min at peak32 min without traffic
Kacheguda station≈ 79 min at peak35 min without traffic
Secunderabad Junction≈ 80 min at peak36 min without traffic
Adibatla (Aerospace SEZ area)≈ 83 min at peak46 min without traffic
Dilsukhnagar≈ 86 min at peak38 min without traffic
LB Nagar≈ 92 min at peak42 min without traffic
Uppal≈ 95 min at peak42 min without traffic
Pocharam (Infosys campus area)≈ 95 min at peak55 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P01100010545 · by Vaishno Ventures · kollur Village, Ramachandrapuram Mandal, Sangareddy District, KOLLUR, RC PURAM, 502300
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
13 items, none marked yet.
Ask the builder for
On recordRegistration is current until 13/05/2031
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 13/05/2031, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 1443/HMDA/SWBP/2026 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 0 of 584 homes booked (record last updated 02/11/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (2,013 to 2,895 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
8 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P01100010545
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P01100010545 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 2 buildings, the tallest with 36 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 10% of work (record last updated 02/11/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 11 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
300 of 8
290 of 8
280 of 8
270 of 8
260 of 7
250 of 8
240 of 8
230 of 8
220 of 7
210 of 8
200 of 8
190 of 8
180 of 8
170 of 8
160 of 8
150 of 8
140 of 8
130 of 8
120 of 8
110 of 8
100 of 8
90 of 8
80 of 8
70 of 8
60 of 8
50 of 8
40 of 8
30 of 8
20 of 8
10 of 8
BLOCK-B36 floors with homes · 43 slabs filed · 2 basements · 292 homes, 0 booked
360 of 8
350 of 8
340 of 8
330 of 8
320 of 8
310 of 8
300 of 10
290 of 8
280 of 8
270 of 8
260 of 11
250 of 7
240 of 8
230 of 8
220 of 8
210 of 8
200 of 8
190 of 8
180 of 8
170 of 8
160 of 8
150 of 8
140 of 8
130 of 8
120 of 8
110 of 8
100 of 8
90 of 8
80 of 8
70 of 8
60 of 8
50 of 8
40 of 8
30 of 8
20 of 8
10 of 8
AMENITIES BLOCK CLUB HOUSE12 slabs filed · 2 basements
The site: land, built-up area, survey number
Land
3.76 acres
Approved built-up area
13,05,617 sq ft
Buildings on the approved plan
3
Towers with homes
2
Highest floor with homes
36 floors
Lost to road widening or a lake's full tank level
None filed
Survey number
188/AA
Site boundaries
east
OTHERS LAND
west
OTHERS LAND
north
ROAD
south
OTHERS LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving StationNot provided
Aggregate area of recreational Open SpaceNot provided
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.
Listed nearby within 2 km
2 km: about 6 min drive at peak. Nearest first.
Hospitalsnone within 2 km
No hospitals on record within 2 km. None on record within 5 km.