Filed update 04/06/2026 · read 20/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 20/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 20/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Registration status
Registration number
P02200010476Filed with TG-RERA
Registered on
30/12/2025Filed with TG-RERA
Valid until
29/12/2030Filed with TG-RERA
Extensions
At least 1, the latest valid until 29/04/2031Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 20/11/2026. The records compared above were read from 06/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
One Central Heights
It cannot know
price, availability, title, court cases or the site today.
OLD UPPAL, UPPAL KHALSA, Uppal, 500039Filed with TG-RERA
Mandal, district
Uppal, Medchal-MalkajgiriFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 4 km, and a few were over 5 km off.
Uppal≈ 8 min at peak4 min without traffic
LB Nagar≈ 22 min at peak10 min without traffic
Dilsukhnagar≈ 28 min at peak12 min without traffic
All 42 places
Kacheguda station≈ 30 min at peak13 min without traffic
Koti≈ 30 min at peak
Documents
Documents uploaded
29 of 33 document slotsFiled with TG-RERA
Document groups on the record
4 (11 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
1%Overall Percentage of Completion of the work done For the entire Building /Wing. Record last updated 04/06/2026; read from TG-RERA on 20/11/2026. One reading so far, so no change over time is shown. Of 220 other projects registered in 2025 with a declared work figure, 120 declare more, 96 less and 4 the same, as last filed (records last updated 14/02/2025 to 13/11/2026).
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: whole project (one table filed).
Task-by-task progress (10 tasks)
Excavation10%
Stilt Floor0%
X number of Podiums0%
X number of Basement(s) and Plinth0%
X number of Slabs of Super Structure0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 183 other projects in Uppal mandal with a booked count, 59 declare a larger share booked, 0 a smaller one and 124 the same, as last filed (records last updated 21/11/2018 to 26/10/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
57
57
1,152 to 1,838 sq ft
3 BHK
261
261
1,536 to 1,889 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing. 2 other units are filed without a bedroom type, such as clubhouses or shops.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (1)
booked not booked, as declared.
ONE CENTRAL HEIGHTS15 floors with homes · 18 slabs filed · 318 homes, 0 booked
150 of 22
140 of 22
130 of 22
12
14 min without traffic
Pocharam (Infosys campus area)≈ 30 min at peak14 min without traffic
Secunderabad Junction≈ 33 min at peak12 min without traffic
Abids≈ 35 min at peak16 min without traffic
Nampally station (Hyderabad Deccan)≈ 35 min at peak16 min without traffic
Lakdikapul≈ 37 min at peak17 min without traffic
Panjagutta≈ 44 min at peak19 min without traffic
Mehdipatnam≈ 46 min at peak20 min without traffic
Ameerpet≈ 49 min at peak20 min without traffic
Begumpet≈ 50 min at peak18 min without traffic
Banjara Hills≈ 50 min at peak21 min without traffic
Jeedimetla≈ 58 min at peak23 min without traffic
Moosapet≈ 58 min at peak24 min without traffic
Balanagar≈ 59 min at peak24 min without traffic
Shamirpet (Genome Valley area)≈ 59 min at peak32 min without traffic
Jubilee Hills≈ 64 min at peak26 min without traffic
Kukatpally≈ 65 min at peak27 min without traffic
Kompally≈ 66 min at peak26 min without traffic
Manikonda≈ 69 min at peak29 min without traffic
Shamshabad≈ 69 min at peak32 min without traffic
Madhapur≈ 72 min at peak28 min without traffic
Raidurg (Mindspace)≈ 72 min at peak29 min without traffic
Khajaguda≈ 74 min at peak30 min without traffic
Adibatla (Aerospace SEZ area)≈ 75 min at peak29 min without traffic
Miyapur≈ 76 min at peak32 min without traffic
HITEC City≈ 76 min at peak30 min without traffic
Gachibowli≈ 77 min at peak30 min without traffic
Narsingi≈ 78 min at peak32 min without traffic
Rajiv Gandhi International Airport≈ 78 min at peak34 min without traffic
DLF Cyber City, Gachibowli≈ 78 min at peak31 min without traffic
Financial District≈ 81 min at peak33 min without traffic
Kondapur≈ 81 min at peak32 min without traffic
Kokapet≈ 82 min at peak34 min without traffic
Nanakramguda (Waverock)≈ 87 min at peak36 min without traffic
Lingampally≈ 89 min at peak37 min without traffic
Tellapur≈ 97 min at peak44 min without traffic
Patancheru≈ 98 min at peak42 min without traffic
Kollur≈ 99 min at peak45 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02200010476 · by Desai Projects · OLD UPPAL, UPPAL KHALSA, Uppal, 500039
Built by rule from this project's TG-RERA record, read by PropMap.ai on 20/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
13 items, none marked yet.
Ask the builder for
On recordRegistration is current until 29/04/2031
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 29/04/2031, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 003480/GHMC/1685/LBN1/2024-BP is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 0 of 320 homes booked (record last updated 04/06/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,152 to 1,889 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
5 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02200010476
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200010476 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 1 building, the tallest with 15 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 1% of work (record last updated 04/06/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 5 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
0 of 22
110 of 22
100 of 22
90 of 22
80 of 22
70 of 22
60 of 22
50 of 22
40 of 22
30 of 22
20 of 16
10 of 16
The site: land, built-up area, survey number
Land
2.30 acres
Net of road and water setbacks
2.27 acres
Approved built-up area
6,94,032 sq ft
Buildings on the approved plan
1
Towers with homes
1
Highest floor with homes
15 floors
Lost to road widening or a lake's full tank level
1,308 sq ft
Survey number
588/1, 591/1
Site boundaries
east
36 MT WIDE EXISTING 36 MT WIDE PROPOSED ROAD
west
PART OF SY NOS 588 BY 1 591 BY 1
north
36 MT WIDE ROAD
south
36 MT WIDE EXISTING 36 MT WIDE PROPOSED ROAD
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & FootpathsNot provided
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/ParkNot provided
Street LightingNot provided
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.