Filed update 30/05/2025 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 05/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Navya Trident
It cannot know
price, availability, title, court cases or the site today.
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
90%Overall Percentage of Completion of the work done For the entire Building /Wing. Record last updated 30/05/2025; read from TG-RERA on 14/11/2026.No change since the read of 06/11/2026 in the registration dates, completion date or declared work. Of 492 other projects registered in 2023 with a declared work figure, 15 declare more, 448 less and 29 the same, as last filed (records last updated 09/06/2022 to 14/11/2026; 3 carry no date).
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: whole project (one table filed).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 352 other projects in Gandipet mandal with a booked count, 145 declare a larger share booked, 0 a smaller one and 207 the same, as last filed (records last updated 12/12/2018 to 23/11/2026).
5 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Location
Registered address
Manikonda Jagir, Manokonda Jagir, Gandipet, 500089Filed with TG-RERA
Mandal, district
Gandipet, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 4 km, and a few were over 5 km off.
Manikonda≈ 8 min at peak3 min without traffic
Financial District≈ 9 min at peak3 min without traffic
Narsingi≈ 10 min at peak4 min without traffic
All 42 places
Khajaguda≈ 11 min at peak4 min without traffic
Kokapet≈ 17 min at peak
Documents
Documents uploaded
18 of 25 document slotsFiled with TG-RERA
Document groups on the record
3 (8 documents)Filed with TG-RERA
Pictures and plans held
0
Stilt Floor100%
X number of Podiums0%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Project
Homes
Promised
Finished
NAVYA JUBILANT
10
19/12/2024
30/08/2022
NAVYA GREENS
5
11/02/2025
26/04/2021
NAVYA GARDENIA
5
08/08/2025
27/11/2021
NAVYA ELEGANCE
15
21/08/2026
20/04/2022
NAVYA CLASSIC A & B
65
22/03/2023
08/07/2022
MSR PLAZA A & B
50
15/04/2023
28/08/2022
Declared by the builder to TG-RERA, not checked against those projects.
Towers, floor by floor (1)
booked not booked, as declared.
NAVYA TRIDENT5 slabs filed · 2 basements
The site: land, built-up area, survey number
Land
0.74 acres
Net of road and water setbacks
0.56 acres
Approved built-up area
77,341 sq ft
Buildings on the approved plan
1
Towers with homes
1
Lost to road widening or a lake's full tank level
7,885 sq ft
Survey number
3
Site boundaries
east
Neighbours Land
west
(name withheld) and Proposed 80 Feet Wide Road
north
Neighbours Land and 30 Feet Wide Road
south
40 Feet Wide Road
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Storm Water DrainsNot provided
Green Strip/TOT LOT/Park0% declared
Street LightingNot provided
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Internal Roads & FootpathsNot provided
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Declared by the builder, not inspected.
6 min without traffic
Raidurg (Mindspace)≈ 20 min at peak7 min without traffic
Gachibowli≈ 20 min at peak8 min without traffic
DLF Cyber City, Gachibowli≈ 20 min at peak8 min without traffic
Nanakramguda (Waverock)≈ 23 min at peak8 min without traffic
Kondapur≈ 23 min at peak9 min without traffic
HITEC City≈ 25 min at peak9 min without traffic
Jubilee Hills≈ 30 min at peak10 min without traffic
Madhapur≈ 32 min at peak11 min without traffic
Mehdipatnam≈ 33 min at peak11 min without traffic
Tellapur≈ 37 min at peak16 min without traffic
Shamshabad≈ 39 min at peak19 min without traffic
Miyapur≈ 39 min at peak15 min without traffic
Kollur≈ 40 min at peak17 min without traffic
Banjara Hills≈ 40 min at peak13 min without traffic
Lingampally≈ 42 min at peak16 min without traffic
Lakdikapul≈ 42 min at peak16 min without traffic
Panjagutta≈ 42 min at peak14 min without traffic
Kukatpally≈ 44 min at peak16 min without traffic
Patancheru≈ 46 min at peak23 min without traffic
Ameerpet≈ 46 min at peak15 min without traffic
Nampally station (Hyderabad Deccan)≈ 48 min at peak17 min without traffic
Balanagar≈ 49 min at peak18 min without traffic
Abids≈ 50 min at peak18 min without traffic
Moosapet≈ 50 min at peak18 min without traffic
Begumpet≈ 51 min at peak17 min without traffic
Koti≈ 52 min at peak19 min without traffic
Rajiv Gandhi International Airport≈ 57 min at peak24 min without traffic
Kacheguda station≈ 58 min at peak21 min without traffic
Secunderabad Junction≈ 58 min at peak21 min without traffic
Dilsukhnagar≈ 64 min at peak24 min without traffic
Adibatla (Aerospace SEZ area)≈ 72 min at peak37 min without traffic
LB Nagar≈ 73 min at peak29 min without traffic
Jeedimetla≈ 73 min at peak27 min without traffic
Uppal≈ 73 min at peak28 min without traffic
Kompally≈ 82 min at peak31 min without traffic
Shamirpet (Genome Valley area)≈ 85 min at peak42 min without traffic
Pocharam (Infosys campus area)≈ 100 min at peak41 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
10 items, none marked yet.
Ask the builder for
On recordRegistration is current until 16/02/2028
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 16/02/2028, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordThe builder declared 0 of 5 homes booked (record last updated 30/05/2025)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
6 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02400006121
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400006121 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 1 building
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 90% of work (record last updated 30/05/2025)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 6 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 4 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.