Filed update 15/10/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Pictures and plans
1 held
All 1 pictures and plans
Pictures and plans 1
From the builder's website. Pictures may be artist's impressions.
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Muppas Melody
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Tellapur≈ 12 min at peak4 min without traffic
Kollur≈ 15 min at peak6 min without traffic
Patancheru≈ 37 min at peak17 min without traffic
All 42 places
Lingampally≈ 37 min at peak14 min without traffic
Kokapet≈ 42 min at peak
Documents
Documents uploaded
67 of 72 document slotsFiled with TG-RERA
Document groups on the record
4 (10 documents)Filed with TG-RERA
Pictures and plans held
1
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 7 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 1100%
Building table 2100%
Building table 3100%
Building table 4100%
Building table 597.1%
Building table 667%
Building table 767.1%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 7 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (90.2%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
Declared by the builder to TG-RERA, not checked against those projects.
Homes
Homes, total
1,056Filed with TG-RERA
Booked, as declared
704Filed with TG-RERA
Home types and sizes
2, 2.5, 3 BHK · 995 to 1,725 sq ftFiled with TG-RERA
Types, sizes, bookings and the cost calculator
704 of 1,056 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 116 other projects in RC Puram mandal with a booked count, 11 declare a larger share booked, 105 a smaller one and 0 the same, as last filed (records last updated 13/05/2019 to 14/11/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
303
105
995 to 1,010 sq ft
2.5 BHK
481
119
1,010 to 1,725 sq ft
3 BHK
272
128
1,400 to 1,725 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (7)
booked not booked, as declared.
TOWER - A17 floors with homes · 17 slabs filed · 1 basement · 170 homes, 142 booked
1710 of 10
163 of 10
156 of 10
14
15 min without traffic
Financial District≈ 42 min at peak15 min without traffic
Raidurg (Mindspace)≈ 43 min at peak18 min without traffic
Gachibowli≈ 43 min at peak17 min without traffic
Khajaguda≈ 43 min at peak17 min without traffic
DLF Cyber City, Gachibowli≈ 44 min at peak18 min without traffic
Nanakramguda (Waverock)≈ 44 min at peak16 min without traffic
Kondapur≈ 46 min at peak19 min without traffic
HITEC City≈ 48 min at peak20 min without traffic
Narsingi≈ 48 min at peak17 min without traffic
Miyapur≈ 50 min at peak19 min without traffic
Manikonda≈ 54 min at peak21 min without traffic
Madhapur≈ 55 min at peak22 min without traffic
Shamshabad≈ 58 min at peak27 min without traffic
Jubilee Hills≈ 60 min at peak24 min without traffic
Kukatpally≈ 61 min at peak24 min without traffic
Mehdipatnam≈ 63 min at peak25 min without traffic
Balanagar≈ 66 min at peak26 min without traffic
Moosapet≈ 67 min at peak27 min without traffic
Banjara Hills≈ 72 min at peak27 min without traffic
Lakdikapul≈ 72 min at peak30 min without traffic
Panjagutta≈ 74 min at peak28 min without traffic
Shamirpet (Genome Valley area)≈ 76 min at peak43 min without traffic
Kompally≈ 76 min at peak40 min without traffic
Rajiv Gandhi International Airport≈ 76 min at peak33 min without traffic
Ameerpet≈ 78 min at peak29 min without traffic
Nampally station (Hyderabad Deccan)≈ 78 min at peak31 min without traffic
Abids≈ 79 min at peak32 min without traffic
Koti≈ 82 min at peak33 min without traffic
Begumpet≈ 82 min at peak31 min without traffic
Jeedimetla≈ 83 min at peak37 min without traffic
Kacheguda station≈ 88 min at peak35 min without traffic
Secunderabad Junction≈ 88 min at peak35 min without traffic
Adibatla (Aerospace SEZ area)≈ 91 min at peak45 min without traffic
Dilsukhnagar≈ 94 min at peak38 min without traffic
LB Nagar≈ 101 min at peak42 min without traffic
Uppal≈ 103 min at peak42 min without traffic
Pocharam (Infosys campus area)≈ 104 min at peak55 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P01100002646 · by Muppa Projects India Pvt.Ltd · osmannagar, RC PURAM, 502032
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
11 items, none marked yet.
Ask the builder for
On recordRegistration is current until 30/12/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 30/12/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 035626/SKP/R1/U6/HMD is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 704 of 1,056 homes booked (record last updated 15/10/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (995 to 1,725 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
2 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P01100002646
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P01100002646 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 7 buildings, the tallest with 17 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
9 of 10
1310 of 10
1210 of 10
1110 of 10
1010 of 10
99 of 10
88 of 10
710 of 10
610 of 10
510 of 10
410 of 10
36 of 10
29 of 10
12 of 10
TOWER - B17 floors with homes · 17 slabs filed · 2 basements · 153 homes, 114 booked
179 of 9
167 of 9
151 of 9
148 of 9
139 of 9
128 of 9
118 of 9
104 of 9
99 of 9
89 of 9
79 of 9
68 of 9
59 of 9
49 of 9
34 of 9
22 of 9
11 of 9
TOWER - C17 floors with homes · 17 slabs filed · 2 basements · 153 homes, 119 booked
176 of 9
165 of 9
154 of 9
147 of 9
137 of 9
128 of 9
119 of 9
108 of 9
96 of 9
89 of 9
79 of 9
67 of 9
59 of 9
49 of 9
38 of 9
26 of 9
12 of 9
TOWER - D17 floors with homes · 17 slabs filed · 2 basements · 136 homes, 108 booked
172 of 8
167 of 8
158 of 8
146 of 8
138 of 8
124 of 8
118 of 8
108 of 8
98 of 8
87 of 8
78 of 8
68 of 8
57 of 8
48 of 8
35 of 8
24 of 8
12 of 8
TOWER - E17 floors with homes · 17 slabs filed · 2 basements · 138 homes, 83 booked
171 of 8
164 of 8
151 of 8
146 of 8
136 of 8
128 of 8
114 of 8
104 of 8
91 of 8
88 of 8
710 of 10
68 of 8
58 of 8
48 of 8
33 of 8
23 of 8
10 of 8
TOWER - F17 floors with homes · 17 slabs filed · 2 basements · 170 homes, 81 booked
171 of 10
165 of 10
151 of 10
146 of 10
134 of 10
126 of 10
116 of 10
109 of 10
91 of 10
87 of 10
77 of 10
64 of 10
59 of 10
49 of 10
35 of 10
21 of 10
10 of 10
TOWER - G17 floors with homes · 17 slabs filed · 2 basements · 136 homes, 57 booked
172 of 8
160 of 8
153 of 8
144 of 8
134 of 8
122 of 8
115 of 8
101 of 8
97 of 8
85 of 8
76 of 8
60 of 8
57 of 8
46 of 8
33 of 8
22 of 8
10 of 8
The site: land, built-up area, survey number
Land
8.32 acres
Net of road and water setbacks
8.00 acres
Approved built-up area
13,61,585 sq ft
Buildings on the approved plan
7
Towers with homes
7
Highest floor with homes
17 floors
Lost to road widening or a lake's full tank level
14,257 sq ft
Survey number
15/A(P), 18/A2, 18/E
Site boundaries
east
40 Feet Road
west
Part of Sy No 15 and Part Sy No 18
north
100 Feet Road
south
Part of Sy No 15 and Neighbors Land
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths94% declared
Water Supply95% declared
Sewerage (Chamber, Lines, Septic Tank , STP)100% declared
Storm Water Drains87% declared
Green Strip/TOT LOT/Park94% declared
Street Lighting95% declared
Community Buildings87% declared
Treatment And Disposal Of Sewage And Sullage Water90% declared
Solid Waste Management And Disposal87% declared
Water Conservation, Rain water Harvesting84% declared
Energy management74% declared
Fire Protection And Fire Safety Requirements75% declared
Electrical Meter Room, Sub-Station, Receiving Station96% declared
Aggregate area of recreational Open Space80% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.
Listed nearby within 2 km
2 km: about 11 min drive at peak. Nearest first.
Hospitalsnone within 2 km
No hospitals on record within 2 km. Nearest hospital: , about 4.6 km.