From the builder's website. Pictures may be artist's impressions.
Status, as filed
Left blank in the filingwork declared by the builder, 4 building tables
Building table 177.5%
Building table 275%
Building table 380.5%
Building table 457%
Filed update 05/01/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Pictures and plans
16 held
All 16 pictures and plans
Pictures and plans 16
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02400003991Filed with TG-RERA
Registered on
22/01/2022Filed with TG-RERA
Valid until
14/12/2027Filed with TG-RERA
Extensions
At least 1, the latest valid until 14/04/2028Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Ramky One Odyssey
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Narsingi, Serilingampally, 500075Filed with TG-RERA
Mandal, district
Serilingampally, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Kokapet≈ 5 min at peak2 min without traffic
Narsingi≈ 9 min at peak4 min without traffic
Financial District≈ 13 min at peak4 min without traffic
All 42 places
Manikonda≈ 20 min at peak7 min without traffic
Raidurg (Mindspace)≈ 24 min at peak
Documents
Documents uploaded
33 of 39 document slotsFiled with TG-RERA
Document groups on the record
3 (8 documents)Filed with TG-RERA
Pictures and plans held
16
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 4 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 177.5%
Building table 275%
Building table 380.5%
Building table 457%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 4 building tables, no project figure filed.
This filing's proposed completion date is 14/04/2028: of 8 other filings under the same TG-RERA promoter record, 6 have a later date, 2 an earlier one and 0 the same, as last filed (records last updated 15/07/2024 to 23/06/2026).
No change between PropMap.ai's reads of 12/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (72.5%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
Declared by the builder to TG-RERA, not checked against those projects.
Homes
Homes, total
783Filed with TG-RERA
Booked, as declared
51Filed with TG-RERA
Home types and sizes
3, 4 BHK · 1,750 to 3,650 sq ftFiled with TG-RERA
Types, sizes, bookings and the cost calculator
51 of 783 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 420 other projects in Serilingampally mandal with a booked count, 163 declare a larger share booked, 257 a smaller one and 0 the same, as last filed (records last updated 12/12/2018 to 13/11/2026).
Home types
Type
Homes
Not booked
Saleable size
3 BHK
675
631
1,750 to 2,575 sq ft
4 BHK
108
101
3,020 to 3,650 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Home types and sizes
Listed on the builder's website but not in the filing. Ask the builder which is right.
BLOCK B36 floors with homes · 37 slabs filed · 3 basements · 285 homes, 19 booked
360 of 8
350 of 7
340 of 8
33
10 min without traffic
Khajaguda≈ 24 min at peak8 min without traffic
Gachibowli≈ 24 min at peak10 min without traffic
DLF Cyber City, Gachibowli≈ 24 min at peak9 min without traffic
Nanakramguda (Waverock)≈ 24 min at peak9 min without traffic
Kondapur≈ 27 min at peak10 min without traffic
HITEC City≈ 28 min at peak11 min without traffic
Shamshabad≈ 30 min at peak16 min without traffic
Tellapur≈ 31 min at peak14 min without traffic
Kollur≈ 33 min at peak16 min without traffic
Mehdipatnam≈ 34 min at peak13 min without traffic
Madhapur≈ 35 min at peak14 min without traffic
Patancheru≈ 40 min at peak22 min without traffic
Jubilee Hills≈ 41 min at peak15 min without traffic
Lakdikapul≈ 43 min at peak17 min without traffic
Miyapur≈ 43 min at peak16 min without traffic
Lingampally≈ 46 min at peak17 min without traffic
Panjagutta≈ 47 min at peak18 min without traffic
Rajiv Gandhi International Airport≈ 48 min at peak22 min without traffic
Kukatpally≈ 48 min at peak18 min without traffic
Banjara Hills≈ 48 min at peak18 min without traffic
Nampally station (Hyderabad Deccan)≈ 48 min at peak18 min without traffic
Abids≈ 50 min at peak20 min without traffic
Ameerpet≈ 52 min at peak20 min without traffic
Balanagar≈ 52 min at peak20 min without traffic
Koti≈ 53 min at peak21 min without traffic
Moosapet≈ 54 min at peak21 min without traffic
Begumpet≈ 56 min at peak22 min without traffic
Kacheguda station≈ 58 min at peak22 min without traffic
Secunderabad Junction≈ 59 min at peak23 min without traffic
Adibatla (Aerospace SEZ area)≈ 63 min at peak34 min without traffic
Dilsukhnagar≈ 65 min at peak24 min without traffic
LB Nagar≈ 72 min at peak28 min without traffic
Jeedimetla≈ 74 min at peak31 min without traffic
Uppal≈ 74 min at peak29 min without traffic
Shamirpet (Genome Valley area)≈ 79 min at peak45 min without traffic
Kompally≈ 79 min at peak35 min without traffic
Pocharam (Infosys campus area)≈ 93 min at peak41 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02400003991 · by Ramky Estates and Farms LTD · Narsingi, Serilingampally, 500075
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 14/04/2028
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 14/04/2028, when the registration ends?” See the registration dates
Asked SeenDate: Note:
An approval paper is filed on TG-RERA; its number is not stated
Ask for: the approval number, and the approved plan that carries it.Question: “What is the approval number, and does the plan show my tower and my floor?” See approvals
Asked SeenDate: Note:
2 mortgage deeds are filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 51 of 783 homes booked (record last updated 05/01/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,750 to 3,650 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
1 title file is uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02400003991
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400003991 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 3 buildings, the tallest with 36 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
1 of 8
320 of 8
310 of 8
300 of 8
290 of 8
280 of 8
270 of 8
260 of 7
250 of 8
242 of 8
231 of 8
220 of 8
210 of 8
201 of 8
190 of 8
180 of 7
170 of 8
160 of 8
150 of 8
140 of 8
130 of 8
120 of 8
110 of 8
101 of 8
91 of 8
81 of 8
71 of 8
62 of 8
50 of 8
42 of 8
30 of 8
20 of 8
16 of 8
BLOCK A36 floors with homes · 37 slabs filed · 3 basements · 249 homes, 24 booked
360 of 7
350 of 6
340 of 7
330 of 7
320 of 7
310 of 7
300 of 7
290 of 7
281 of 7
270 of 7
261 of 6
251 of 7
241 of 7
231 of 7
220 of 7
211 of 7
201 of 7
191 of 7
181 of 7
170 of 6
161 of 7
151 of 7
142 of 7
131 of 7
121 of 7
111 of 7
101 of 7
90 of 7
80 of 7
70 of 7
61 of 7
51 of 7
40 of 7
30 of 7
20 of 7
15 of 7
BLOCK C36 floors with homes · 37 slabs filed · 3 basements · 249 homes, 8 booked
360 of 7
350 of 6
340 of 7
330 of 7
320 of 7
310 of 7
300 of 7
290 of 7
280 of 7
270 of 7
260 of 6
250 of 7
240 of 7
230 of 7
220 of 7
210 of 7
200 of 7
190 of 7
180 of 7
170 of 6
160 of 7
150 of 7
140 of 7
130 of 7
120 of 7
110 of 7
100 of 7
95 of 7
80 of 7
70 of 7
60 of 7
50 of 7
40 of 7
30 of 7
20 of 7
13 of 7
AMENITIES BLOCK7 slabs filed · 3 basements
The site: land, built-up area, survey number
Land
6.00 acres
Net of road and water setbacks
5.30 acres
Approved built-up area
16,73,267 sq ft
Buildings on the approved plan
4
Towers with homes
3
Highest floor with homes
36 floors
Lost to road widening or a lake's full tank level
30,405 sq ft
Survey number
176/P & 179/P
Site boundaries
east
12M Wide Road
west
12
north
36M Wide road
south
Neighbours land
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open Space0% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.
Listed nearby within 2 km
2 km: about 7 min drive at peak. Nearest first.
Hospitalsnone within 2 km
No hospitals on record within 2 km. Nearest hospital: , about 2.2 km.