From the builder's website. Pictures may be artist's impressions.
Status, as filed
Not present in the filingwork declared by the builder
Filed update 07/03/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Pictures and plans
11 held
All 11 pictures and plans
Pictures and plans 11
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P01100010659Filed with TG-RERA
Registered on
27/11/2025Filed with TG-RERA
Valid until
27/11/2028Filed with TG-RERA
Extensions
At least 1, the latest valid until 27/03/2029Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Sark Prime LaMagnolia
It cannot know
price, availability, title, court cases or the site today.
Nandigama 1, NANDIGAON, PATANCHERU, 502300Filed with TG-RERA
Mandal, district
PATANCHERU, SangareddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Patancheru≈ 28 min at peak10 min without traffic
Tellapur≈ 40 min at peak13 min without traffic
Kollur≈ 43 min at peak15 min without traffic
All 42 places
Lingampally≈ 46 min at peak18 min without traffic
Miyapur≈ 52 min at peak
Documents
Documents uploaded
35 of 40 document slotsFiled with TG-RERA
Document groups on the record
4 (10 documents)Filed with TG-RERA
Pictures and plans held
11
Projects PropMap.ai lists, filed on TG-RERA under this name
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA, and booking figures may lag.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Financial District≈ 56 min at peak23 min without traffic
Kokapet≈ 56 min at peak24 min without traffic
Raidurg (Mindspace)≈ 56 min at peak26 min without traffic
Gachibowli≈ 56 min at peak24 min without traffic
Khajaguda≈ 56 min at peak25 min without traffic
DLF Cyber City, Gachibowli≈ 56 min at peak25 min without traffic
Nanakramguda (Waverock)≈ 58 min at peak25 min without traffic
Kondapur≈ 60 min at peak25 min without traffic
HITEC City≈ 61 min at peak27 min without traffic
Narsingi≈ 62 min at peak26 min without traffic
Kukatpally≈ 63 min at peak26 min without traffic
Manikonda≈ 67 min at peak29 min without traffic
Balanagar≈ 68 min at peak28 min without traffic
Madhapur≈ 68 min at peak29 min without traffic
Moosapet≈ 69 min at peak29 min without traffic
Shamirpet (Genome Valley area)≈ 71 min at peak38 min without traffic
Kompally≈ 71 min at peak35 min without traffic
Shamshabad≈ 72 min at peak35 min without traffic
Jubilee Hills≈ 73 min at peak31 min without traffic
Mehdipatnam≈ 76 min at peak33 min without traffic
Jeedimetla≈ 78 min at peak36 min without traffic
Ameerpet≈ 81 min at peak34 min without traffic
Panjagutta≈ 82 min at peak35 min without traffic
Banjara Hills≈ 85 min at peak35 min without traffic
Lakdikapul≈ 85 min at peak38 min without traffic
Begumpet≈ 89 min at peak37 min without traffic
Rajiv Gandhi International Airport≈ 90 min at peak41 min without traffic
Nampally station (Hyderabad Deccan)≈ 91 min at peak39 min without traffic
Abids≈ 92 min at peak40 min without traffic
Koti≈ 95 min at peak41 min without traffic
Pocharam (Infosys campus area)≈ 99 min at peak56 min without traffic
Kacheguda station≈ 101 min at peak43 min without traffic
Secunderabad Junction≈ 101 min at peak40 min without traffic
Adibatla (Aerospace SEZ area)≈ 104 min at peak53 min without traffic
Dilsukhnagar≈ 107 min at peak46 min without traffic
Uppal≈ 112 min at peak47 min without traffic
LB Nagar≈ 114 min at peak51 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P01100010659 · by Sark Projects Housing LLP and Others · Nandigama 1, NANDIGAON, PATANCHERU, 502300
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
On recordRegistration is current until 27/03/2029
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 27/03/2029, when the registration ends?” See the registration dates
Asked SeenDate: Note:
2 mortgage deeds are filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
12 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (4)
On recordRERA number on record: P01100010659
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P01100010659 the number on everything you give me?”
Asked SeenDate: Note:
The filing lists 10 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.