From the builder's website. Pictures may be artist's impressions.
Status, as filed
Left blank in the filingwork declared by the builder, 6 building tables
Building table 1100%
Building table 2100%
Building table 3100%
Building table 4100%
Building table 5100%
Building table 6100%
Filed update 15/07/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Pictures and plans
9 held
All 9 pictures and plans
Pictures and plans 9
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02500004515Filed with TG-RERA
Registered on
14/05/2022Filed with TG-RERA
Valid until
31/12/2027Filed with TG-RERA
Extensions
At least 1, the latest valid until 30/04/2028Filed with TG-RERA
Completion date, as first filed
30/04/2028Filed with TG-RERA
Revised completion date, as filed
Not present in the filing
Status, as declared
New ProjectFiled with TG-RERA
Project type
Mixed Development (Residential & Commercial)Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Candeur Crescent
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Progress
Declared progress
Left blank in the filing
Last updated on TG-RERA
15/07/2026Filed with TG-RERA
Actual completion
Not present in the filing
Occupancy certificate
Not present in the filing
Location
Registered address
Serilingampally, 500019Filed with TG-RERA
Mandal, district
HyderabadFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, taking Hyderabad, Ranga Reddy and Medchal as one area, not the site itself. In our check 4 in 5 such positions were within about 3 km, and some were over 5 km off.
Lingampally≈ 11 min at peak4 min without traffic
Miyapur≈ 23 min at peak9 min without traffic
Gachibowli≈ 25 min at peak8 min without traffic
All 42 places
Patancheru≈ 26 min at peak10 min without traffic
DLF Cyber City, Gachibowli
Documents
Documents uploaded
68 of 73 document slotsFiled with TG-RERA
Document groups on the record
3 (9 documents)Filed with TG-RERA
Pictures and plans held
9
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 6 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 1100%
Building table 2100%
Building table 3100%
Building table 4100%
Building table 5100%
Building table 6100%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 6 building tables, no project figure filed.
No change between PropMap.ai's reads of 04/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (100%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
The counts in this filing did not look believable, so PropMap.ai does not show them. Ask the builder for the numbers in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Home types and sizes
2.5 BHK
3 BHK
Towers
5
Floors
50
Home sizes
1333-2656 sft
Builder's site says · candeur.in ↗ · read 13/11/2026
The site: land, built-up area, survey number
Land
5.50 acres
Approved built-up area
32,95,914 sq ft
Buildings on the approved plan
6
Lost to road widening or a lake's full tank level
None filed
Survey number
104,106 & 107/1
Site boundaries
east
WIDE ROAD
west
OTHERS LAND
north
OTHERS LAND
south
OTHERS LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths100% declared
Water Supply100% declared
Sewerage (Chamber, Lines, Septic Tank , STP)100% declared
Storm Water Drains100% declared
Green Strip/TOT LOT/Park100% declared
Street Lighting100% declared
Community Buildings100% declared
Treatment And Disposal Of Sewage And Sullage Water100% declared
Solid Waste Management And Disposal100% declared
Water Conservation, Rain water Harvesting100% declared
Energy management100% declared
Fire Protection And Fire Safety Requirements100% declared
Electrical Meter Room, Sub-Station, Receiving Station100% declared
Aggregate area of recreational Open Space100% declared
Declared by the builder, not inspected.
Amenities (11)
basketball court
clubhouse
gym
kids play area
landscaped garden
power backup
spa
swimming pool
tennis court
theatre
yoga
Builder's site says · candeur.in ↗ · read 13/11/2026
≈ 26 min at peak
8 min without traffic
Kondapur≈ 31 min at peak10 min without traffic
Kukatpally≈ 34 min at peak14 min without traffic
Raidurg (Mindspace)≈ 35 min at peak12 min without traffic
Nanakramguda (Waverock)≈ 35 min at peak13 min without traffic
Tellapur≈ 35 min at peak13 min without traffic
HITEC City≈ 35 min at peak11 min without traffic
Khajaguda≈ 37 min at peak14 min without traffic
Financial District≈ 38 min at peak14 min without traffic
Kollur≈ 38 min at peak14 min without traffic
Balanagar≈ 39 min at peak16 min without traffic
Moosapet≈ 40 min at peak17 min without traffic
Madhapur≈ 43 min at peak14 min without traffic
Narsingi≈ 44 min at peak17 min without traffic
Kokapet≈ 46 min at peak17 min without traffic
Manikonda≈ 46 min at peak17 min without traffic
Jubilee Hills≈ 48 min at peak16 min without traffic
Ameerpet≈ 52 min at peak22 min without traffic
Panjagutta≈ 53 min at peak20 min without traffic
Mehdipatnam≈ 56 min at peak19 min without traffic
Shamshabad≈ 59 min at peak28 min without traffic
Lakdikapul≈ 59 min at peak23 min without traffic
Banjara Hills≈ 60 min at peak20 min without traffic
Begumpet≈ 60 min at peak23 min without traffic
Nampally station (Hyderabad Deccan)≈ 66 min at peak24 min without traffic
Abids≈ 67 min at peak26 min without traffic
Jeedimetla≈ 68 min at peak27 min without traffic
Koti≈ 69 min at peak27 min without traffic
Secunderabad Junction≈ 72 min at peak28 min without traffic
Kacheguda station≈ 75 min at peak28 min without traffic
Kompally≈ 76 min at peak31 min without traffic
Rajiv Gandhi International Airport≈ 77 min at peak33 min without traffic
Dilsukhnagar≈ 81 min at peak32 min without traffic
Shamirpet (Genome Valley area)≈ 81 min at peak38 min without traffic
LB Nagar≈ 90 min at peak36 min without traffic
Uppal≈ 90 min at peak35 min without traffic
Adibatla (Aerospace SEZ area)≈ 92 min at peak46 min without traffic
Pocharam (Infosys campus area)≈ 110 min at peak48 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02500004515 · by Candeur Developers &Builders · Serilingampally, 500019
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
8 items, none marked yet.
Ask the builder for
On recordRegistration is current until 30/04/2028
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 30/04/2028, when the registration ends?” See the registration dates
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
6 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02500004515
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02500004515 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe builder declared 100% of work (record last updated 15/07/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Approximate position: placed from the registered address, taking Hyderabad, Ranga Reddy and Medchal as one area, not the site itself. In our check 4 in 5 such positions were within about 3 km, and some were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.
Listed nearby within 2 km
2 km: about 7 to 11 min drive at peak. Nearest first.