Left blank in the filingwork declared by the builder, 4 building tables
Building table 16%
Building table 220%
Building table 34%
Building table 414%
Filed update 13/07/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Registration status
Registration number
P02200006939Filed with TG-RERA
Registered on
11/09/2023Filed with TG-RERA
Valid until
18/03/2028Filed with TG-RERA
Extensions
At least 1, the latest valid until 18/07/2028Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Tiara
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Narsapur Road, Bowrampet, Dundigal Gandimaisamma, 500043Filed with TG-RERA
Mandal, district
Dundigal Gandimaisamma, Medchal-MalkajgiriFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Kukatpally≈ 35 min at peak13 min without traffic
Patancheru≈ 38 min at peak19 min without traffic
Balanagar≈ 40 min at peak15 min without traffic
All 42 places
Moosapet≈ 41 min at peak16 min without traffic
Miyapur
Documents
Documents uploaded
111 of 117 document slotsFiled with TG-RERA
Document groups on the record
4 (8 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 4 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 16%
Building table 220%
Building table 34%
Building table 414%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 4 building tables, no project figure filed.
No change between PropMap.ai's reads of 11/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (11%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 170 other projects in Dundigal Gandimaisamma mandal with a booked count, 39 declare a larger share booked, 131 a smaller one and 0 the same, as last filed (records last updated 14/12/2018 to 13/11/2026; 1 carries no date).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
262
191
Not clear in the filing
3 BHK
984
830
Not clear in the filing
3.5 BHK
74
56
Not clear in the filing
Saleable area, not carpet area. Ask for the carpet area in writing. Sizes the filing does not make clear are left out. 25 other units are filed without a bedroom type, such as clubhouses or shops.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (4)
booked not booked, as declared.
TOWER - A19 floors with homes · 19 slabs filed · 3 basements · 188 homes, 36 booked
190 of 9
180 of 9
170 of 11
160 of 11
155 of 11
≈ 42 min at peak
15 min without traffic
Jeedimetla≈ 42 min at peak15 min without traffic
Kompally≈ 43 min at peak14 min without traffic
Tellapur≈ 45 min at peak23 min without traffic
Shamirpet (Genome Valley area)≈ 46 min at peak23 min without traffic
Kollur≈ 48 min at peak24 min without traffic
HITEC City≈ 50 min at peak18 min without traffic
Ameerpet≈ 54 min at peak19 min without traffic
Panjagutta≈ 54 min at peak21 min without traffic
Lingampally≈ 54 min at peak20 min without traffic
Raidurg (Mindspace)≈ 54 min at peak19 min without traffic
Kondapur≈ 57 min at peak20 min without traffic
Madhapur≈ 58 min at peak20 min without traffic
Begumpet≈ 60 min at peak21 min without traffic
Financial District≈ 60 min at peak26 min without traffic
Lakdikapul≈ 60 min at peak24 min without traffic
Kokapet≈ 61 min at peak29 min without traffic
Gachibowli≈ 61 min at peak23 min without traffic
Khajaguda≈ 61 min at peak24 min without traffic
DLF Cyber City, Gachibowli≈ 61 min at peak22 min without traffic
Nanakramguda (Waverock)≈ 62 min at peak29 min without traffic
Jubilee Hills≈ 63 min at peak22 min without traffic
Banjara Hills≈ 63 min at peak24 min without traffic
Narsingi≈ 66 min at peak28 min without traffic
Nampally station (Hyderabad Deccan)≈ 67 min at peak27 min without traffic
Abids≈ 68 min at peak27 min without traffic
Secunderabad Junction≈ 68 min at peak23 min without traffic
Mehdipatnam≈ 69 min at peak27 min without traffic
Koti≈ 70 min at peak28 min without traffic
Manikonda≈ 72 min at peak26 min without traffic
Pocharam (Infosys campus area)≈ 74 min at peak42 min without traffic
Kacheguda station≈ 76 min at peak29 min without traffic
Shamshabad≈ 76 min at peak39 min without traffic
Dilsukhnagar≈ 82 min at peak33 min without traffic
Uppal≈ 87 min at peak31 min without traffic
LB Nagar≈ 91 min at peak37 min without traffic
Rajiv Gandhi International Airport≈ 94 min at peak45 min without traffic
Adibatla (Aerospace SEZ area)≈ 103 min at peak53 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 18/07/2028
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 18/07/2028, when the registration ends?” See the registration dates
Asked SeenDate: Note:
An approval paper is filed on TG-RERA; its number is not stated
Ask for: the approval number, and the approved plan that carries it.Question: “What is the approval number, and does the plan show my tower and my floor?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 246 of 1,345 homes booked (record last updated 13/07/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
The filing gives no home sizes
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
24 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02200006939
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200006939 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 4 buildings, the tallest with 19 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 11% of work (record last updated 13/07/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
14
1 of 11
132 of 9
122 of 11
113 of 6
105 of 11
96 of 11
83 of 11
73 of 11
64 of 11
51 of 11
40 of 11
31 of 11
20 of 11
10 of 1
TOWER - C19 floors with homes · 19 slabs filed · 3 basements · 303 homes, 52 booked
190 of 19
180 of 14
170 of 16
160 of 16
154 of 16
142 of 16
132 of 16
124 of 16
115 of 16
106 of 16
96 of 16
83 of 16
74 of 16
64 of 16
53 of 16
46 of 16
33 of 16
20 of 16
10 of 14
TOWER - D19 floors with homes · 19 slabs filed · 3 basements · 510 homes, 66 booked
190 of 24
180 of 24
170 of 26
160 of 26
1513 of 23
1410 of 26
133 of 26
122 of 11
111 of 26
105 of 26
94 of 26
810 of 26
77 of 26
66 of 26
54 of 26
40 of 26
31 of 26
20 of 71
10 of 19
TOWER - B19 floors with homes · 19 slabs filed · 3 basements · 319 homes, 89 booked
190 of 15
180 of 15
170 of 17
162 of 17
1510 of 17
146 of 17
134 of 17
129 of 17
1112 of 17
109 of 17
98 of 17
86 of 17
77 of 17
68 of 17
56 of 17
42 of 19
30 of 17
20 of 17
10 of 15
The site: land, built-up area, survey number
Land
9.59 acres
Net of road and water setbacks
9.42 acres
Approved built-up area
23,18,200 sq ft
Buildings on the approved plan
4
Towers with homes
4
Highest floor with homes
19 floors
Lost to road widening or a lake's full tank level
7,442 sq ft
Survey number
433, 436, 437
Site boundaries
east
EXISTING ROAD
west
SURVEY NO 461
north
SURVEY NO 463
south
SURVEY NO 437 PART
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & FootpathsNot stated
Water SupplyNot stated
Sewerage (Chamber, Lines, Septic Tank , STP)Not stated
Storm Water DrainsNot stated
Green Strip/TOT LOT/ParkNot stated
Street LightingNot stated
Community BuildingsNot stated
Treatment And Disposal Of Sewage And Sullage WaterNot stated
Solid Waste Management And DisposalNot stated
Water Conservation, Rain water HarvestingNot stated
Energy managementNot stated
Fire Protection And Fire Safety RequirementsNot stated
Electrical Meter Room, Sub-Station, Receiving StationNot stated
Aggregate area of recreational Open SpaceNot stated
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.