Filed update 13/01/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Registration status
Registration number
P02400010507Filed with TG-RERA
Registered on
05/08/2023Filed with TG-RERA
Valid until
05/08/2029Filed with TG-RERA
Extensions
At least 1, the latest valid until 05/12/2029Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Keerthi Riverfront
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Near Vidhya Shishu Mandir, Hyderguda, Rajendranagar, 500048Filed with TG-RERA
Mandal, district
Rajendranagar, Ranga ReddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Mehdipatnam≈ 16 min at peak7 min without traffic
Lakdikapul≈ 21 min at peak11 min without traffic
Panjagutta≈ 25 min at peak12 min without traffic
All 42 places
Banjara Hills≈ 26 min at peak12 min without traffic
Nampally station (Hyderabad Deccan)
Documents
Documents uploaded
21 of 27 document slotsFiled with TG-RERA
Document groups on the record
4 (9 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 29 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 10%
Building table 20%
Building table 30%
Building table 40%
Building table 50%
Building table 60%
Building table 70%
Building table 80%
Building table 90%
Building table 100%
Building table 110%
Building table 120%
Building table 130%
Building table 140%
Building table 150%
Building table 160%
Building table 170%
Building table 180%
Building table 190%
Building table 200%
Building table 210%
Building table 220%
Building table 230%
Building table 240%
Building table 250%
Building table 260%
Building table 270%
Building table 280%
Building table 290%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 29 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (0%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 84 other projects in Rajendranagar mandal with a booked count, 23 declare a larger share booked, 0 a smaller one and 61 the same, as last filed (records last updated 17/12/2018 to 11/11/2026).
31 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (29)
booked not booked, as declared.
VILLA NO 23 slabs filed · 1 basementVilla no 13 slabs filed · 1 basementVilla no 33 slabs filed · 1 basementVilla no 43 slabs filed · 1 basementVilla no 53 slabs filed · 1 basementVilla no 63 slabs filed · 1 basementVilla no 73 slabs filed · 1 basementVilla no 83 slabs filed · 1 basementVilla no 93 slabs filed · 1 basementVilla no 103 slabs filed · 1 basementVilla no 113 slabs filed · 1 basementVilla no 123 slabs filed · 1 basementVilla no 133 slabs filed · 1 basementVilla no 143 slabs filed · 1 basementVilla no 153 slabs filed · 1 basement
≈ 27 min at peak
12 min without traffic
Abids≈ 28 min at peak14 min without traffic
Ameerpet≈ 30 min at peak14 min without traffic
Narsingi≈ 30 min at peak11 min without traffic
Koti≈ 31 min at peak14 min without traffic
Financial District≈ 34 min at peak12 min without traffic
Begumpet≈ 34 min at peak16 min without traffic
Kokapet≈ 35 min at peak13 min without traffic
Manikonda≈ 36 min at peak14 min without traffic
Shamshabad≈ 36 min at peak18 min without traffic
Kacheguda station≈ 37 min at peak15 min without traffic
Secunderabad Junction≈ 37 min at peak17 min without traffic
Raidurg (Mindspace)≈ 38 min at peak15 min without traffic
Khajaguda≈ 38 min at peak16 min without traffic
Gachibowli≈ 38 min at peak16 min without traffic
DLF Cyber City, Gachibowli≈ 38 min at peak17 min without traffic
Moosapet≈ 39 min at peak18 min without traffic
Balanagar≈ 40 min at peak19 min without traffic
Jubilee Hills≈ 40 min at peak14 min without traffic
Kondapur≈ 41 min at peak18 min without traffic
Nanakramguda (Waverock)≈ 42 min at peak17 min without traffic
HITEC City≈ 42 min at peak16 min without traffic
Dilsukhnagar≈ 42 min at peak17 min without traffic
Madhapur≈ 46 min at peak16 min without traffic
Kukatpally≈ 46 min at peak22 min without traffic
Tellapur≈ 50 min at peak23 min without traffic
LB Nagar≈ 51 min at peak21 min without traffic
Uppal≈ 52 min at peak22 min without traffic
Jeedimetla≈ 52 min at peak25 min without traffic
Kollur≈ 52 min at peak24 min without traffic
Miyapur≈ 57 min at peak23 min without traffic
Rajiv Gandhi International Airport≈ 58 min at peak25 min without traffic
Patancheru≈ 59 min at peak31 min without traffic
Lingampally≈ 59 min at peak24 min without traffic
Kompally≈ 61 min at peak29 min without traffic
Adibatla (Aerospace SEZ area)≈ 73 min at peak35 min without traffic
Pocharam (Infosys campus area)≈ 78 min at peak34 min without traffic
Shamirpet (Genome Valley area)≈ 92 min at peak39 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02400010507 · by Keerthi Estates Private Limited · Near Vidhya Shishu Mandir, Hyderguda, Rajendranagar, 500048
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 05/12/2029
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 05/12/2029, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 5881/GHMC/CHR/2023-LO is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
1 mortgage deed is filed on TG-RERA
Ask for: written confirmation of whether the flat offered is under a mortgage, and the paper that releases it.Question: “Is my flat covered by a mortgage on file? What releases it, and when?” See the filed papers
Asked SeenDate: Note:
On recordThe builder declared 0 of 31 homes booked (record last updated 13/01/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
10 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02400010507
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400010507 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 28 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 0% of work (record last updated 13/01/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Villa no 163 slabs filed · 1 basement
Villa no 173 slabs filed · 1 basement
Villa no 183 slabs filed · 1 basement
Villa no 193 slabs filed · 1 basement
Villa no 203 slabs filed · 1 basement
Villa no 213 slabs filed · 1 basement
Villa no 223 slabs filed · 1 basement
Villa no 233 slabs filed · 1 basement
Villa no 243 slabs filed · 1 basement
Villa no 253 slabs filed · 1 basement
Villa no 263 slabs filed · 1 basement
Villa no 273 slabs filed · 1 basement
Villa n0 283 slabs filed · 1 basement
Club House1 slabs filed
The site: land, built-up area, survey number
Land
4.21 acres
Net of road and water setbacks
3.66 acres
Approved built-up area
1,24,038 sq ft
Buildings on the approved plan
29
Towers with homes
28
Lost to road widening or a lake's full tank level
24,053 sq ft
Survey number
Survey no96/1
Site boundaries
east
By Buffer and Musi River
west
By Existing 40ft Wide Approach Road
north
18 mts (name withheld) Master Plan Road Sy no 96P 97P
south
By Part of Survey no 96 Neighbours Land
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open Space0% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.