Filed update 18/01/2025 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Registration status
Registration number
P01100006393Filed with TG-RERA
Registered on
07/07/2023Filed with TG-RERA
Valid until
10/07/2028, extended (first certificate to 10/03/2028)Filed with TG-RERA
Extensions
At least 1, the latest valid until 10/07/2028Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Hari Hara Enclave Phase-1
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
BACHUGUDA VILLAGE & INOLE VILLAGE, SY.NO.174/P, BACHUGUDA VILLAGE, AND 104/P, INOLE VILLAGE, PATANCHERU, 502319Filed with TG-RERA
Mandal, district
PATANCHERU, SangareddyFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Patancheru≈ 25 min at peak11 min without traffic
Tellapur≈ 35 min at peak18 min without traffic
Kollur≈ 38 min at peak19 min without traffic
All 42 places
Lingampally≈ 44 min at peak20 min without traffic
Documents
Documents uploaded
43 of 50 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 84 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 150%
Building table 213%
Building table 320%
Building table 420%
Building table 520%
Building table 613%
Building table 750%
Building table 813%
Building table 91.4%
Building table 101.4%
Building table 111.4%
Building table 121.4%
Building table 131.4%
Building table 141.4%
Building table 1513%
Building table 1613%
Building table 171.4%
Building table 181.4%
Building table 1920%
Building table 201.4%
Building table 2113%
Building table 2213%
Building table 2313%
Building table 240%
Building table 2513%
Building table 2613%
Building table 271.4%
Building table 281.4%
Building table 291.4%
Building table 301.4%
Building table 311.4%
Building table 321.4%
Building table 3313%
Building table 3410%
Building table 3510%
Building table 3610%
Building table 371.4%
Building table 381.4%
Building table 3913%
Building table 4013%
Building table 4110%
Building table 421.4%
Building table 4313%
Building table 4413%
Building table 4550%
Building table 4613%
Building table 471.4%
Building table 481.4%
Building table 491.4%
Building table 501.4%
Building table 511.4%
Building table 5213%
Building table 5313%
Building table 541.4%
Building table 551.4%
Building table 561.4%
Building table 571.4%
Building table 5813%
Building table 5913%
Building table 601.4%
Building table 611.4%
Building table 621.4%
Building table 631.4%
Building table 641.4%
Building table 6513%
Building table 661.4%
Building table 671.4%
Building table 681.4%
Building table 691.4%
Building table 701.4%
Building table 711.4%
Building table 721.4%
Building table 731.4%
Building table 741.4%
Building table 751.4%
Building table 761.4%
Building table 771.4%
Building table 781.4%
Building table 791.4%
Building table 801.4%
Building table 811.4%
Building table 821.4%
Building table 831.4%
Building table 841.4%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 84 building tables, no project figure filed.
No change between PropMap.ai's reads of 06/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (7.3%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 121 other projects in Patancheru mandal with a booked count, 42 declare a larger share booked, 0 a smaller one and 79 the same, as last filed (records last updated 31/05/2019 to 17/11/2026).
84 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (84)
booked not booked, as declared.
House No 11 slabs filedHouse No 21 slabs filedHouse No 31 slabs filedHouse No 41 slabs filedHouse No 51 slabs filedHouse No 61 slabs filedHouse No 71 slabs filedHouse No 81 slabs filedHouse No 91 slabs filedHouse No 101 slabs filedHouse No 111 slabs filedHouse No 121 slabs filedHouse No 131 slabs filedHouse No 141 slabs filedHouse No 151 slabs filedHouse No 161 slabs filed
Miyapur
≈ 50 min at peak
22 min without traffic
Financial District≈ 51 min at peak27 min without traffic
Kokapet≈ 51 min at peak28 min without traffic
Raidurg (Mindspace)≈ 52 min at peak29 min without traffic
Gachibowli≈ 52 min at peak26 min without traffic
Khajaguda≈ 52 min at peak30 min without traffic
DLF Cyber City, Gachibowli≈ 52 min at peak26 min without traffic
Nanakramguda (Waverock)≈ 53 min at peak29 min without traffic
Kondapur≈ 55 min at peak27 min without traffic
HITEC City≈ 56 min at peak28 min without traffic
Narsingi≈ 57 min at peak30 min without traffic
Kukatpally≈ 61 min at peak28 min without traffic
Manikonda≈ 62 min at peak33 min without traffic
Madhapur≈ 63 min at peak31 min without traffic
Balanagar≈ 66 min at peak30 min without traffic
Shamirpet (Genome Valley area)≈ 66 min at peak38 min without traffic
Kompally≈ 66 min at peak35 min without traffic
Shamshabad≈ 67 min at peak40 min without traffic
Moosapet≈ 67 min at peak31 min without traffic
Jubilee Hills≈ 68 min at peak32 min without traffic
Mehdipatnam≈ 71 min at peak37 min without traffic
Jeedimetla≈ 73 min at peak37 min without traffic
Ameerpet≈ 79 min at peak36 min without traffic
Panjagutta≈ 80 min at peak36 min without traffic
Banjara Hills≈ 80 min at peak36 min without traffic
Lakdikapul≈ 80 min at peak40 min without traffic
Rajiv Gandhi International Airport≈ 85 min at peak45 min without traffic
Nampally station (Hyderabad Deccan)≈ 86 min at peak42 min without traffic
Begumpet≈ 87 min at peak39 min without traffic
Abids≈ 88 min at peak42 min without traffic
Koti≈ 90 min at peak44 min without traffic
Pocharam (Infosys campus area)≈ 94 min at peak56 min without traffic
Kacheguda station≈ 96 min at peak45 min without traffic
Secunderabad Junction≈ 96 min at peak41 min without traffic
Adibatla (Aerospace SEZ area)≈ 100 min at peak58 min without traffic
Dilsukhnagar≈ 102 min at peak49 min without traffic
Uppal≈ 107 min at peak49 min without traffic
LB Nagar≈ 109 min at peak53 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P01100006393 · by Sri Vedatraye Developers Private Limited · BACHUGUDA VILLAGE & INOLE VILLAGE, SY.NO.174/P, BACHUGUDA VILLAGE, AND 104/P, INOLE VILLAGE, PATANCHERU, 502319
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
10 items, none marked yet.
Ask the builder for
On recordRegistration is current until 10/07/2028
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 10/07/2028, when the registration ends?” See the registration dates
Asked SeenDate: Note:
An approval paper is filed on TG-RERA; its number is not stated
Ask for: the approval number, and the approved plan that carries it.Question: “What is the approval number, and does the plan show my tower and my floor?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 0 of 84 homes booked (record last updated 18/01/2025)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
15 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P01100006393
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P01100006393 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 84 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 14 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
House No 171 slabs filed
House No 181 slabs filed
House No 191 slabs filed
House No 201 slabs filed
House No 211 slabs filed
House No 221 slabs filed
House No 231 slabs filed
House No 241 slabs filed
House No 251 slabs filed
House No 261 slabs filed
House No 271 slabs filed
House No 281 slabs filed
House No 291 slabs filed
House No 301 slabs filed
House No 311 slabs filed
House No 321 slabs filed
House No 331 slabs filed
House No 341 slabs filed
House No 351 slabs filed
House No 361 slabs filed
House No 371 slabs filed
House No 381 slabs filed
House No 391 slabs filed
House No 401 slabs filed
House No 411 slabs filed
House No 421 slabs filed
House No 431 slabs filed
House No 441 slabs filed
House No 451 slabs filed
House No 461 slabs filed
House No 471 slabs filed
House No 481 slabs filed
House No 491 slabs filed
House No 501 slabs filed
House No 511 slabs filed
House No 521 slabs filed
House No 531 slabs filed
House No 541 slabs filed
House No 551 slabs filed
House No 561 slabs filed
House No 571 slabs filed
House No 581 slabs filed
House No 591 slabs filed
House No 601 slabs filed
House No 611 slabs filed
House No 621 slabs filed
House No 631 slabs filed
House No 641 slabs filed
House No 651 slabs filed
House No 661 slabs filed
House No 671 slabs filed
House No 681 slabs filed
House No 691 slabs filed
House No 701 slabs filed
House No 711 slabs filed
House No 721 slabs filed
House No 731 slabs filed
House No 741 slabs filed
House No 751 slabs filed
House No 761 slabs filed
House No 771 slabs filed
House No 781 slabs filed
House No 791 slabs filed
House No 801 slabs filed
House No 811 slabs filed
House No 821 slabs filed
House No 831 slabs filed
House No 841 slabs filed
The site: land, built-up area, survey number
Land
7.37 acres
Approved built-up area
1,00,797 sq ft
Buildings on the approved plan
84
Towers with homes
84
Lost to road widening or a lake's full tank level
None filed
Survey number
SY.NO.174/P-BACHUGUDA VILLAGE AND104/P-INOLE VILLAGE
Site boundaries
east
OTHERS LAND
west
OTHERS LAND
north
ROAD
south
OTHERS LAND
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths50% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting60% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station10% declared
Aggregate area of recreational Open Space0% declared
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.