Filed update 20/07/2026 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Plans
1 held
All 1 plan
Plans filed with TG-RERA 1
Filed with TG-RERA by the builder, as uploaded. People's names are covered. Not checked by PropMap.ai.
Registration status
Registration number
P02400010016Filed with TG-RERA
Registered on
16/04/2025Filed with TG-RERA
Valid until
16/08/2028, extended (first certificate to 16/04/2028)Filed with TG-RERA
Extensions
At least 1, the latest valid until 16/08/2028Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 06/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Kiara
It cannot know
price, availability, title, court cases or the site today.
SHANKARPALLY, Shankarpalle, 501203Filed with TG-RERA
Mandal, district
Shankarpalle, Ranga ReddyFiled with TG-RERA
Map position
Exact: the TG-RERA portal's map pinFiled with TG-RERA
Drive times, places nearby and other projects within 5 km
Drive times
Kollur≈ 52 min at peak17 min without traffic
Tellapur≈ 54 min at peak18 min without traffic
Patancheru≈ 63 min at peak21 min without traffic
All 42 places
Kokapet≈ 73 min at peak24 min without traffic
Financial District≈ 73 min at peak26 min without traffic
Raidurg (Mindspace)
Documents
Documents uploaded
30 of 38 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
1
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
30%Overall Percentage of Completion of the work done For the entire Building /Wing. Record last updated 20/07/2026; read from TG-RERA on 14/11/2026.No change since the read of 05/11/2026 in the registration dates, completion date or declared work. Of 220 other projects registered in 2025 with a declared work figure, 71 declare more, 149 less and 0 the same, as last filed (records last updated 14/02/2025 to 13/11/2026).
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: whole project (one table filed).
Task-by-task progress (10 tasks)
Excavation100%
Stilt Floor100%
X number of Podiums0%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
2, 2.5, 3 BHK · 1,130 to 1,640 sq ftFiled with TG-RERA
Types, sizes, bookings and the cost calculator
0 of 45 booked
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 38 other projects in Shankarpalle mandal with a booked count, 16 declare a larger share booked, 0 a smaller one and 22 the same, as last filed (records last updated 08/01/2019 to 13/11/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
20
20
1,130 to 1,263 sq ft
2.5 BHK
5
5
1,431 sq ft
3 BHK
20
20
1,539 to 1,640 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (1)
booked not booked, as declared.
KIARA5 floors with homes · 5 slabs filed · 45 homes, 0 booked
50 of 9
40 of 9
30 of 9
20 of 9
10 of 9
The site: land, built-up area, survey number
≈ 74 min at peak
30 min without traffic
Gachibowli≈ 74 min at peak28 min without traffic
Khajaguda≈ 74 min at peak28 min without traffic
DLF Cyber City, Gachibowli≈ 74 min at peak29 min without traffic
Nanakramguda (Waverock)≈ 75 min at peak28 min without traffic
Kondapur≈ 77 min at peak30 min without traffic
HITEC City≈ 78 min at peak31 min without traffic
Narsingi≈ 79 min at peak25 min without traffic
Lingampally≈ 82 min at peak28 min without traffic
Manikonda≈ 84 min at peak29 min without traffic
Madhapur≈ 85 min at peak33 min without traffic
Miyapur≈ 88 min at peak32 min without traffic
Shamshabad≈ 89 min at peak38 min without traffic
Jubilee Hills≈ 91 min at peak35 min without traffic
Mehdipatnam≈ 93 min at peak35 min without traffic
Kukatpally≈ 98 min at peak38 min without traffic
Banjara Hills≈ 102 min at peak38 min without traffic
Lakdikapul≈ 102 min at peak39 min without traffic
Balanagar≈ 102 min at peak40 min without traffic
Moosapet≈ 104 min at peak40 min without traffic
Panjagutta≈ 104 min at peak39 min without traffic
Shamirpet (Genome Valley area)≈ 105 min at peak49 min without traffic
Kompally≈ 105 min at peak46 min without traffic
Rajiv Gandhi International Airport≈ 107 min at peak43 min without traffic
Nampally station (Hyderabad Deccan)≈ 108 min at peak40 min without traffic
Ameerpet≈ 108 min at peak41 min without traffic
Abids≈ 110 min at peak42 min without traffic
Jeedimetla≈ 112 min at peak48 min without traffic
Koti≈ 112 min at peak43 min without traffic
Begumpet≈ 113 min at peak42 min without traffic
Kacheguda station≈ 118 min at peak44 min without traffic
Secunderabad Junction≈ 118 min at peak45 min without traffic
Adibatla (Aerospace SEZ area)≈ 122 min at peak56 min without traffic
Dilsukhnagar≈ 124 min at peak46 min without traffic
LB Nagar≈ 131 min at peak50 min without traffic
Uppal≈ 134 min at peak51 min without traffic
Pocharam (Infosys campus area)≈ 134 min at peak63 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02400010016 · by SVR Infra · SHANKARPALLY, Shankarpalle, 501203
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 16/08/2028
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 16/08/2028, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 000932/BP/HMDA/0245/SKP/2025 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 0 of 45 homes booked (record last updated 20/07/2026)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,130 to 1,640 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
15 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02400010016
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02400010016 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 1 building, the tallest with 5 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 30% of work (record last updated 20/07/2026)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 4 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
On recordA registered address is on record
Look at: that the site you are shown is at the registered address, and what stands on each side of it.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the registered address
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Land
0.50 acres
Net of road and water setbacks
0.50 acres
Approved built-up area
66,050 sq ft
Buildings on the approved plan
1
Towers with homes
1
Highest floor with homes
5 floors
Lost to road widening or a lake's full tank level
162 sq ft
Survey number
236/AA3/2/1, 236/AA3/2/2
Site boundaries
east
33 FEET WIDE ROAD and (name withheld)
west
ROAD HOUSE OF NEIGHBOURS and Plot of Neighbours
north
PLOTS OF NEIGHBOURS and House of Neighbours
south
(name withheld)
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & FootpathsNot provided
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water DrainsNot provided
Green Strip/TOT LOT/Park0% declared
Street LightingNot provided
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving StationNot provided
Aggregate area of recreational Open SpaceNot provided
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Exact location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.