Filed update 14/03/2023 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
Registration status
Registration number
P01100006415Filed with TG-RERA
Registered on
07/07/2023Filed with TG-RERA
Valid until
30/12/2027Filed with TG-RERA
Extensions
At least 1, the latest valid until 30/04/2028Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
West winds
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Exact: the TG-RERA portal's map pinFiled with TG-RERA
Drive times, places nearby and other projects within 5 km
Drive times
Patancheru≈ 46 min at peak15 min without traffic
Tellapur≈ 48 min at peak17 min without traffic
Kollur≈ 51 min at peak18 min without traffic
All 42 places
Financial District≈ 64 min at peak27 min without traffic
Kokapet≈ 64 min at peak27 min without traffic
Raidurg (Mindspace)
Documents
Documents uploaded
17 of 25 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 14 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 14/11/2026.
Building table 14.5%
Building table 24.5%
Building table 34.5%
Building table 44.5%
Building table 54.5%
Building table 60%
Building table 70%
Building table 80%
Building table 94.5%
Building table 104.5%
Building table 114.5%
Building table 124.5%
Building table 130%
Building table 140%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 14 building tables, no project figure filed.
No change between PropMap.ai's reads of 05/11/2026 and 14/11/2026 in the registration dates, completion date or declared work (2.9%).
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 121 other projects in Patancheru mandal with a booked count, 42 declare a larger share booked, 0 a smaller one and 79 the same, as last filed (records last updated 31/05/2019 to 17/11/2026).
42 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
DLF Cyber City, Gachibowli≈ 65 min at peak30 min without traffic
Lingampally≈ 65 min at peak24 min without traffic
Nanakramguda (Waverock)≈ 66 min at peak28 min without traffic
Kondapur≈ 68 min at peak31 min without traffic
HITEC City≈ 69 min at peak31 min without traffic
Narsingi≈ 70 min at peak28 min without traffic
Miyapur≈ 71 min at peak27 min without traffic
Manikonda≈ 75 min at peak32 min without traffic
Madhapur≈ 76 min at peak34 min without traffic
Shamshabad≈ 80 min at peak39 min without traffic
Jubilee Hills≈ 82 min at peak36 min without traffic
Kukatpally≈ 82 min at peak32 min without traffic
Mehdipatnam≈ 84 min at peak37 min without traffic
Balanagar≈ 86 min at peak34 min without traffic
Moosapet≈ 88 min at peak35 min without traffic
Shamirpet (Genome Valley area)≈ 90 min at peak44 min without traffic
Kompally≈ 90 min at peak40 min without traffic
Banjara Hills≈ 93 min at peak39 min without traffic
Lakdikapul≈ 93 min at peak41 min without traffic
Panjagutta≈ 95 min at peak40 min without traffic
Jeedimetla≈ 97 min at peak42 min without traffic
Rajiv Gandhi International Airport≈ 98 min at peak44 min without traffic
Nampally station (Hyderabad Deccan)≈ 99 min at peak43 min without traffic
Ameerpet≈ 99 min at peak40 min without traffic
Abids≈ 100 min at peak44 min without traffic
Koti≈ 103 min at peak45 min without traffic
Begumpet≈ 104 min at peak43 min without traffic
Kacheguda station≈ 109 min at peak46 min without traffic
Secunderabad Junction≈ 109 min at peak46 min without traffic
Adibatla (Aerospace SEZ area)≈ 113 min at peak57 min without traffic
Dilsukhnagar≈ 115 min at peak49 min without traffic
Pocharam (Infosys campus area)≈ 118 min at peak62 min without traffic
LB Nagar≈ 122 min at peak53 min without traffic
Uppal≈ 124 min at peak53 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P01100006415 · by Creative Homes · BHANUR, PATANCHERU, 502305
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
10 items, none marked yet.
Ask the builder for
On recordRegistration is current until 30/04/2028
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 30/04/2028, when the registration ends?” See the registration dates
Asked SeenDate: Note:
An approval paper is filed on TG-RERA; its number is not stated
Ask for: the approval number, and the approved plan that carries it.Question: “What is the approval number, and does the plan show my tower and my floor?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 0 of 42 homes booked (record last updated 14/03/2023)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
6 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P01100006415
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P01100006415 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 14 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 10 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
On recordA registered address is on record
Look at: that the site you are shown is at the registered address, and what stands on each side of it.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the registered address
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Net of road and water setbacks
0.99 acres
Approved built-up area
24,036 sq ft
Buildings on the approved plan
14
Towers with homes
14
Lost to road widening or a lake's full tank level
4,221 sq ft
Survey number
353/AA1,353/AA2
Site boundaries
east
ROAD
west
PART OF SY NO 353
north
SY NO354 LAND OF (name withheld)
south
PART OF SY NO 353 LAND OF (name withheld)
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & Footpaths0% declared
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Exact location
Places around this project are not counted yet: locusPro, the location record PropMap.ai uses, covers West Hyderabad only so far. The map shows the project's position only.