Filed update 24/04/2025 · read 24/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 24/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 24/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Registration status
Registration number
P02200003689Filed with TG-RERA
Registered on
03/12/2021Filed with TG-RERA
Valid until
30/04/2027, extended (first certificate to 31/12/2025)Filed with TG-RERA
Extensions
At least 1, the latest valid until 30/04/2027Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 24/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Shreerath Apartments
It cannot know
price, availability, title, court cases or the site today.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 2.5 km, and a few were over 5 km off.
Kukatpally≈ 14 min at peak6 min without traffic
Balanagar≈ 19 min at peak8 min without traffic
Miyapur≈ 20 min at peak8 min without traffic
All 42 places
Moosapet≈ 20 min at peak9 min without traffic
HITEC City≈ 29 min at peak
Documents
Documents uploaded
51 of 59 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
56.5%Overall Percentage of Completion of the work done For the entire Building /Wing. Record last updated 24/04/2025; read from TG-RERA on 24/11/2026. One reading so far, so no change over time is shown. Of 520 other projects registered in 2021 with a declared work figure, 165 declare more, 355 less and 0 the same, as last filed (records last updated 12/12/2019 to 13/11/2026).
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: whole project (one table filed).
Task-by-task progress (10 tasks)
Excavation100%
Stilt Floor80%
X number of Podiums80%
X number of Basement(s) and Plinth80%
X number of Slabs of Super Structure60%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises45%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing40%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 130 other projects in Bachupally mandal with a booked count, 51 declare a larger share booked, 0 a smaller one and 79 the same, as last filed (records last updated 09/01/2019 to 30/10/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
546
546
955 to 1,805 sq ft
3 BHK
79
79
1,565 to 1,805 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing. 3 other units are filed without a bedroom type, such as clubhouses or shops.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (1)
booked not booked, as declared.
Shreerath Apartments24 floors with homes · 24 slabs filed · 3 basements · 625 homes, 0 booked
240 of 26
230 of 26
220 of 26
21
10 min without traffic
Ameerpet≈ 33 min at peak14 min without traffic
Lingampally≈ 33 min at peak14 min without traffic
Panjagutta≈ 33 min at peak14 min without traffic
Raidurg (Mindspace)≈ 34 min at peak12 min without traffic
Kondapur≈ 36 min at peak13 min without traffic
Madhapur≈ 38 min at peak13 min without traffic
Lakdikapul≈ 40 min at peak17 min without traffic
Begumpet≈ 41 min at peak17 min without traffic
DLF Cyber City, Gachibowli≈ 42 min at peak15 min without traffic
Jubilee Hills≈ 42 min at peak15 min without traffic
Banjara Hills≈ 42 min at peak18 min without traffic
Patancheru≈ 42 min at peak19 min without traffic
Gachibowli≈ 44 min at peak16 min without traffic
Nampally station (Hyderabad Deccan)≈ 46 min at peak20 min without traffic
Khajaguda≈ 47 min at peak16 min without traffic
Abids≈ 47 min at peak20 min without traffic
Financial District≈ 48 min at peak18 min without traffic
Jeedimetla≈ 48 min at peak18 min without traffic
Mehdipatnam≈ 48 min at peak21 min without traffic
Koti≈ 50 min at peak22 min without traffic
Secunderabad Junction≈ 52 min at peak19 min without traffic
Narsingi≈ 54 min at peak21 min without traffic
Manikonda≈ 54 min at peak19 min without traffic
Nanakramguda (Waverock)≈ 54 min at peak22 min without traffic
Kacheguda station≈ 55 min at peak23 min without traffic
Tellapur≈ 56 min at peak26 min without traffic
Kokapet≈ 56 min at peak22 min without traffic
Kompally≈ 57 min at peak22 min without traffic
Shamirpet (Genome Valley area)≈ 59 min at peak29 min without traffic
Kollur≈ 59 min at peak28 min without traffic
Dilsukhnagar≈ 62 min at peak27 min without traffic
Shamshabad≈ 69 min at peak32 min without traffic
LB Nagar≈ 70 min at peak31 min without traffic
Uppal≈ 71 min at peak27 min without traffic
Rajiv Gandhi International Airport≈ 87 min at peak38 min without traffic
Pocharam (Infosys campus area)≈ 87 min at peak40 min without traffic
Adibatla (Aerospace SEZ area)≈ 102 min at peak47 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02200003689 · by Unnati Buildtech · Nizampet, Bachupally, 500090
Built by rule from this project's TG-RERA record, read by PropMap.ai on 24/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 30/04/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 30/04/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 017100/MED/R1/U6/HMDA/2016 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 0 of 628 homes booked (record last updated 24/04/2025)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (955 to 1,805 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
7 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02200003689
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200003689 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 1 building, the tallest with 24 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 56.5% of work (record last updated 24/04/2025)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 11 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
0 of 25
200 of 28
190 of 28
180 of 28
170 of 28
160 of 28
150 of 28
140 of 28
130 of 28
120 of 28
110 of 27
100 of 28
90 of 28
80 of 28
70 of 28
60 of 28
50 of 28
40 of 28
30 of 18
20 of 18
10 of 11
The site: land, built-up area, survey number
Land
2.95 acres
Net of road and water setbacks
2.35 acres
Approved built-up area
6,83,468 sq ft
Buildings on the approved plan
1
Towers with homes
1
Highest floor with homes
24 floors
Lost to road widening or a lake's full tank level
25,914 sq ft
Survey number
326/P
Site boundaries
east
Neighbours Land
west
Neighbours Land
north
100 Feet Road
south
by Land of (name withheld) and others
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & FootpathsNot provided
Water Supply0% declared
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy management0% declared
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.