Filed update 25/03/2025 · read 20/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 20/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 20/11/2026.
Pictures and plans
11 held
All 11 pictures and plans
Pictures and plans 11
From the builder's website. Pictures may be artist's impressions.
Registration status
Registration number
P02200005506Filed with TG-RERA
Registered on
14/12/2022Filed with TG-RERA
Valid until
15/10/2028Filed with TG-RERA
Extensions
At least 1, the latest valid until 15/02/2029Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 20/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Apr Praveens Hillside
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Hill County Road, Bachupally, 500090Filed with TG-RERA
Mandal, district
Bachupally, Medchal-MalkajgiriFiled with TG-RERA
Map position
Approximate: placed from the registered address
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 4 km, and a few were over 5 km off.
Kukatpally≈ 25 min at peak11 min without traffic
Balanagar≈ 30 min at peak13 min without traffic
Miyapur≈ 31 min at peak12 min without traffic
All 42 places
Moosapet≈ 32 min at peak14 min without traffic
HITEC City≈ 40 min at peak
Documents
Documents uploaded
15 of 24 document slotsFiled with TG-RERA
Document groups on the record
3 (6 documents)Filed with TG-RERA
Pictures and plans held
11
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
No overall figure filed for the project. The record files 176 building tables and no project figure; each is shown as filed, in the record's order, and none is averaged. Read from TG-RERA on 20/11/2026.
Building table 135%
Building table 235%
Building table 335%
Building table 435%
Building table 535%
Building table 635%
Building table 735%
Building table 835%
Building table 935%
Building table 1037.5%
Building table 1137.5%
Building table 1242.5%
Building table 1342.5%
Building table 1442.5%
Building table 1542.5%
Building table 1642.5%
Building table 1742.5%
Building table 1840%
Building table 1940%
Building table 2040%
Building table 2140%
Building table 2240%
Building table 2340%
Building table 2440%
Building table 2535%
Building table 2637.5%
Building table 2737.5%
Building table 2833%
Building table 2933%
Building table 3033%
Building table 3140%
Building table 3233%
Building table 3337.5%
Building table 3442.5%
Building table 3535%
Building table 3637.5%
Building table 3740%
Building table 3835%
Building table 3937.5%
Building table 4040%
Building table 4140%
Building table 4240%
Building table 4340%
Building table 4442.5%
Building table 4542.5%
Building table 4640%
Building table 4740%
Building table 4840%
Building table 4942.5%
Building table 5042.5%
Building table 5140%
Building table 5242.5%
Building table 5340%
Building table 5440%
Building table 5542.5%
Building table 5640%
Building table 5740%
Building table 5840%
Building table 5940%
Building table 6040%
Building table 6140%
Building table 6240%
Building table 6340%
Building table 6440%
Building table 6540%
Building table 6640%
Building table 6740%
Building table 6840%
Building table 6940%
Building table 7040%
Building table 7140%
Building table 7240%
Building table 7340%
Building table 7440%
Building table 7540%
Building table 7640%
Building table 7742.5%
Building table 7840%
Building table 7940%
Building table 8040%
Building table 8140%
Building table 8240%
Building table 8340%
Building table 8440%
Building table 8540%
Building table 8640%
Building table 8740%
Building table 8840%
Building table 8940%
Building table 9040%
Building table 9140%
Building table 9240%
Building table 9340%
Building table 9440%
Building table 9540%
Building table 9640%
Building table 9740%
Building table 9840%
Building table 9940%
Building table 10040%
Building table 10140%
Building table 10242.5%
Building table 10340%
Building table 10440%
Building table 10542.5%
Building table 10642.5%
Building table 10740%
Building table 10840%
Building table 10940%
Building table 11040%
Building table 11137.5%
Building table 11237.5%
Building table 11342.5%
Building table 11440%
Building table 11540%
Building table 11640%
Building table 11740%
Building table 11840%
Building table 11940%
Building table 12040%
Building table 12140%
Building table 12240%
Building table 12340%
Building table 12440%
Building table 12540%
Building table 12640%
Building table 12740%
Building table 12840%
Building table 12940%
Building table 13040%
Building table 13140%
Building table 13240%
Building table 13340%
Building table 13440%
Building table 13540%
Building table 13637.5%
Building table 13742.5%
Building table 13842.5%
Building table 13940%
Building table 14042.5%
Building table 14140%
Building table 14242.5%
Building table 14340%
Building table 14440%
Building table 14540%
Building table 14637.5%
Building table 14735%
Building table 14835%
Building table 14940%
Building table 15040%
Building table 15140%
Building table 15237.5%
Building table 15335%
Building table 15435%
Building table 15535%
Building table 15635%
Building table 15737.5%
Building table 15835%
Building table 15935%
Building table 16037.5%
Building table 16140%
Building table 16240%
Building table 16340%
Building table 16440%
Building table 16540%
Building table 16640%
Building table 16740%
Building table 16840%
Building table 16940%
Building table 17037.5%
Building table 17137.5%
Building table 17237.5%
Building table 17333%
Building table 17440%
Building table 17533%
Building table 17633%
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: 176 building tables, no project figure filed.
This filing's proposed completion date is 15/02/2029: of 3 other filings under the same TG-RERA promoter record, 1 has a later date, 2 an earlier one and 0 the same, as last filed (records last updated 27/06/2023 to 24/05/2025).
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 130 other projects in Bachupally mandal with a booked count, 41 declare a larger share booked, 89 a smaller one and 0 the same, as last filed (records last updated 09/01/2019 to 30/10/2026).
176 units filed with TG-RERA without a bedroom type.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (176)
booked not booked, as declared.
Villa No 12 slabs filedVilla No 22 slabs filedVilla No 32 slabs filedVilla No 42 slabs filedVilla No 52 slabs filedVilla No 62 slabs filedVilla No 72 slabs filedVilla No 82 slabs filedVilla No 92 slabs filedVilla No 102 slabs filedVilla No 112 slabs filedVilla No 122 slabs filedVilla No 132 slabs filedVilla No 142 slabs filedVilla No 152 slabs filedVilla No 162 slabs filed
15 min without traffic
Ameerpet≈ 44 min at peak19 min without traffic
Lingampally≈ 44 min at peak17 min without traffic
Panjagutta≈ 44 min at peak19 min without traffic
Raidurg (Mindspace)≈ 45 min at peak17 min without traffic
Patancheru≈ 46 min at peak21 min without traffic
Kondapur≈ 47 min at peak17 min without traffic
Madhapur≈ 48 min at peak18 min without traffic
Lakdikapul≈ 50 min at peak22 min without traffic
Jeedimetla≈ 51 min at peak18 min without traffic
Begumpet≈ 52 min at peak22 min without traffic
Tellapur≈ 53 min at peak25 min without traffic
DLF Cyber City, Gachibowli≈ 53 min at peak19 min without traffic
Jubilee Hills≈ 53 min at peak20 min without traffic
Banjara Hills≈ 53 min at peak23 min without traffic
Gachibowli≈ 56 min at peak20 min without traffic
Shamirpet (Genome Valley area)≈ 56 min at peak28 min without traffic
Kompally≈ 56 min at peak19 min without traffic
Kollur≈ 56 min at peak26 min without traffic
Nampally station (Hyderabad Deccan)≈ 57 min at peak25 min without traffic
Khajaguda≈ 58 min at peak21 min without traffic
Abids≈ 58 min at peak25 min without traffic
Financial District≈ 59 min at peak23 min without traffic
Mehdipatnam≈ 59 min at peak26 min without traffic
Koti≈ 61 min at peak26 min without traffic
Secunderabad Junction≈ 63 min at peak24 min without traffic
Narsingi≈ 65 min at peak25 min without traffic
Manikonda≈ 65 min at peak24 min without traffic
Nanakramguda (Waverock)≈ 65 min at peak26 min without traffic
Kacheguda station≈ 66 min at peak28 min without traffic
Kokapet≈ 67 min at peak26 min without traffic
Dilsukhnagar≈ 73 min at peak32 min without traffic
Shamshabad≈ 80 min at peak36 min without traffic
LB Nagar≈ 81 min at peak36 min without traffic
Uppal≈ 82 min at peak32 min without traffic
Pocharam (Infosys campus area)≈ 84 min at peak45 min without traffic
Rajiv Gandhi International Airport≈ 98 min at peak42 min without traffic
Adibatla (Aerospace SEZ area)≈ 112 min at peak52 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02200005506 · by Apr Projects · Hill County Road, Bachupally, 500090
Built by rule from this project's TG-RERA record, read by PropMap.ai on 20/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
10 items, none marked yet.
Ask the builder for
On recordRegistration is current until 15/02/2029
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 15/02/2029, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 38/LO/Plg/HMDA/2022 is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 52 of 176 homes booked (record last updated 25/03/2025)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
1 title file is uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (5)
On recordRERA number on record: P02200005506
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200005506 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 176 buildings
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
The filing lists 10 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
Sewerage (Chamber, Lines, Septic Tank , STP)0% declared
Storm Water Drains0% declared
Green Strip/TOT LOT/Park0% declared
Street Lighting0% declared
Community Buildings0% declared
Treatment And Disposal Of Sewage And Sullage Water0% declared
Solid Waste Management And DisposalNot provided
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety RequirementsNot provided
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Declared by the builder, not inspected.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.