Filed update 02/12/2021 · read 14/11/2026 · See filing >
What the record shows
Registered now. As published on TG-RERA. TG-RERA record read on 14/11/2026.
Findings from the TG-RERA record
No finding. PropMap.ai's rules (registration dates, extensions, status, filed work) found nothing to report in this project's TG-RERA record, read 14/11/2026.
This covers only those rules and that record. It is not a clear title or a legal all-clear.
Orders and complaints are not shown on this page. TG-RERA orders that name this project appear only in its Background Check report, after a compliance review, with the sources searched and their dates.
Registration status
Registration number
P02200003644Filed with TG-RERA
Registered on
03/12/2021Filed with TG-RERA
Valid until
11/08/2027Filed with TG-RERA
Extensions
At least 1, the latest valid until 11/12/2027Filed with TG-RERA
Source: Telangana Real Estate Regulatory Authority (TG-RERA), rera.telangana.gov.in. Reproduced as published; fetched 14/11/2026. The records compared above were read from 14/11/2026 to 24/11/2026. PropMap.ai reports what public records say. It is not legal advice.
Maanvi Alpha Homes
It cannot know
price, availability, title, court cases or the site today.
Drive times, places nearby and other projects within 5 km
Drive times
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 4 km, and a few were over 5 km off.
Kukatpally≈ 25 min at peak11 min without traffic
Balanagar≈ 30 min at peak13 min without traffic
Miyapur≈ 31 min at peak12 min without traffic
All 42 places
Moosapet≈ 32 min at peak14 min without traffic
HITEC City≈ 40 min at peak
Documents
Documents uploaded
12 of 20 document slotsFiled with TG-RERA
Document groups on the record
3 (7 documents)Filed with TG-RERA
Pictures and plans held
0
Task-by-task progress, dated certificates and changes between reads
Declared progress as declared by the builder to TG-RERA, not inspected
0%Overall Percentage of Completion of the work done For the entire Building /Wing. Record last updated 02/12/2021; read from TG-RERA on 14/11/2026.No change since the read of 11/11/2026 in the registration dates, completion date or declared work. Of 520 other projects registered in 2021 with a declared work figure, 341 declare more, 0 less and 179 the same, as last filed (records last updated 12/12/2019 to 13/11/2026).
Source: TG-RERA project record, construction table (Tasks / Activity), a web record, not a signed certificate. Dates: the date PropMap.ai read the record; the table gives no as-of date. Percentage of work, as declared by the builder; the total it is measured against is not stated. Covers: whole project (one table filed).
Task-by-task progress (10 tasks)
Excavation0%
Stilt Floor0%
X number of Podiums0%
X number of Basement(s) and Plinth0%
X number of Slabs of Super Structure0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Past the proposed completion date, not shown as completed
0
Shown as completed
0
TG-RERA complaint orders
Not counted
Not counted on this page, so this is not a count of zero. TG-RERA orders that name a project appear only in that project's Background Check report, after a compliance review.
A passed date does not mean a project is late or unfinished: the filings rarely record completion.
As declared to TG-RERA. The filing gives counts, not which flat is free, so confirm any flat with the builder. Of 130 other projects in Bachupally mandal with a booked count, 51 declare a larger share booked, 0 a smaller one and 79 the same, as last filed (records last updated 09/01/2019 to 30/10/2026).
Home types
Type
Homes
Not booked
Saleable size
2 BHK
40
40
1,225 to 1,300 sq ft
3 BHK
20
20
1,550 sq ft
Saleable area, not carpet area. Ask for the carpet area in writing.
No price on record. PropMap.ai does not estimate prices. Type the builder's quote
What you type is kept on this device only and is not sent to PropMap.ai. PropMap.ai holds no price of its own: each figure below is an estimate from your quote and from the tax and duty rates listed with their sources.
Towers, floor by floor (1)
booked not booked, as declared.
ALPHA HOMES5 floors with homes · 5 slabs filed · 1 basement · 60 homes, 0 booked
50 of 12
40 of 12
30 of 12
20 of 12
10 of 12
15 min without traffic
Ameerpet≈ 44 min at peak19 min without traffic
Lingampally≈ 44 min at peak17 min without traffic
Panjagutta≈ 44 min at peak19 min without traffic
Raidurg (Mindspace)≈ 45 min at peak17 min without traffic
Patancheru≈ 46 min at peak21 min without traffic
Kondapur≈ 47 min at peak17 min without traffic
Madhapur≈ 48 min at peak18 min without traffic
Lakdikapul≈ 50 min at peak22 min without traffic
Jeedimetla≈ 51 min at peak18 min without traffic
Begumpet≈ 52 min at peak22 min without traffic
Tellapur≈ 53 min at peak25 min without traffic
DLF Cyber City, Gachibowli≈ 53 min at peak19 min without traffic
Jubilee Hills≈ 53 min at peak20 min without traffic
Banjara Hills≈ 53 min at peak23 min without traffic
Gachibowli≈ 56 min at peak20 min without traffic
Shamirpet (Genome Valley area)≈ 56 min at peak28 min without traffic
Kompally≈ 56 min at peak19 min without traffic
Kollur≈ 56 min at peak26 min without traffic
Nampally station (Hyderabad Deccan)≈ 57 min at peak25 min without traffic
Khajaguda≈ 58 min at peak21 min without traffic
Abids≈ 58 min at peak25 min without traffic
Financial District≈ 59 min at peak23 min without traffic
Mehdipatnam≈ 59 min at peak26 min without traffic
Koti≈ 61 min at peak26 min without traffic
Secunderabad Junction≈ 63 min at peak24 min without traffic
Narsingi≈ 65 min at peak25 min without traffic
Manikonda≈ 65 min at peak24 min without traffic
Nanakramguda (Waverock)≈ 65 min at peak26 min without traffic
Kacheguda station≈ 66 min at peak28 min without traffic
Kokapet≈ 67 min at peak26 min without traffic
Dilsukhnagar≈ 73 min at peak32 min without traffic
Shamshabad≈ 80 min at peak36 min without traffic
LB Nagar≈ 81 min at peak36 min without traffic
Uppal≈ 82 min at peak32 min without traffic
Pocharam (Infosys campus area)≈ 84 min at peak45 min without traffic
Rajiv Gandhi International Airport≈ 98 min at peak42 min without traffic
Adibatla (Aerospace SEZ area)≈ 112 min at peak52 min without traffic
How these are estimated
Peak: peak estimate: road-type speeds calibrated to TomTom Traffic Index 2025 for Hyderabad (about 15 km/h in the city); not live traffic, and a real rush hour can differ. Without traffic: free-flow estimate from OpenStreetMap roads (no traffic).
Chosen from public records by position, not ranked. Nobody can pay to appear here.
Filed documents and where each fact comes from
Filed by the builder on TG-RERA. Each link opens the copy held by the regulator, which may be slow or a scanned page. PropMap.ai links to these papers; it has not checked what they say.
RERA P02200003644 · by Maanvi Projects · BACHUPALLY, 500090
Built by rule from this project's TG-RERA record, read by PropMap.ai on 14/11/2026. Figures are as the builder declared them. The marks and notes are the buyer's own.
Your marks stay on this device. What you mark, the date and your note are not sent to PropMap.ai or to anyone else, and they are lost if this browser's data is cleared. PropMap.ai counts that a mark was made on this project, never what it says. PropMap.ai arranges no visit and sends nothing to the builder.
12 items, none marked yet.
Ask the builder for
On recordRegistration is current until 11/12/2027
Ask for: the possession date, written into the draft of your agreement.Question: “Does the possession date in my agreement fall before 11/12/2027, when the registration ends?” See the registration dates
Asked SeenDate: Note:
On recordApproval number 045029/MED/R1/U6/HMD is declared to TG-RERA
Ask for: the approved plan that carries this number, showing your tower and floor.Question: “Does the approved plan with this number show my tower, my floor and the flat as offered?” See approvals
Asked SeenDate: Note:
On recordThe builder declared 0 of 60 homes booked (record last updated 02/12/2021)
Ask for: the list of unsold homes of the type you want, with floor and facing.Question: “Which homes of my type are unsold today?” See the booked count
Asked SeenDate: Note:
Filed sizes (1,225 to 1,550 sq ft) are saleable area, not carpet area
Ask for: the carpet area of the flat offered, in writing, and the same figure in the agreement.Question: “What is the carpet area of this flat, and which figure will the agreement carry?” See the filed sizes
Asked SeenDate: Note:
PropMap.ai holds no prices
Ask for: the all-in cost in writing: the price, every other charge, taxes and registration costs, line by line.Question: “What is the total I will pay for this flat, with every charge and tax listed?”
Asked SeenDate: Note:
4 title files are uploaded to TG-RERA; PropMap.ai has not read them
Ask for: copies of the title papers for the land, for your lawyer to read. PropMap.ai does not check title: no flag found is not a clear title.Question: “May my lawyer have copies of the title papers, and of any loan or claim on the land?” See the filed title papers
Asked SeenDate: Note:
Look at on site (6)
On recordRERA number on record: P02200003644
Look at: the registration number printed on the site board, the brochure and any receipt.Question: “Is P02200003644 the number on everything you give me?”
Asked SeenDate: Note:
ConstructionThe filing shows 1 building, the tallest with 5 floors of homes
Look at: how many buildings stand, and the floor the structure has reached in yours. Take dated photos.Question: “Which floor has the structure reached in my tower?” See the filed buildings
Asked SeenDate: Note:
ConstructionThe builder declared 0% of work (record last updated 02/12/2021)
Look at: whether what stands looks like that share of the work: structure, outside finish, lifts and fittings.Question: “What work is going on this month, and what is left before handover?” See declared progress
Asked SeenDate: Note:
The filing lists 5 common facilities
Look at: which of them exist today, such as roads, water supply, drains and open space.Question: “Which shared facilities are finished, and when will the rest be?” See the filed facilities
Asked SeenDate: Note:
PropMap.ai's map position for this project is approximate
Look at: the exact entrance, and what stands on each side of the site.Question: “Is this the plot in the registration, and what is planned on the land next to it?” See the location
Asked SeenDate: Note:
Drive times on this page are estimates, not measured traffic
Look at: the drive to your daily destination, timed by you at the hour you would travel.Question: “Which road do residents take at peak hour?” See the estimates
Asked SeenDate: Note:
Is this home right for you? Four questions, kept on this device
Is this home right for you?
Answer four questions once, and each project says in words which of your needs its record meets. Kept on this device only.
The site: land, built-up area, survey number
Land
0.61 acres
Approved built-up area
67,520 sq ft
Buildings on the approved plan
1
Towers with homes
1
Highest floor with homes
5 floors
Lost to road widening or a lake's full tank level
None filed
Survey number
145/B
Site boundaries
east
LAND IN SY NO 145
west
SY NO 186
north
SY NO 145 PART AND 40 WIDE ROAD
south
SY NO 157 PART
Filed with TG-RERA. People's names are withheld.
Common facilities filed with TG-RERA (14)
Internal Roads & FootpathsNot provided
Water SupplyNot provided
Sewerage (Chamber, Lines, Septic Tank , STP)Not provided
Storm Water DrainsNot provided
Green Strip/TOT LOT/Park0% declared
Street LightingNot provided
Community BuildingsNot provided
Treatment And Disposal Of Sewage And Sullage WaterNot provided
Solid Waste Management And Disposal0% declared
Water Conservation, Rain water Harvesting0% declared
Energy managementNot provided
Fire Protection And Fire Safety Requirements0% declared
Electrical Meter Room, Sub-Station, Receiving Station0% declared
Aggregate area of recreational Open SpaceNot provided
Approximate position: placed from the registered address, not the site itself. In our check 4 in 5 such positions were within about 4 km, and a few were over 5 km off.
Labels: Filed with TG-RERA (the builder's filing or the regulator's record), Builder's site says, Measured from open map data, Conflict, Not known. A filing and the builder's own site agreeing does not prove a figure: both come from the builder.
Project location Approximate location
This project's position is approximate: it was placed from the registered address and may be over 2 km from the site. Distances here are measured from that position, so treat them as approximate too.
Approximate position: may be over 2 km off, so distances are approximate too.